For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 917.22 — Inspection, sampling and permitting

Codified Ordinances of the City of Delaware, Ohio (Codified through Ordinance No. 26-37, enacted September 14, 2026. (Supp. No. 28)) · Delaware Codified Ordinances § 917.22

Corpus is an independent public-information project, not the official City of Delaware website. Stable reference: corpuslaw.us/code/52034c04-9562-4c4a-81b3-f713e0c29add

917.22. - Inspection, sampling and permitting.

No person shall discharge sewage, industrial wastes or other wastes to any sewer within the jurisdiction of the Authority and/or to the POTW without having first complied with the terms of this chapter. The City reserves the right to reject new or modified wastewater discharges from entering the POTW. No industrial users may discharge to the POTW without first obtaining written approval from the City. (a) Wastewater Discharge Data Disclosure. (1) General Permits Disclosure. All industrial dischargers proposing to connect to or to discharge sewage, industrial wastes and other wastes to the POTW shall comply with all terms of this chapter within ninety days after the effective date of this chapter or within ninety days prior to commencing discharge for a new source. Existing sources, which, due to changes in federal regulations, become classified as categorical after the effective date of this chapter shall file a disclosure form to the Authority within 180 days of promulgation of such federal regulation. This report shall state whether the applicable pretreatment standards or requirements are being met on a consistent basis and, if not, what additional operation and maintenance and/or pretreatment is necessary to bring the discharger into compliance with the applicable pretreatment standards or requirements and shall include a compliance schedule as specified in Section 917.232. This report shall include the certification statement and shall be signed by an authorized representative as required in subsection (b)(4) hereof. Disclosure forms are available from the office of the Superintendent of Wastewater Treatment. The Authority shall evaluate the complete disclosure form and data and may require additional information. Within thirty days after full evaluation and acceptance of the data furnished, the Authority shall notify the discharger of the Authority's acceptance thereof. (2) Disclosure Forms. Significant industrial dischargers shall complete and file with the Authority a disclosure declaration in the form prescribed by the Authority. Such forms shall include, but not be limited to: A. Identifying Information. The name and address of the facility including the name of the operator and owner; B. Permits. A list of any and all environmental control permits held by or for the facility; C. Description of Operations. A brief description of the nature, average rate of productionand the Standard Industrial Classification (SIC) code (if applicable) of the operation(s) carried out. This description shall include a schematic diagram of the process, indicating points of discharge to the sanitary sewer from the regulated process; D. Flow Measurement. The measured average and maximum daily flow from each of the following: 1. Regulated process streams. 2. Other wastestreams which are to be used in calculations based on the combined wastestream formula described in 40 CFR 403.6(e). The Authority may allow use of estimated flows where deemed appropriate by the Authority. E. Measurement of Pollutants. 1. The user shall identify the pretreatment standards applicable to each regulated process. 2. The user shall submit the results of sampling and analysis identifying the nature and concentration (or mass, where required by the City) of regulated pollutants in each regulated process. The sample shall be representative of daily operations, and the daily average, and daily maximum levels shall be reported. In cases where the pretreatment standard requires compliance with a best management practice or pollution prevention alternative, the user shall submit documentation as required by the City or the applicable pretreatment standards to determine compliance with the standard. 3. Sampling, whether flow proportioned, time proportioned, grab or multiple grab, shall be done in accordance with the method specified by the Authority. 4. At least one representative sample is required in order to compile the data necessary to comply with the requirements of this paragraph. 5. Samples shall be taken immediately downstream of the pretreatment facility if such facility exists, or immediately downstream of the regulated process if no pretreatment facility exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment the user should measure the flows and concentrations necessary to allow use of the combined wastestream formula of 40 CFR 403.6(e) in order to evaluate compliance with the pretreatment standards. Where an alternate concentration or mass limit has been calculated in accordance with 40 CFR 403.6(e) this adjusted limit along with supporting data shall be submitted to the City. 6. The report shall state whether the applicable pretreatment standards or requirements are being met on a consistent basis and, if not, what additional operation and maintenance and/or pretreatment is necessary to bring the discharger into compliance with