§ 1157.08 — PROCEDURE FOR CERTIFICATE OF APPROPRIATENESS
Codified Ordinances of the City of New Albany, Ohio (Codified through Ordinance No. O-21-2026, enacted July 7, 2026. (Supp. No. 11, Update 1)) · New Albany Codified Ordinances § 1157.08
Corpus is an independent public-information project, not the official City of New Albany website. Stable reference: corpuslaw.us/code/aae35e49-f60a-419c-a4af-826fe2ac1572
1157.08 - PROCEDURE FOR CERTIFICATE OF APPROPRIATENESS.
(a) The application for a certificate of appropriateness shall be made on such forms as prescribed by the staff of the City of New Albany, along with such plans, drawings, specifications and other materials as may be needed by staff or the Board to make a determination. (1) The materials that may be required include, but are not limited to: A. A dimensioned site plan showing existing conditions including all structures, pavement, curb-cut locations, natural features such as tree masses and riparian corridors, and rights-of-way. B. A dimensioned site plan showing the proposed site change including structures, pavement, revised curb-cut locations and landscaping. C. Illustration of all existing building elevations to scale. D. Illustrations of all proposed building elevations to scale. E. Samples of proposed building materials. F. Color samples for proposed roof, siding, etc. (2) For review of signage, the following submittal requirements apply: A. Illustrations of all existing site signage including wall and ground. B. Illustrations of proposed signage to scale. C. A dimensioned site plan showing location of existing ground mounted signs. D. A dimensioned site plan showing the proposed location of ground mounted signs. E. Samples of proposed sign materials. F. Color samples of proposed sign(s). G. Proposed lighting plan for sign(s). (b) (1) Any major environmental change, or zoning change, to any property located within the Village Center Area, requires a certificate of appropriateness from the Architectural Review Board. Applicants shall file an application for a Certificate of Appropriateness at least thirty (30) days prior to the Architectural Review Board meeting. (2) In the case of a Certificate of Appropriateness application for a property in a Planned Unit Development (PUD) Zoning District within the Village Center Area, the Architectural Review Board shall review the proposal and make a recommendation to the Planning Commission at the time of rezoning or the preliminary development plan. After the preliminary development plan, any alterations, modifications or other environmental changes to the zoning requirements of a Planned Unit Development within the Village Center require a Certificate of Appropriateness issued by the Planning Commission. (3) In the case of a Certificate of Appropriateness application for a property in a Hamlet Area, the Architectural Review Board shall review the proposal and make a recommendation to the Planning Commission at the time of final development plan. After the final development plan, any alterations, modifications or other environmental changes to the zoning requirements for a Hamlet Area will be subject to the review and approval of the Planning Commission. (c) Any major environmental change to a property located outside the Village Center Area, requires a certificate of appropriateness issued by the City Manager's designee. (d) Any minor environmental change requires a Certificate of Appropriateness issued by the City Manager's designee. (e) Any major or minor environmental change which requires a waiver to the requirements of this chapter requires a Certificate of Appropriateness to be issued by the Architectural Review Board. (f) Upon review of the application for a certificate of appropriateness, the ARB or staff member shall determine whether the proposed environmental change promotes, preserves and enhances the architectural and historical Architectural Review District, set forth in Section 1157.02. As a part of its review, the ARB or staff member will ensure that, at a minimum, the proposed environmental change complies with the criteria set forth in Section 1157.08 and the design Guidelines and Requirements incorporated into this section by reference. Upon completion of its review, the ARB or staff member will issue or deny a certificate of appropriateness to the applicant. (g) In determining the appropriateness of specific environmental change, the Board shall conduct a public meeting on the project and/or solicit input from staff members or other consultants to the Municipality.
(Ord. 12-99. Passed 10-5-99; Ord. 26-2007. Passed 8-21-07; Ord. O-08-2011. Passed 5-17-11; Ord. O-23-2022. Passed 7-19-22.)
Ask a question about New Albany law
Corpus searches the New Albany sections it holds and shows the ones that match, with their citations. Free, no sign-in.
