For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 1110.0413 — Compensatory Storage

Toledo Municipal Code (2026 S-105: complete to June 30, 2026) · Toledo Municipal Code § 1110.0413

Corpus is an independent public-information project, not the official City of Toledo website. Stable reference: corpuslaw.us/code/1756e17e-c35b-4e16-aef8-e22078a2074d

1110.0413 Compensatory Storage.

Fill within the area of Special Flood Hazard shall result in no net loss of natural Floodplain storage. Providing an equal volume of Flood storage by excavation or other compensatory measures shall offset the volume of the loss of Floodplain storage due to Filling in the Special Flood Hazard Area. For the purpose of satisfying this provision, compensating cut may be from any properties within the watershed, along the same watercourse or hydraulically connected, where the Base Flood Elevation is within one foot of the Base Flood Elevation of the fill area, and where the compensating cut and fill are at the same range of elevations. Fill of less than 10 cubic yards per residential lot, cumulative from the time of passage of this regulation, will not require compensating cut, providing that the fill does not adversely affect adjoining properties. (Ord. 62-24. Passed 2-21-24.)

Ask a question about Toledo law

Corpus searches the Toledo sections it holds and shows the ones that match, with their citations. Free, no sign-in.