For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 2.9.30 — Procedures

Municipal Code of the City of Corvallis, Oregon (Codified through Ordinance No. 2026-31, enacted October 19, 2026. (Supp. No. 70, Update 2)) · Corvallis Land Development Code § 2.9.30

Corpus is an independent public-information project, not the official City of Corvallis website. Stable reference: corpuslaw.us/code/6e517610-8d20-49db-a1bc-d9624542f251

Section 2.9.30 - Procedures.

2.9.30.01 Application Initiation. A property Owner, or a property Owner's designee, may initiate a Historic Preservation Permit application. Property Owner(s) consent to the application is required. 2.9.30.02 Application Requirements. a. Applicants for a Historic Preservation Permit for a Designated Historic Resource must use forms provided by the Director and must include, for both types of Historic Preservation Permits, Director-level and Historic Resources Commission(HRC)-level, the items listed below. The Director may waive any of the following requirements when the Director determines the information required by a part of this Section is unnecessary to properly evaluate the proposed Historic Preservation Permit: 1. Applicant's name, address, and signature; 2. Owner's name, address, and signature, if different from applicants. If the Designated Historic Resource is owned by more than one property Owner, the consent of all Owners is required; 3. Location of the Designated Historic Resource, including address and tax assessor map and tax lot number; 4. Map(s) illustrating the location of the Designated Historic Resource; 5. Historic name of the resource, whether listed in the Local or National Register of Historic Places (or both), and (if pertinent) National Register of Historic Places Historic District Classification; 6. A narrative description of the request in sufficient detail to allow for the review of the proposal; 7. A narrative explanation of what the applicant proposes to accomplish; 8. A narrative description regarding how the request complies with applicable review criteria, including applicable zone standards; 9. A site plan, drawn to scale, showing the location of structures, driveways, and landscaped areas on the site, setback dimensions, and the general location of structures on adjacent lots; 10. Elevation drawings, drawn to scale, in sufficient detail to show the general scale, mass, building materials, and architectural elements of the proposal; 11. Information regarding whether or not there are any Historically Significant Trees on the site; 12. A copy of any relevant Historic Resource inventory information; 13. As applicable, any recommendations from SHPO or other state or federal agencies relative to any reviews required under state or federal law, including: a) Section 106 of the National Register Historic Preservation Act; b) Consultation review as required by ORS 358.653, as amended; c) Special Assessment Program requirements per ORS 358.475, as amended; d) National Transportation Act; e) National Environmental Protection Act; f) As provided under applicable Oregon or Federal law, the applicant will provide to the City a copy of any notice to SHPO of the existence of an Archaeological Site or Object located within the area proposed for a Historic Preservation Permit; g) Any other applicable state or federal law. The applicant is required to provide these recommendations only if the proposed changes that are the subject of the listed state or federal reviews also require Historic Preservation Permit approval under the provisions of this chapter; 14. Photographs or drawings of the resource from the applicable Period of Significance to provide context; and 15. Any additional information reasonably necessary to evaluate compliance with the provisions of this Code as determined by the Director. b. The applicant must provide a narrative description for Historic Preservation Permits involving an HRC-level Alteration or New Construction Permit per Section 2.9.70 to install a Moved Designated Historic Resource on a site within the City limits. The narrative must include the following information, in addition to 2.9.30.02.a: 1. A rationale for the new location for the Designated Historic Resource that also addresses the zone standards that apply to the new site; 2. A site plan, drawn to scale, for the proposed new location for the Designated Historic Resource showing: the location of existing and proposed structures, driveways, and landscaped areas; setback dimensions; the general location of structures, walkways, sidewalks, and driveways on adjacent lots; the historic designation of adjacent properties; existing and proposed legal access and infrastructure for the proposed new site; and existing and proposed infrastructure improvements adjacent to the proposed new site; and 3. A description of the Historic Integrity and Historic Significance of the specific structure, building, plant, or other historic element for which the change is requested. c. The applicant must provide a narrative description for Historic Preservation Permits involving an HRC-level Demolition. The narrative must include