§ 21.07.030 — Acceptance
Code of Ordinances of the City of Edmond, Oklahoma (Codified through Ordinance No. 4097, enacted August 10, 2026 (Supp. No. 40)) · Edmond Code of Ordinances tit. 21, § 21.07.030
Corpus is an independent public-information project, not the official City of Edmond website. Stable reference: corpuslaw.us/code/65a7f684-dbea-4441-8abb-291b35a959b7
21.07.030 - Acceptance.
A. The following improvements shall be complete and approved by the City Engineer prior to the Final Record Plat being placed on the City Council Meeting agenda for acceptance: 1. All water lines, sanitary sewer lines and storm sewer. 2. All roadway paving and public sidewalks. 3. Fire hydrants installed and tested. 4. The water lines shall have met all requirements for pressure testing and safe water samples. 5. GIS fees as defined in Appendix A. B. Certain items may be deferred for a maximum of thirty days with a cash bond in the amounts listed in the current approved Fee Schedule for each item that follows: 1. The as-built plans. 2. Sidewalks. 3. Other items determined on an individual basis. C. A cash bond may be required in accordance with the estimates required by Section 21.06.010(C) above guaranteeing that the addition will be developed in accordance with current subdivision regulations of the Planning Commission of the City, and that water mains, paying, sanitary sewers, storm sewers and other provisions for handling surface water will be constructed in accordance with the plans and specifications, approved by the City Engineer and that the developer will guarantee the payment of all materials and labor entering into the construction of said improvements. It is to be understood that the plans on which the estimate of cost are based are preliminary and may be modified by the City whenever required for the protection of the public. The developer may, if required by the City Council, file with the City Clerk a cash bond in the amount of 125 percent of the estimated construction costs, conditioned that the developer, as principal, will faithfully install and complete improvements and utilities in the subdivision within a period not to exceed two years, and act in accordance with any other requirements of this title and other ordinances, approved plans, specifications and subdivision rules and regulations of the City, and will pay all bills for contractors, subcontractors; labor and materials incurred in the completion of the improvements and utilities. An extension of this period may be allowed by the Council. Actions on the above bond shall be limited to six months from the date of completion of the improvements and utilities referred to above. The Registered Professional Engineer shall furnish the cost of the pavement and utilities to the City Engineer who shall approve the estimate of costs of water mains, paving, sanitary sewers, storm sewers, and other drainage facilities if required, in order that the City Council may determine whether or not the amount of the bond submitted is adequate to protect the interest of the City and public welfare. D. Under no circumstances will residential building permits be issued until the water system and the base course of paving is constructed, approved and accepted. E. After the improvements have been completed and accepted, hard copy and digital files as specified by the City Engineer with all data in the standard drawing layer format supplied by the City of all public improvements shall be corrected "as built", signed and sealed by the developer's Design Engineer and filed with the City Engineer.
(Ord. 2696, §§ 1, 2, June 24, 2002).
Ask a question about Edmond law
Corpus searches the Edmond sections it holds and shows the ones that match, with their citations. Free, no sign-in.
