For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 43-236 — Surcharge for industrial users

Code of Ordinances of the City of Midwest City, Oklahoma (Codified through Ordinance No. 3615, enacted November 13, 2025. (Supp. No. 21)) · Midwest City Code of Ordinances § 43-236

Corpus is an independent public-information project, not the official City of Midwest City website. Stable reference: corpuslaw.us/code/769c64cc-c7f6-4fde-a186-1d8047ef12b7

Sec. 43-236. - Surcharge for industrial users.

(a) If the city determines that an industrial waste is acceptable for admission to the sanitary sewer system, under the discretionary powers given in this article, the industrial user shall be charged and assessed a surcharge, in addition to any sewer user charges, if these wastes have concentrations greater than normal domestic wastewater. (b) The industrial user's surcharge shall be calculated by the following formulas: C;sub§\sub; | = | (B c (B) + S c (S) + P c (P))V u Where: C;sub§\sub; | = | Industrial user's monthly surcharge for wastewaters of excessive strength. B c | = | O&M (operation and maintenance) cost for treatment of a pound of biochemical oxygen demand (BOD). B | = | Concentration of BOD from an industrial user above seven hundred fifty (750) mg/l in pounds per million gallons. S c | = | O&M cost for treatment of a pound of suspended solids. S | = | Concentration of suspended solids from an industrial user above seven hundred fifty (750) mg/l in pounds per million gallons. P c | = | O&M cost for treatment of a pound of oil and grease. P | = | Concentration of oil and grease from an industrial user above two hundred (200) mg/l in pounds per million gallons. V u | = | Industrial user's wastewater contribution in millions of gallons per month. Unit costs shall be calculated as follows: B c | = | C 1 /B t S c | = | C 2 /S t P c | = | C 3 /P t Where: C 1 | = | Portion of annual O&M cost of wastewater treatment plant attributable to BOD. C 2 | = | Portion of annual O&M cost of wastewater treatment plant attributable to suspended solids. C 3 | = | Portion of annual O&M cost of wastewater treatment plant attributable to oil and grease. B t | = | Annual total BOD loading to the wastewater treatment plant in pounds. S t | = | Annual total suspended solids loading to the wastewater treatment plant in pounds. P t | = | Annual oil and grease loading to the wastewater treatment plant in pounds. (c) When total suspended solids, BOD, oil and grease and/or any other pollutant, including toxic pollutants, of water or waste accepted for admission to the city sanitary sewer system exceeds the values of these constituents for normal domestic wastewater, causing an increase in the cost of managing the effluent or sludge of the treatment works, the industrial user shall pay the industrial user surcharge in addition to any sewer user charges. (d) If an industrial user's wastewater flow is measured by a recording meter of a type approved by the city, and if such industrial user maintains such device in a proper condition to accurately measure such flow, then the industrial user's monthly wastewater contribution (V u ) in thousands of gallons, shall be that volume measured by the recording device. Otherwise, a percentage of water consumption shall be the basis for estimating wastewater flow, such percentage of water returned as wastewater being determined by the city. (e) An industrial user may, at his own cost, install an approved wastewater flow measuring device in a control manhole, as provided for, to accurately measure wastewater flow for purposes of determining his monthly contribution of wastewater volume to the sanitary sewer system. (f) When water is contained in a product, or is evaporated, or is discharged as unpolluted waste in an uncontaminated condition to surface drainage, an application may be made for a reduction in the percentage of water returned as wastewater to the sanitary sewer system; provided that supporting data satisfactory to the city are furnished. These data shall include a flow diagram, destination of water supply or wastes, supported by metered date, from meters installed on such process piping at the expense of the private owner. (g) The surcharge for BOD, suspended solids, oil and grease, and any other pollutant, shall be based upon the analyses as required in section 43-236 of this division. The applicable surcharge determined by such tests shall be assessed and shall continue for twelve (12) months unless subsequent tests determine that the surcharge should be changed. (h) The basis for determining the surcharge for the first year of operation of the user charge system, shall be the projected total annual O&M cost used for the sewer user charge and unit costs for the surcharge shall be calculated from that projected total cost. (i) The industrial user's surcharge shall be reviewed at least annually, at the same time that the user charge is being reviewed, and shall be adjusted to reflect any changes in wastewater treatment costs. Any excess funds collected shall be applied to payment of industrial user surcharges for the following year, and unit costs shall be adjusted accordingly. (j) Billing shall be by the month, shall be shown as a separate item on the regular bill for water and sewer charges, and shall be paid monthly.

(Ord. No. 2142, § 2, 6-10-86; Ord. No. 2627, § 4, 1-9-96)

Ask a question about Midwest City law

Corpus searches the Midwest City sections it holds and shows the ones that match, with their citations. Free, no sign-in.