the following information in addition to 2.9.30.02.a: 1. A description of the Designated Historic Resource's current physical condition, and its condition at the time it was inventoried; 2. If within a National Register of Historic Places Historic District, a narrative description of the Designated Historic Resource's contribution to the District and the subsequent Historic Integrity of the District if the resource were to be demolished; 3. A statement as to whether the applicant considered Moving the resource as an alternative to Demolition. If Moving was not found to be feasible, a description as to why not; 4. A narrative explanation of why the proposed Demolition is needed and what alternatives were explored; and 5. A statement regarding whether denial of the request will result in substantial economic or other hardship to the Owner of the Designated Historic Resource. d. The applicant must provide a narrative description for an HRC-level Historic Preservation Permit involving a Moving. The narrative must include information required in 2.9.30.02.a, 2.9.30.02.c.1 and 2.9.30.02.c.4, stated with respect to a Moving. Additionally, the narrative description for the proposed Moving must, if the resource is listed in a National Register of Historic Places Historic District, address the Designated Historic Resource's contribution to the District and the subsequent Historic Integrity of the District if the resource were to be moved. This provision pertains to the site from which the Designated Historic Resource is being moved and, if the site to which the Designated Historic Resource is moving is inside the City limits, then it also pertains to the new site. 2.9.30.03 Determination of Appropriate Historic Preservation Permit Review Procedure(s). A Historic Preservation Permit is required for certain Alteration or New Construction, Demolition, or Moving activities affecting a Designated Historic Resource, even if no Building Permit is required by the Building Official. Accordingly, the City's Historic Preservation Provisions apply to: Historic Resources listed in the Corvallis Register of Historic Landmarks and Districts (Local Register); Historic Resources listed in the National Register of Historic Places; and public rights-of-way and private street rights-of-way located within and adjacent to a National Register of Historic Places Historic District. Different review procedures and criteria apply, depending on the nature of the permit request, and if the Designated Historic Resource is located in a National Register of Historic Places Historic District, the classification of the resource. a. Exempt Activities - Section 2.9.40 outlines activities affecting a Designated Historic Resource that are exempt from the requirement for a Historic Preservation Permit. b. Definition of Alteration or New Construction Involving a Designated Historic Resource - An activity is considered an Alteration or New Construction involving a Designated Historic Resource when: the activity is not an exempt activity, a Demolition, or a Moving, as defined in Sections 2.9.40, 2.9.70.02, and 2.9.70.03, respectively; and the activity meets at least one of the three following descriptions: 1. The activity alters the exterior appearance of a Designated Historic Resource. Exterior appearance includes a resource's facade, texture, design or style, material, or fixtures; 2. The activity involves a new addition to an existing Designated Historic Resource or new freestanding construction on a Designated Historic Resource property; or 3. The activity involves installation of a Designated Historic Resource at a new site location, following a Moving, if the new site is within the City limits. If the new site of the Designated Historic Resource is outside the City limits, no City evaluation of the resource's installation at that new site will occur because the City has no jurisdiction in these locations. If an activity meets the definition for an Alteration or New Construction involving a Designated Historic Resource, as outlined in Section 2.9.30.03.b, then one of the two types of Historic Preservation Permits (Director-level or HRC-level) outlined in Section 2.9.30.03.c is required. c. Types of Historic Preservation Permits - 1. Director-level Historic Preservation Permit - The Director-level Historic Preservation Permit addresses Alteration or New Construction activities that are minor in nature and not covered as a permit exemption listed in Section 2.9.40. Specific procedures and clear and objective review criteria for this type of permit are listed in Sections 2.9.30, 2.9.50 and 2.9.60. The Director-level Historic Preservation Permit is classified as General Development in Chapter 1.2 - Legal Framework and is a staff-level review. Applications for a Director-level Historic Preservation Permit must be consistent with the review criteria in Section 2.9.50 and 2.9.60. The review of a Director-level Historic Preservation Permit may be accomplished concurrently with the review of any accompanying permit application(s), or individually if no accompanying permit application(s) exists. 