§ 201 — Mechanical equipment requiring licensed operators
Tulsa Revised Ordinances (Supp. No. 3, Update 2: codified through Ordinance No. 25794, passed May 13, 2026) · Tulsa Revised Ordinances tit. 59, § 201
Corpus is an independent public-information project, not the official City of Tulsa website. Stable reference: corpuslaw.us/code/ca21873d-8a29-40c7-8a81-4e3b3a4416b5
Section 201. - Mechanical equipment requiring licensed operators.
A. Responsibility of Owner and Operator. It shall be unlawful, a misdemeanor offense, and a violation of this code for any person, firm, limited liability company, corporation, or other legal entity owning or otherwise having control of the following mechanical equipment, to operate or to permit such equipment to be operated by any person who is not a properly licensed Stationary Engineer holding a current license and Certificate of Competency appropriate to the type, size, and pressure of such equipment. It shall further be unlawful and a misdemeanor offense for any person to operate the following equipment unless such person is duly licensed to operate such equipment: 1. All steam boilers of ten (10) horsepower or more, subject to an operating pressure of more than fifteen (15) pounds per square inch; 2. All steam boilers subject to an operating pressure of fifteen (15) pounds per square inch or less and all hot water boilers with an operating temperature exceeding 210° F., or having a capacity of over 3,000,000 BTU input, or aggregate total if manifolded together and located in a single confined space; 3. Any refrigeration and air conditioning units having a capacity of 150 tons, or 150 horsepower, or more. The provisions of this paragraph do not apply to units located outside of an occupied structure; or 4. All refrigeration and air conditioning plants of twenty (20) horsepower, or twenty (20) tons, whichever is greater, using Group 2 and 3 refrigerants as listed in Section 1104.1 of this code. The horsepower and tonnage of all such refrigeration and air conditioning plants shall be determined by aggregating all units greater than ten (10) horsepower or tons. B. Periods of Duty Established for Stationary Engineers and Process Steam Boiler Operator Operating Mechanical Equipment Requiring Licensed Operators. A licensed operator shall personally remain on the premises, except as noted, where any of the mechanical equipment listed in Subsection 201.A of this chapter is in operation in accordance with the periods of duty specified in this section. Periods of operator duty shall be determined by the use and occupancy classification of the building or structure as defined in the ICC International Building Code 2018 Edition, as amended, within which such equipment is located, as follows: 1. | Use Group A, Assembly Buildings | At all times during public occupancy while regulated equipment is in operation, or shall be monitored with computerized safety equipment with an immediate shutdown function and notification system.* 2. | Use Group B, Business Buildings | At all times during public occupancy while regulated equipment is in operation, or shall be monitored with computerized safety equipment with an immediate shutdown function and notification system.* 3. | Use Group E, Educational Buildings | At all times during public occupancy while regulated equipment is in operation, or shall be monitored with computerized safety equipment with an immediate shutdown function and notification system.* 4. | Use Group F, Industrial Buildings | During each shift of work of the occupying industry, or shall be monitored with computerized safety equipment with an immediate shutdown function and notification system.* EXCEPTION: In facilities when the mechanical equipment is being operated by a Process Steam Boiler Operator, the operator shall be on the premises in accordance with Subsection 201.E. 5. | Use Group H, High Hazard | At all times while regulated equipment is in operation; 6. | Use Group I, Institutional Buildings | At all times while regulated equipment is in operation, or shall be monitored with computerized safety equipment with an immediate shutdown function and notification system.* 7. | Use Group M, Mercantile Buildings | During public occupancy while regulated equipment is in operation, or shall be monitored with computerized safety equipment with an immediate shutdown function and notification system.* 8. | Use Group R, Residential Buildings: a. R-1 Structures less than 4 stories | At start-up and shut-down; b. R-1 Structures of 4 stories or more | At all times while regulated equipment is in operation, or shall be monitored with computerized safety equipment with an immediate shutdown function and notification system.* c. R-2 Structures | At start-up and shut-down; d. R-3 Structures | None; 9. | Use Group S, Storage | At start-up and shut-down; 10. | Use Group U, Utility and Miscellaneous | The Code Official shall determine which of the above rules shall apply. Such determination shall be based upon the Use Group that the building or structure most nearly resembles. *A third-party certificate of compliance in a form acceptable to the Code Official, or their designee, signed and sealed by a Mechanical Engineer licensed in the State of Oklahoma shall be required and submitted annually. "Public occupancy" shall mean open to public use by license or invitation. The term shall not mean occupancy by custodial, building maintenance, or security personnel, or occasional occupancy by employees, tenants, and their invitees after normal working hours." C. Daily operator log required. A daily log shall be kept by all operators, showing the date and time each operator arrives on the job, with signature or initials. The log shall be kept in full view with certificate and license. D. Use of apprentice operators. Operators may use assistants who have registered as apprentice operators. An apprentice operator shall not change any settings, make any adjustment, start, stop, work on, or repair equipment except in the presence of and under the direct supervision of a licensed operator. The licensed operator shall be directly responsible for the safe and lawful operation of any equipment where the operator's certificate and license are posted. E. Operating procedures for process steam boilers monitored by on-premises operators. Start-up and shut-down procedures shall be posted in the boiler room. The certificate holder shall record in a log the operating conditions of the boiler at a minimum frequency at each day's start-up, at the mid-point of the daily operation and at the shut-down of the process steam boiler. The maximum time period between any two log entries by the certificate holder for a boiler in operation shall be six hours. Each log entry shall include as a minimum the date and time of the entry, the certificate holder's signature, and a checklist of the status of the safety features of the boiler to include as a minimum the boiler operating pressure and the water level in the sight glass. The low water cut-off shall be cycled a minimum of once each operator's shift, and the pressure relief valve shall be lift tested monthly. F. Operating procedures for process steam boilers monitored with computerized safety equipment. In use groups where Section 201(B) allows for computerized safety equipment monitoring, a third-party mechanical engineer shall annually confirm that the certificate holder has distributed operating start-up, shut-down, and remote operating procedures to all remote monitors. The certificate holder must have a system to digitally log the operating conditions of the boiler at minimum of every six (6) hours. Certificate holders must ensure that the low water cut-off is cycled manually or remotely a minimum of once each operator's shift. The pressure relief valve shall be lift tested monthly by an on-premises operator.
(Ord. No. 24894, § 1, 8-24-2022; Ord. No. 25374, §§ 4—6, 7-31-2024)
Ask a question about Tulsa law
Corpus searches the Tulsa sections it holds and shows the ones that match, with their citations. Free, no sign-in.
