§ 4.03.030 — Industrial sewer regulations
Municipal Code of the City of Corvallis, Oregon (Codified through Ordinance No. 2026-31, enacted October 19, 2026. (Supp. No. 70, Update 2)) · Corvallis Municipal Code § 4.03.030
Corpus is an independent public-information project, not the official City of Corvallis website. Stable reference: corpuslaw.us/code/2e00f1f2-ba52-4c2a-9894-d4d7d31575f9
Section 4.03.030 - Industrial sewer regulations.
Section 4.03.030.010 General provisions. 1) This part of the Chapter provides for regulation of industrial users of the wastewater system. Certain industrial users will be issued discharge permits authorizing monitoring and enforcement activities, user reporting, and establishing required limitations on pollutant discharge to the City wastewater system, pursuant to this chapter. 2) The City shall prepare a document entitled, "City of Corvallis Pretreatment Program Implementation Manual." This document shall implement the City's pretreatment program, in accordance with the Act and Federal Regulations promulgated thereunder. Section 4.03.030.020 Fees. The City may adopt fees for reimbursement of the costs related to the pretreatment program, monitoring, inspections, processing permit applications, and other fees as the City judges necessary to implement requirements contained herein. Section 4.03.030.030 National categorical pretreatment standards. Compliance by existing sources with categorical pretreatment standards shall be within 3 years of the date the standard is effective unless a shorter compliance time is specified in the appropriate subpart of 40 CFR Chapter I, subchapter N. Existing sources which become Industrial Users subsequent to promulgation of an applicable categorical pretreatment standard shall be considered existing Industrial Users except where such sources meet the definition of a new source. New sources shall install and have in operating condition, and shall "start-up" all pollution control equipment required to meet applicable pretreatment standards before beginning to discharge. Within the shortest feasible time (not to exceed 90 days), new sources must meet all applicable pretreatment standards. When the City's discharge standards or limitations are more stringent than categorical pretreatment standards, categorical Users shall comply with the more stringent City standards or limitations at the commencement of discharge. The City shall notify all affected Users of the applicable reporting requirements under 40 CFR, Section 403.12. Section 4.03.030.031 Compliance schedule for meeting categorical pretreatment standards. Not later than 14 days following each date in the compliance schedule and the final date for compliance, the Industrial User shall submit a progress report to the City including, at a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the Industrial User to return the construction to the schedule established. In no event shall more than 9 months elapse between such progress reports to the City. Section 4.03.030.040 Permits. All significant industrial users proposing to connect to or discharge into the City's wastewater system, shall obtain an industrial wastewater discharge permit prior to connecting to or discharging into the City's wastewater system. All existing significant users connected to or discharging into the City's wastewater system shall obtain an industrial wastewater discharge permit. Section 4.03.030.041 Permit application. Industrial Users required to obtain an industrial wastewater discharge permit shall complete and file with the City an application and pay the application fee. Application shall be made on forms provided by the City. Existing sources shall apply for an industrial wastewater discharge permit. Proposed new sources shall apply at least 90 days prior to proposed connecting to or contributing to the POTW. The City will evaluate the data furnished by the user and may require additional information. After review and approval of the data furnished, the City shall issue an industrial wastewater discharge permit in accordance with the provisions herein. Section 4.03.030.042 Permit conditions. Industrial wastewater discharge permits shall be expressly subject to all provisions herein and all other applicable regulations, user charges and fees established by the City. A. Permits shall contain the following: 1) Statement of duration (in no case more than five years) in accordance with Section 4.03.030.060. 2) Statement that the permit is nontransferable without prior notification to the City in accordance with Section 4.03.030.061, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit. 3) Effluent limits, including Best Management Practices, based on applicable general Pretreatment Standards, categorical Pretreatment Standards, local limits, and State and local law. 4) Self-monitoring, sampling, reporting, notification, and record keeping requirements. These requirements shall include an identification of pollutants (or best management practice) to be monitored, sampling location, sampling frequency, and sample type. 5) The process for seeking a waiver from monitoring for a pollutant neither present nor expected to be present in the discharge in accordance with Section 4.03.030.080. 6) Any grant of the monitoring waiver by the City shall be included as a condition in the User's permit. 