2. Historic Resources Commission-level Historic Preservation Permit - The HRC-level Historic Preservation Permit addresses Alteration or New Construction, Demolition, and Moving activities not covered by Section 2.9.30.03.c.1, and not covered as a permit exemption listed in Section 2.9.40. Specific procedures for this type of permit are listed in Sections 2.9.30. The HRC-level Historic Preservation Permit is classified as a quasi-judicial land use decision in Chapter 1.2 - Legal Framework, involves public notice, and requires an HRC public hearing review for compliance with Sections 2.9.30 and 2.9.50. The following additional review criteria apply based on the scope of the application: a) Alteration or New Construction - Alteration or New Construction requiring an HRC-level Historic Preservation Permit must be consistent with the review criteria in Section 2.9.70.01. b) Demolition - Demolition requiring an HRC-level Historic Preservation Permit must be consistent with the review criteria in Section 2.9.70.02; or c) Moving - Moving requiring an HRC-level Historic Preservation Permit must be consistent with the review criteria in Section 2.9.70.03. d. Sources of Information that Assist the Director in Determining Historic Significance and Appropriate Historic Preservation Permit Review Process - The Director may use any of the following information sources to determine the appropriate Historic Preservation Permit review process that applies: 1. This Code Chapter and others referenced by it; 2. The official historic inventory for the Designated Historic Resource; 3. Findings from a final approved Order or Notice of Disposition summarizing the rationale for the placement of a Historic Preservation Overlay on the resource; 4. An approved National Register of Historic Places nomination; 5. Applicable state law; 6. Other adopted City ordinances; 7. Primary Source Material provided by the applicant; and 8. Secondary Source Materials on history, architecture, design or style, materials, methods, or pertinent examples locally or elsewhere. e. Procedures for Establishing a Historic Preservation Overlay Zoning Designation - A Historic Preservation Overlay zoning designation may be established for a Designated Historic Resource in accordance with the provisions in Chapter 2.2 - Zone Changes. f. Procedures for Removing a Historic Preservation Overlay Zoning Designation - A Historic Preservation Overlay zoning designation may be removed from a Designated Historic Resource in accordance with the provisions in Chapter 2.2 - Zone Changes. g. Procedures for Reclassifying Historic Resources in a National Register of Historic Places Historic District - Reclassification of a Designated Historic Resource listed in the National Register of Historic Places must be accomplished in accordance with the state and federal provisions identified in Section 2.2.60 of Chapter 2.2 - Zone Changes. h. Emergency Actions - Emergency actions include the Alteration or New Construction, Demolition, or Moving of a Designated Historic Resource when the City Engineer, Building Official, or Fire Marshal determines that emergency action is required to address public safety due to an unsafe or dangerous condition or to resolve an immediate threat to the Designated Historic Resource itself. After the immediate hazard has been addressed, if the emergency action was not an exempted activity as defined in Section 2.9.40, the property Owner must apply for the appropriate Historic Preservation Permit and address any additional requirements specified by the Historic Preservation Permit. In the application, the property Owner must submit information documenting the need for the emergency action. This documentation must include photographs and a written evaluation by an engineer, architect, or a historic preservation consultant. Once a building is determined to be unsafe or dangerous in accordance with these provisions, property Owners are encouraged to consider, while addressing the hazard, the re-use of the structure or its materials, to the extent feasible under the hazardous circumstances. To decide upon the Historic Preservation Permit, the decision-maker must consider information from the City Engineer, Building Official, or Fire Marshal, depending on the authority(ies) that deemed the emergency removal necessary. Once made aware of the emergency action, the City must notify the HRC that the action has occurred. 2.9.30.04 Public Notice. a. Director-level Historic Preservation Permits - No public notice is required. b. HRC-level Historic Preservation Permits - 1. The Director will provide notice consistent with the procedures in Sections 2.0.50.04.b; 2.0.50.04.c; and 2.0.50.04.d-f; and 2. For a proposed Demolition or Moving, the applicant will publish public notice in a newspaper of general circulation at least 10 days in advance of the HRC's public hearing. 