§ 50-82. - Limitations on work authorized, permit duration, etc.

(a) Permits issued pursuant to the provisions of this division shall in no case be taken to cover a cut at any other point nor of a dimension greater than six inches either way than that shown on the permit. If it is found necessary to make a greater cut, a new permit shall be obtained and taken out and an additional deposit made. (b) No permit shall be issued more than five days before the cut or excavation is to be made or work thereon commenced. All work under a permit shall be conducted expeditiously and all lane closures shall be reopened as soon as possible. (c) No person shall allow his name to be used to obtain a permit for any other person. (d) In no case shall two parties be allowed to use the same opening without the written permission of the Director.

(Code 1970, § 32-29; Code 1980, § 50-82; Ord. No. 23499, § 3, 11-27-07)