the applicable pretreatment standards or requirements and shall include a compliance schedule. The following conditions shall apply to the schedule required by subsection (b)(E)6. of this section: (i) The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the industrial user to meet the applicable categorical Pretreatment Standards (e.g., hiring an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, etc.). (ii) No increment referred to in subsection (c)(1) of this section shall exceed 9 months. (iii) Not later than 14 days following each date in the schedule and the final date for compliance, the industrial user shall submit a progress report to the Authority including, at a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the industrial user to return the construction to the schedule established. In no event shall more than 9 months elapse between such progress reports to the Authority. (3) Standards Modification. The Authority reserves the right to amend this chapter and the terms and conditions hereof in order to assure compliance by the Authority with applicable laws and regulations. All National Categorical Pretreatment Standards adopted after the promulgation of this chapter shall be adopted by the Authority as part of this chapter. All existing sources subject to a National Categorical Pretreatment Standard shall submit a disclosure form, as required by subsection (a)(2) hereof within 180 days after the promulgation of the Standard by the U.S. EPA. Any changes or new conditions in the chapter shall include a reasonable time schedule for compliance. (b) Reporting Requirement for Discharger. (1) Compliance Date Report. Any industrial user subject to categorical pretreatment standards and other industrial users at the discretion of the City Manager shall, within ninety days following the date for final compliance by the discharger with applicable pretreatment standards set forth in this chapter or ninety days following commencement of the introduction of wastewater into the POTW by a new discharger, submit to the Authority a report indicating the nature and concentration of all prohibited or regulated substances contained in its discharge, and the average and maximum daily flow in gallons. The report shall state whether the applicable pretreatment standards or requirements are being met on a consistent basis and, if not, what additional operation and maintenance and/or pretreatment is necessary to bring the discharger into compliance with the applicable pretreatment standards or requirements and shall include a compliance schedule. This report shall include the certification statement and shall be signed by an authorized representative as required in subsection (b)(4) hereof. (2) Periodic Compliance Reports. At the discretion of the City Manager, any discharger subject to a pretreatment standard set forth in this chapter or any discharger required to submit periodic compliance reports by the Authority shall submit to the Authority a report indicating the nature and concentration of prohibited or regulated substances in the discharge. The reports are to be submitted to the Authority during the months of June and December unless required more frequently or different months are specified. In addition, this report shall include a record of all measured or estimated average and maximum daily flows during the reporting period . Flows shall be reported on the basis of actual measurement, provided however, where cost or feasibility considerations justify, the Authority may accept reports of average and maximum flows estimated by verifiable techniques. The Authority, for good cause shown considering such factors as local high or low flow rates, holidays, budget cycles or other extenuating factors may authorize the submission of such reports on months other than those specified above. Reports of dischargers shall contain all results of sampling and analysis of the discharge, including the flow and the nature and concentration or production data and mass where required by the Authority. Analyses shall be performed in accordance with 40 CFR, Part 136 and amendments thereto. If an industrial user's sampling data indicates a violation, the industrial user shall notify the Authority within twenty-four hours of becoming aware of the violation. The industrial user shall then repeat the sampling and analysis as soon as possible and submit the results to the Authority within thirty days unless the POTW samples the industrial user's discharge. The results of additional monitoring beyond the minimum required shall also be included on the next periodic compliance report submitted by the industrial user. This report shall include the certification statement and shall be signed by an authorized representative as required in subsection (b)(4) hereof. (3) All industrial users shall promptly notify the Authority in advance of substantial changes in volume or character of discharges, including the listed or characteristic hazardous wastes for which the industrial user has submitted initial notification under 40 CFR 403.12(P). In addition, all users shall immediately notify the Authority in advance of discharges that could cause problems to the POTW, including any slug loadings by the industrial user. (4) The reports and compliance schedules required by subsections (a) and (b) hereof shall include the