2.9.30.05 Staff Evaluation. Per ORS 227, the Director will review the application for compliance with the application requirements in Section 2.9.30.02. If the application is incomplete, the Director will notify the applicant within 30 days of receipt of the application and state what information is needed to make the application complete. a. Director-level Historic Preservation Permits - City staff will review the application to ensure consistency with the review criteria in Section 2.9.50 and 2.9.60. b. HRC-level Historic Preservation Permits - For all HRC-level Historic Preservation Permits, the Director will prepare a report that evaluates whether the permit request complies with the review criteria in Section 2.9.50 and 2.9.70. The report will also include, if needed, a list of approval conditions for the HRC to consider. 2.9.30.06 Action on Application. a. Director-level Historic Preservation Permits - Based on applicable review criteria, the Director will approve, conditionally approve, or deny the Historic Preservation Permit application. Conditional approval is limited to conditions that address specific defects in the application and are required for the application to comply with the criteria. The Director will issue a decision in writing no later than 45 days from the date the application is deemed complete. b. HRC-level Historic Preservation Permits - The HRC will conduct a public hearing in accordance with Chapter 2.0 - Public Involvement. Following the close of the hearing, the HRC will approve, conditionally approve, or deny the Historic Preservation Permit application. Conditional approval is limited to conditions that address specific defects in the application and are required for the application to comply with the criteria. The Commission's decision must include findings that specify how the application has or has not complied with the applicable review criteria. In accordance with Chapter 2.0, the hearing authority must act upon the application within 120 days after the application is deemed complete. 2.9.30.07 Notice of Disposition. a. Director-level Historic Preservation Permits - The Director will provide a Notice of Disposition that includes a written statement of the decision, a reference to the findings leading to it, any conditions of approval, and the appeal period deadline to the following entities: 1. The applicant and the property Owner(s) (if different from the applicant); 2. The HRC; 3. Any person who resides on or owns property within 100 feet (excluding street right-of-way) of the parcel of land that is the subject of the Historic Preservation Permit application; 4. Any person who requested notice on the proposal; and 5. Any persons who submitted written comment on the proposal. b. HRC-level Historic Preservation Permits - The Director will provide the applicant and the HRC with a Notice of Disposition in accordance with Chapter 2.0 that includes a written statement of the HRC's decision, a reference to the findings leading to it, any conditions of approval, and the appeal period deadline. The Notice of Disposition must be provided to the property Owner(s) (if different from the applicant), any persons who presented oral or written testimony at the public hearing, and any person who requested notice on the proposal. 2.9.30.08 Appeals. a. The Historic Preservation Permit decision may be appealed in accordance with Chapter 2.19. b. Undue Hardship Appeals - The hearing authority for an appeal may consider claims of economic or undue hardship in cases where an applicant was either denied a Historic Preservation Permit or granted a Historic Preservation Permit with conditions of approval that the applicant believes to be an economic or undue hardship. The applicant must provide adequate documentation or testimony or both documentation and testimony at the appeal hearing to justify these claims. In addition to the information the applicant believes is necessary to make his/her case to the appeal hearing authority, the information listed in 2.9.30.08.b.1-6, as applicable, must be submitted for the appeal hearing authority to consider a hardship appeal. Not every item listed in 2.9.30.08.b.1-6 will apply to every case. 1. Three estimates from contractors licensed in the State of Oregon of: a) The cost of the activity(ies) proposed under the denied or conditionally-approved Historic Preservation Permit; and b) Any additional costs which would be incurred to comply with the modified activity(ies) recommended by the decision-maker. 2. An estimate of the appraised value of the property, performed by an appraiser who is licensed or certified in the State of Oregon and for whom the appraisal will fall into their scope of practice of their license or certification that shows the following values: a) The property in its current state; b) The property with the improvements that were denied or conditionally-approved for the Historic Preservation Permit; and c) The property with the modified activity(ies) proposed by the applicant. 3. Information regarding the soundness of the affected structure(s), and the feasibility for rehabilitation which would preserve the historic character and qualities of the Designated Historic Resource. All this information must be developed by a contractor licensed in the State of Oregon. 4. Any information concerning the mortgage or other financial obligations on the property that are affected by the denial or approval, as conditioned, of the proposed Historic Preservation Permit. 