§ 23.20.050 — Requirements Relating to Developments

Code of Ordinances of the City of Edmond, Oklahoma (Codified through Ordinance No. 4097, enacted August 10, 2026 (Supp. No. 40)) · Edmond Code of Ordinances tit. 23, § 23.20.050

Corpus is an independent public-information project, not the official City of Edmond website. Stable reference: corpuslaw.us/code/37b0f1ba-d225-414f-9f32-fe6eaa267814

23.20.050 - Requirements Relating to Developments.

(a) In any development or improvement of property, the Developer/Owner will be required to provide at his own expense a complete and detailed drainage study for the total area to be ultimately developed. The study shall be submitted to the City Engineer for review no later than 10 working days prior to the placing of any development on an agenda of the Planning Commission, City Council, Edmond Public Works Authority, or other authorizing body. (b) All developments shall be designed, constructed, and completed in a manner which minimizes the removal of vegetation and existing tree cover. (c) Any development with a total disturbed area of equal to or greater than one acre shall be required to submit to the City of Edmond Engineering Department copies of the Stormwater Pollution Prevention Plan, the Notice of Intent filed with the Oklahoma Department of Environmental Quality (ODEQ), and the issued OKR10 Permit from the ODEQ before any activity shall commence on the site. The City of Edmond will not permit any increase, as compared to historical conditions, in release of sediment from a construction site. See the City of Edmond Standard Drainage Policy STD-400 for more information. The City of Edmond recognizes all responsibilities of the developer to comply with the EPA's National Pollutant Discharge Elimination System (NPDES) requirements. In addition, the City hereby adopts by reference the ODEQ's "General Permit OKR10 For Storm Water Discharges From Construction Activities Within The State Of Oklahoma" and all sites covered by that permit shall comply with its requirements. (d) No excavation, surveying, geotechnical exploration, grading, leveling, landfilling, or any activities required to be covered by a Land Disturbance Permit (refer to Section 23.20.055), shall be commenced on any lot or tract of record for single-family residential developments, multi-family, or non-residential development prior to: 1. approval of the grading and erosion/sediment control plan, 2. issuance of Land Disturbance Permit, if applicable, and 3. installation of the prescribed erosion/ sediment control Best Management Practices (BMPs). If it is determined by the City Engineer or his designee in an on-site inspection that the erosion/sediment control no longer is functioning as intended due to lack of maintenance or insufficient design or the site is not in compliance with the requirements of any applicable OPDES or NPDES Permit, then the Developer/Owner may be served with a Stop Work Order and a Notice of Violation of this ordinance. No further work on this project shall proceed after the Stop Work Order is issued until such time as the Developer/Owner has complied with adequate erosion/sediment control and/or addressed the deficiency yielding the Stop Work Order and same meets approval of the City Engineer or his designee. A re-inspection will be required prior the lifting of the Stop Work Order. Re-inspection fees will be $500 per occurrence. In addition, a cash deposit in an amount determined by the City Engineer will be required as a condition of lifting the Stop Work Order. The amount shall be sufficient to cover the costs to insure proper installation and maintenance of the prescribed erosion/sediment controls. This amount shall be utilized to pay for any costs of future abatements. Upon application of the Developer/Owner for a partial release of the amount deposited as set out above, the City Engineer is authorized to grant the release of a portion of the funds using the percentage of the project that is complete and in consideration of the total project compliance with this Chapter. Upon issuance of the occupancy permit for the total property, any remaining amount of the deposit will be returned to the Developer/Owner. In situations where compliance is not forthcoming, the City will inform the ODEQ's administration to enable that agency to conduct further inspections and enforcement under its regulations. (e) Low Impact Development (LID) is an innovative, ecosystem-based approach to land development and stormwater management that works with nature to manage stormwater as close to its source as possible. The goal of LID design is to maintain the integrity of each watershed by maintaining the natural, pre-developed hydrology on each development site. LID employs principles that treat stormwater as a resource rather than a waste product. LID is a blend of measures that includes conservation, minimization of impacts, maintaining historic pre-developed runoff rates, integrated management practices, and pollution prevention techniques. Examples of commonly used LID practices include bioretention and infiltration basins such as inverted vegetated islands within parking lots, rain gardens, vegetated rooftops, rain barrels and cisterns, and permeable pavements. The City encourages the use of Low Impact Development and recommends that such practices be incorporated into proposed and existing site development. The science, engineering, methodologies, and technologies associated with LID are continually being developed and updated. For the current Best Management Practices (BMPs) suggested for consideration, refer to the U.S. Environmental Protection Agency website, the design criteria and engineering construction standards of other communities, and recent publications by the City of Edmond, trade organizations, and others. If an LID BMP is approved by the City for use on a development site and that BMP is used to decrease and/or offset the required stormwater detention for the site, then an Operations and Maintenance Manual must be provided and the owner responsible for the BMP's upkeep and maintenance shall be stated on the site plan and plat. The BMP shall be inspected, on an interval to be determined by the City Engineer not to exceed five years, by an engineer licensed in the State of Oklahoma at the owner's expense to certify that it is being operated and maintained correctly and that it continues to function as designed. The engineer's inspection report and certification shall be submitted to the City of Edmond.

(Ord. 2382, November 1997; Ord. 2853, § 1, May 24, 2004; Ord. 3053, § 4, November 13, 2006; Ord. 3217, § 1, July 27, 2009; Ord. 3233, § 1, October 12, 2009).

Ask a question about Edmond law

Corpus searches the Edmond sections it holds and shows the ones that match, with their citations. Free, no sign-in.