For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 935.06 — Fees for approval of water line extension application

Toledo Municipal Code (2026 S-105: complete to June 30, 2026) · Toledo Municipal Code § 935.06

Corpus is an independent public-information project, not the official City of Toledo website. Stable reference: corpuslaw.us/code/82476d57-46e5-4d4a-afe5-2f1cd4386157

935.06. Fees for approval of water line extension application.

Each application for the extension of a water line outside the City limits shall be accompanied by a fee of one hundred dollars ($100.00), as a minimum charge to reimburse the Division of Water for costs incurred in making studies necessary to determine that plans, specifications and materials to be used in the construction of the water line extension, meet the requirements of the Division of Water, and for making the studies necessary to the effect of such extension upon the waterworks system in service, and the engineering feasibility of such extension and reporting on the same. The one hundred dollar ($100.00) fee shall be a minimum charge. Any additional costs incurred, equal to direct labor and material costs plus current additives and overhead, shall be paid before the extension is approved. (1952 Code § 27-2-6; Ord. 103-70)

Ask a question about Toledo law

Corpus searches the Toledo sections it holds and shows the ones that match, with their citations. Free, no sign-in.