For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 2.18.030 — Cost recovery imposed; review

Municipal Code of the City of Corvallis, Oregon (Codified through Ordinance No. 2026-31, enacted October 19, 2026. (Supp. No. 70, Update 2)) · Corvallis Municipal Code § 2.18.030

Corpus is an independent public-information project, not the official City of Corvallis website. Stable reference: corpuslaw.us/code/95daa419-2191-45e9-88aa-a5df9ccd6a48

Section 2.18.030 - Cost recovery imposed; review.

1) A cost recovery charge is established, and rates shall be calculated by the City Engineer using the methodology set by Chapter 2.18.040. 2) A cost recovery charge is imposed upon all development within the City, on development of all lands owned by the City but outside the boundary of the City, and all development outside the boundary of the City which utilizes utility or transportation infrastructure when they apply for connection to a utility or street and did not previously pay their share of the construction of said infrastructure.

(Ord. 2000-27 § 1, 11/06/2000)

Ask a question about Corvallis law

Corpus searches the Corvallis sections it holds and shows the ones that match, with their citations. Free, no sign-in.