certification statement as set forth in 40 CFR 403.12(I)and shall be signed by as follows: A. By a responsible corporate officer. For the purpose of this paragraph, a responsible corporate officer means: (i) President, vice-president, secretary or treasurer of the corporation in charge of a principal business function, or any other person who performs similar policy-making or decision-making functions for the corporation. (ii) The manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiate and direct other comprehensive measures to assure long-term environmental compliance with environmental laws and regulations; can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. B. A general partner or proprietor if the industrial user is a partnership or sole proprietorship, respectively. C. By a duly authorized representative of the responsible corporate officer. A duly authorized representative of the individual in subsections A. or B. of this subsection if: (i) The authorization is made in writing by the individual described in subesctions (4)A. or (4)B.; (ii) The authorization specifies either an individual or a position having responsibility for the overall operation of the facility from which the industrial discharge originates, such as the position of plant manager, operator of a well, or well field superintendent, or a position of equivalent responsibility, or having overall responsibility for environmental matters for the company; and (iii) The written authorization is submitted to the City. D. If an authorization under subsection C. of this section is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, or overall responsibility for environmental matters for the company, a new authorization satisfying the requirements of subsection C. of this section must be submitted to the City prior to or together with any reports to be signed by an authorized representative. (5) Sampling Requirements for Reports and Disclosure Forms. The reports required in subsections (a) and (b) of this section shall be conducted in accordance with all of the following: A. For the Disclosure Form (subsection (a)) and Compliance Date Report (subsection (b)(1)) of this section, a minimum of four grab samples shall be used for pH, hexavalent chromium, cyanide, total phenols, oil and grease, sulfide, and volatile organics for facilities for which historical sampling data do not exist; for facilities for which historical sampling data are available, the Authority may authorize a requirement of fewer grab samples. For all other pollutants, twenty-four-hour composite samples shall be obtained through flow-proportional composite sampling techniques, unless flow-proportional sampling is waived by the Authority. In such cases, samples may be obtained through time-proportional composite sampling techniques or through a minimum of four grab samples where the user demonstrates that this will provide a representative sample of the effluent being discharged. B. Samples should be taken immediately downstream from pretreatment facilities, if such exist, or immediately downstream from the regulated process if no pretreatment exists. If the wastewaters regulated by categorical standards mix with other wastestreams prior to pretreatment, the user should measure the flows and concentrations necessary to allow use of the combined wastestream formula under OAC 3745-3-09(I)(1) and 40 CFR 403.6(e) in order to evaluate compliance with the categorical pretreatment standards. C. Except as otherwise provided in this rule, sampling and analysis shall be performed in accordance with the techniques prescribed in 40 C.F.R. 136. Where 40 C.F.R. 136 does not contain sampling or analytical techniques for the pollutant in question, or where the director determines that the 40 C.F.R. 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analysis shall be performed by using analytical methods or other applicable sampling and analytical procedures approved by the director of Ohio EPA. (i) The reports shall be based upon data obtained through appropriate sampling and analysis performed during the period covered by the report, which data is representative of conditions occurring during the reporting period. (ii) The Authority shall require that frequency of monitoring necessary to assess and assure compliance by industrial users with applicable pretreatment standards and requirements. (iii) Grab samples shall be used for pH, hexavalent chromium, cyanide, total phenols, oil and grease, sulfide, and volatile organic compounds. (iv) For all other pollutants, twenty-four-hour composite samples shall be obtained through flow-proportional composite sampling techniques, unless time-proportional composite sampling or grab sampling is authorized by the Authority. (v) Where time-proportional composite sampling or grab sampling is authorized by the Authority, the samples shall be representative of the discharge and the decision to allow the alternative sampling shall be documented in the industrial user file for that facility or facilities. (vi) Using protocols (including appropriate preservation) specified in 40 C.F.R. 136 and appropriate U.S. EPA guidance, multiple grab samples collected during a twenty-four-hour period may be composited prior to the analysis as follows: a. For hexavalent chromium, cyanide, total phenols, and sulfides the samples may be composited