§ 43-157 — Connection to public sewer, tapping regulations and saddle specifications
Code of Ordinances of the City of Midwest City, Oklahoma (Codified through Ordinance No. 3615, enacted November 13, 2025. (Supp. No. 21)) · Midwest City Code of Ordinances § 43-157
Corpus is an independent public-information project, not the official City of Midwest City website. Stable reference: corpuslaw.us/code/b9a23003-273e-4d41-834a-d04a125a0d17
Sec. 43-157. - Connection to public sewer, tapping regulations and saddle specifications.
(a) Whenever no wye or tee presently exists on a main sewer line and a building and/or house is to be constructed, a special fitting called a saddle is to be utilized to make the connection. The spigot's end shall be specifically shaped to fit snugly against a hole cut into the mainline. These saddles shall be sealed with epoxy cement and/or secured to the line with stainless steel bands. (b) Whenever a saddle is required on a new or existing main, it is to be installed by the contractor only when continuous supervision is provided by the utilities department. The saddle selected to be used shall fit the contour of the inside of the mainline and shall be specifically designed to fit the particular type and size of the line. It shall be installed in accordance with the manufacturer's instructions. The saddle connection shall be capable of withstanding any conditions such as stress and/or strain encountered in normal construction or maintenance. The connection shall be water- and gas-tight. (c) When the opening for the saddle is cut into the sewer line, care must be taken to prevent the cracking or breaking of the mainline. If the main is cracked or broken, that length of pipe shall be removed and a new wye or tee fitting installed in its place. (d) The contractor may make the cut into the main for the installation of the saddle only if he possesses the proper equipment to make the tap; otherwise, the city work crew shall make the tap and install the saddle. (e) The opening shall be fully dressed to fit the saddle by gentle trimming with small dressing tools. All pipe chips, etc., must be removed from the bottom of the dry mainline. If the saddle is being installed on a line already in use, some means must be provided to prevent the chips, etc., from entering the sewer line. (f) Only tapping saddles approved by the line maintenance official shall be allowed. Insert tee and flexible tapping saddle shall not be allowed. (g) The saddle, wye, tee, or other lateral connections (including the seal between the lateral connection and the POTW main) shall remain private infrastructure and the responsibility of the property owner to maintain. (h) All lateral connections shall be located between the ten o'clock and two o'clock position on the POTW main. [image omitted; see the official code]
(Code 1972, § 37-112; Ord. No. 1874, § 3, 5-24-83; Ord. No. 3552, § 9, 3-26-24)
Ask a question about Midwest City law
Corpus searches the Midwest City sections it holds and shows the ones that match, with their citations. Free, no sign-in.
