5.10. - Retaining Walls

5.10.1. Compliance with Standard Engineering Practices and the Subdivision Ordinance. All retaining walls must comply with standard engineering practices and the subdivision ordinance, Chapter 43 of the Midwest City Code of Ordinances. 5.10.2. Retaining Wall Height. Any wall higher than two (2) feet shall either comply with Midwest City Standards or be designed by a professional engineer and have the engineer's seal. 5.10.3. Retaining Wall Measurement. The wall shall be measured from the top of the footing to the top of the wall. 5.10.4. Retaining Wall Permit. A permit must be applied for and approved before construction on any retaining wall is started. A retaining wall will not require a permit if shown and approved on a site plan. 5.10.5. Compliance with Standard Engineering Practices. Failure to comply with this section may result in legal action and/or removal of the wall.

(Ord. No. 3131, § 2, 10-26-10)