in the laboratory or in the field. b. For volatile organics and oil and grease the samples may be composited in the laboratory. c. Composite samples for other parameters unaffected by the compositing procedures as documented in approved U.S. EPA methodologies may be authorized by the Authority, as appropriate. D. For the Periodic Compliance Reports required by subsection (b)(2) of this section, the Authority shall require the number of grab samples necessary to assess and assure compliance by industrial users with applicable pretreatment standards and requirements. E. If an industrial user subject to the reporting requirement in the Periodic Compliance Reports (subsection (b)(2)) of this section monitors any regulated pollutant at the permitted sampling location more frequently than required by the Authority, using the procedures described in subsection (b)5.C of this section, the results of this monitoring shall be included in the report. (c) Monitoring Facilities. At the discretion of the City Manager, any person discharging to the sewage system shall provide and operate at his own expense, a facility acceptable to the Authority to allow inspection, sampling and flow measurement of each sewer discharge to the Authority. Each monitoring facility shall be situated on the discharger's premises, except where such a location would be impractical or cause undue hardship on the discharger, in which case, the Authority may concur with the facility being constructed in the public street or sidewalk area providing that the facility is located so that it will not be obstructed by landscaping or parked vehicles. There shall be ample room in or near such sampling facility to allow accurate sampling and preparation of samples for analysis. The facility and all sampling and measuring equipment shall be maintained at all times in a safe and proper operating condition at the expense of the discharger. All monitoring facilities shall be constructed and maintained in accordance with all applicable construction standards and specifications. Construction shall be completed within 120 days of receipt of the permit by the discharger, unless the Authority provides a different timeline. (d) Inspection and Sampling. The Authority may inspect the monitoring facilities of any discharger to determine compliance with the requirements of this chapter. The discharger shall allow the Authority or its representatives to enter upon the premises of the discharger at all reasonable hours, for the purposes of inspection, sampling or records examination and/or duplication. The Authority shall have the right to place on the discharger's property such devices as are necessary to conduct sampling, inspection, compliance monitoring and/or metering operations. (e) Confidential Information. Information and data furnished to the Authority with respect to the nature and frequency of discharge shall be available to the public or other governmental agency without restriction unless the discharger specifically requests and is able to demonstrate to the satisfaction of the Authority that the release of such information would divulge information, processes or methods of production entitled to protection as trade secrets or proprietary information of the discharger. When requested by a discharger furnishing a report, the portions of a report which may disclose trade secrets or secret processes shall not be made available for inspection by the public but shall be made available upon written request to governmental agencies for uses related to this chapter, the NPDES permit, State disposal system permit and/or the pretreatment programs; provided, however, that such portions of a report shall be available for use by the State or any State agency in judicial review or enforcement proceedings involving the discharger furnishing the report. Wastewater constituents and characteristics shall not be recognized as confidential information. (f) Industrial wastewater discharge permits shall be issued to all significant industrial users prior to discharging to the City of Delaware's sewer system. Such permits are enforceable and shall contain, at a minimum, the following conditions: (1) Statement of duration (in no case more than five years); (2) Statement of non-transferability without, at a minimum, prior notification to the POTW and provision of a copy of the existing industrial discharge permit to the new owner or operator; (3) Effluent limits, including best management practices, based on applicable general pretreatment standards, categorical pretreatment standards, local limits, and State and local law; (4) Self-monitoring, sampling, reporting, notification and recordkeeping requirements, including an identification of the pollutants to be monitored, sampling location, sampling frequency, and sample type, based on the applicable general pretreatment standards in part 403 of this chapter, categorical pretreatment standards, local limits, and State and local law; (5) Statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedules may not extend the compliance date beyond applicable federal deadlines; (6) Requirements to control slug discharges (see Chapter 917.23).

(Ord. 25-63. Passed 11-24-25)

Ask a question about Delaware law

Corpus searches the Delaware sections it holds and shows the ones that match, with their citations. Free, no sign-in.