5. Any past listing of the property for sale or lease, the price asked, and any offers received on that property. 6. Information relating to any nonfinancial hardship resulting from the denial or approval, as conditioned, of the proposed Historic Preservation Permit. If the hearing authority determines that the denial or approval, as conditioned, of the Historic Preservation Permit would pose an undue hardship on the applicant, then a Historic Preservation Permit noting the hardship relief must be issued, and the property Owner may conduct the activity(ies) outlined in the Historic Preservation Permit as modified by the appeal hearing authority. 2.9.30.09 Effective Date. The Historic Preservation Permit decision is effective 12 days after the Notice of Disposition is signed, unless an appeal is earlier filed. 2.9.30.10 Effective Period of Approval. a. Director-level Historic Preservation Permits - Director-level Historic Preservation Permits are valid for a two-year period from the effective date of the permit. If the applicant has not begun the development or its phases within the two-year period, the approval will expire. b. HRC-level Historic Preservation Permits - HRC-level Historic Preservation Permits are valid for a four-year period from the effective date of the permit. If the applicant has not begun the development or its phases within the four-year period, the approval will expire. 2.9.30.11 Re-application Following Denial, Modification(s) to an Approved Historic Preservation Permit, and Partial Approval of a Historic Preservation Permit a. Re-application Following Denial - Re-application for a Historic Preservation Permit following denial of that Permit is allowed in accordance with Section 2.0.50.15. b. Modification(s) to An Approved and Unexpired Historic Preservation Permit - A proposal to modify an approved Historic Preservation Permit will be processed as a new Historic Preservation Permit application, in accordance with the provisions of this Chapter. The new Historic Preservation Permit application must be considered in the context of the existing Historic Preservation Permit, the subject Designated Historic Resource, and any completed improvements done in accordance with the original Historic Preservation Permit. Approval of the new Historic Preservation Permit replaces the existing Permit in whole or in part, whichever is applicable. c. Partial Approval of a Historic Preservation Permit - An application for a Historic Preservation Permit may be approved in part, with a condition(s) clearly outlining the part(s) that is denied and the associated rationale (incompleteness or lack of compliance with applicable criteria). Re-application for a subsequent Historic Preservation Permit addressing the denied part of the original Permit is allowed, consistent with the criteria in Section 2.0.50.15. The new Historic Preservation Permit application must be considered in the context of the existing Historic Preservation Permit, the Designated Historic Resource, and any completed improvements done in accordance with the original Historic Preservation Permit. 2.9.30.12 Enforcement. The Director will administer and enforce these regulations and, to ensure compliance with these regulations, is authorized to take any action authorized by Chapter 1.3, as well as the remedies set out in criteria 2.9.30.12.a-b. a. Violations of these regulations must be remedied in accordance with Chapter 1.3. Additionally, if an after-the-fact Historic Preservation Permit is required to address a violation of these regulations, the decision-maker for that Historic Preservation Permit will have full authority to implement these regulations, regardless of what improvements have been made in violation of these regulations. This includes requiring the Designated Historic Resource to be restored to its appearance or setting prior to the violation, unless this requirement is amended by the decision-maker. This civil remedy will be in addition to, and not in lieu of, any other criminal or civil remedy set out in this Chapter or Chapter 1.3. b. Where the Alteration or New Construction, Demolition, or Moving of a Designated Historic Resource within a National Register of Historic Places Historic District or on any individually-listed property is in violation of these regulations, that Designated Historic Resource is protected by these regulations. Any person who intentionally causes or negligently allows the Alteration or New Construction, Demolition, or Moving of any Designated Historic Resource will be required to restore or reconstruct the Designated Historic Resource in accordance with the pertinent architectural characteristics, guidelines and standards adopted by this Chapter. These remedies are in addition to any other civil or criminal penalty set out in this Chapter or Chapter 1.3.

(Ord. No. 2023-24, § 12(Exh. A), eff. 9-12-2023)

Ask a question about Corvallis law

Corpus searches the Corvallis sections it holds and shows the ones that match, with their citations. Free, no sign-in.