For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 933.01 — DEFINITIONS

Codified Ordinances of the City of New Albany, Ohio (Codified through Ordinance No. O-21-2026, enacted July 7, 2026. (Supp. No. 11, Update 1)) · New Albany Codified Ordinances § 933.01

Corpus is an independent public-information project, not the official City of New Albany website. Stable reference: corpuslaw.us/code/51078dff-2a03-4b2a-b8f4-16c58db47f69

933.01 - DEFINITIONS.

(a) "Agreement" shall be the sewer subtrunk agreement entered into by the Municipality and the private sector developer wishing to extend a sanitary sewer subtrunk. (b) "Carrying charge" shall be the percentage of the outstanding balance of the "total cost of construction" compounded annually as specified in the Agreement. (c) "Total Cost of Construction" shall consist of the following items: (1) Actual total bid contract price for construction of the extension of the subtrunk shall incorporate a "per unit cost basis" instead of a lump sum amount. The original contract bid price shall require a minimum of three (3) competitive bids from qualified City of Columbus contractors utilizing the "per unit cost basis". Bids shall be opened and read in the presence of the Municipal Engineer. In order to derive the "per unit cost basis" the bid shall be segregated into material costs, and labor costs (the latter of which shall include all other costs including equipment costs, overhead, and profit). This method will insure construction costs will be based upon actual quantities for construction overhead rather than estimated quantities. After completion of project, the developer and contractors must present certified documentation of actual construction cost based on per unit cost to the satisfaction of the Municipal Engineer. The necessary documentation shall include, but will not necessarily be limited to: 1. certified payroll; 2. notarized affidavit and/or certification of materials costs; and 3. notarized affidavit and/or certification of actual per unit cost. LABOR (plus Equip., Overhead-Profit) | MATERIALS TOTAL AT TIME OF BID (per unit) CERTIFIED COST AFTER CONST. The Developer's administrative costs are not eligible for inclusion in this reimbursement policy. In order to be eligible for reimbursement, any other developer costs, in excess of their contractor's certified costs, said developer costs must be approved by the Municipal Engineer and Council. Once the contractor's and/or developer's costs are certified and approved, that cost basis will be subject to this reimbursement policy, except as otherwise provided herein. Any extraordinary exclusions provided in the bid contract price (i.e. unforeseen circumstances which inflate the actual contract bid price) which necessitate a modification in the bid price must be submitted to the Municipal Engineer for approval. (2) Actual cost of all materials and supplies if contracted separately from the total contract price for construction. (3) Engineering Design, plan review and construction inspection fees. (4) Actual cost of environmental remedial work required by applicable Federal laws or the laws of the State of Ohio in control, cleanup and disposal of hazardous substances or waste and solid waste. (5) The fair market value or actual purchase price, whichever is less, of all easements necessary for the extension of the subtrunk. (6) The cost of complying with any bonding requirements. Provided, however, the actual Total Cost of Construction shall in no event be in excess of one hundred and ten (110%) percent of the estimate of the total cost of construction or the bid for the construction as approved by the Village Engineer, whichever is less. (d) "Cost recovery fee" shall mean the reimbursement fee collected by the Municipality on behalf of the developer who constructed a sewer subtrunk line. (e) "Engineering cost" shall mean the actual total cost of engineering and surveying necessary to complete the plans and specifications for the portion of the subtrunk being extended, including engineering costs incurred in establishing the tributary Area. (f) "Exempt parcel" shall mean any parcel, seven (7.000) acres or less in size, used for a single-family residential purpose unless or until said parcel is rezoned, subdivided, and/or developed. (g) "Household service line" shall mean any lateral six (6) inches in diameter sewer, serving one single family home. (h) "Reimbursement district" means the tributary area that is to be included when reimbursement costs are calculated. (i) "Sewer lateral" shall mean any sewer line smaller than eighteen (18) inches in diameter but larger than household service line. (j) "Parcel" shall mean a tract of real property assigned a separate and unique tax number by the County Auditor. (k) "Subtrunk" shall mean a sanitary sewer line eighteen (18) inches in diameter or larger and/or forced main sanitary sewer line equivalent in size to an eighteen (18) inch or larger gravity sanitary sewer line as determined by the Municipal Engineer. (l) "Tributary area" shall mean that area served by the extension of the subtrunk without further extension thereof, as determined by the Municipal Engineer at the time of the approval of the plans and specifications of the extension of the Subtrunk.

(Ord. 21-96. Passed 7-2-96.)

Ask a question about New Albany law

Corpus searches the New Albany sections it holds and shows the ones that match, with their citations. Free, no sign-in.