7) Statement of applicable civil and criminal penalties for violation of Pretreatment Standards and requirements, and any applicable compliance schedule. Such schedules may not extend the time for compliance beyond that required by applicable federal deadlines. 8) Requirements to control slug discharges, if determined by the City to be necessary. 9) Requirements for notification of the City of any new wastewater constituent or change in volume or character of the wastewater being discharged or change in production. 10) Requirements for notification of the City of slug loads and accidental discharges. 11) Requirements for requesting amendments to the permit for an increase or change in contribution to the wastewater system. 12) Requirements for notification of the City upon violation of the permit. 13) Requirements for the handling and proper disposal of Hazardous Waste. B. Permits may contain, but need not be limited to, the following: 1) Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization; 2) Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the POTW; 3) Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW; 4) Requirements for installation and maintenance of inspection and sampling facilities and equipment, including flow measurement devices; 5) Compliance schedules; and 6) Other conditions as the City requires to ensure compliance herein. Section 4.03.030.043 Permit appeal process. 1) The industrial user may petition to appeal the terms of the permit within 30 days of issuance of the final permit. The petition must be submitted in writing to the City. Failure to submit a petition for review shall be deemed to be a waiver of the appeal. The petition must indicate the permit provisions objected to, the reasons for the objection, and the alternative condition, if any, to be placed in the permit. 2) The effectiveness of the permit shall not be stayed pending reconsideration by the City. After considering the petition and any arguments put forth by the permit writer, the City will determine if the permit should be modified. If reconsideration is denied, the original permit shall remain in effect. If modifications to the permit are warranted, the permit will be reissued. 3) The City's decision not to reconsider the final permit shall be considered final administrative action for purposes of judicial review. The industrial user seeking judicial review must do so by filing a petition with the Court of Appeals for the State of Oregon within 60 days. Failure to submit a petition for judicial review shall be deemed to be a waiver of the appeal. Section 4.03.030.044 Permit duration, reissuance and modification. Permits will be issued for a specified time period (in no case more than five years). The user shall apply for reissuance of the permit a minimum of 180 days prior to the expiration of the existing permit. The terms and conditions of the permit may be modified by the City during the term of the permit if just cause exists, and shall include a reasonable time schedule for compliance. Section 4.03.030.045 Permit transferability. Individual wastewater discharge permits may be transferred to a new owner or operator only if the permittee gives advance notice to the City and the City approves the permit transfer. The notice to the City must include a written certification by the new owner or operator which: 1. States that the new owner and/or operator has no immediate intent to change the facility's operations and processes; 2. Identifies the specific date on which the transfer is to occur; 3. Acknowledges full responsibility for complying with the existing individual wastewater discharge permit; and 4. States that a copy of the existing permit has been provided to the new owner or operator. Failure to provide the City advance notice of a transfer or failure to provide a copy of the existing permit to the new owner or operator renders the individual wastewater discharge permit void as of the date of facility transfer. Section 4.03.030.050 Reporting requirements; compliance date. Users with permits containing compliance schedules shall submit a compliance report to the City within 90 days after the date for compliance. New sources shall submit a report to the City indicating the nature, concentration, and flow rates of regulated pollutants following commencement of discharge to the wastewater system. Compliance reports shall state whether the limits or requirements are being met and, if not, what is necessary to bring the user into compliance. In cases where the Pretreatment Standard requires compliance with a Best Management Practice or Pollution Prevention alternative, the Industrial User shall submit documentation as required by the City or the applicable Pretreatment Standards to determine compliance with the Pretreatment Standard. The report shall be signed by an authorized representative of the user. Section 4.03.030.060 Periodic compliance reports. A. Significant Industrial Users required by permit to sample and/or monitor discharge, shall submit to the City no less than twice per year (each June and December), or as required by permit, a report indicating the nature and amount of pollutants in the discharge to the wastewater system. In cases where the Pretreatment Standard requires compliance with a Best Management Practice (BMP) or Pollution Prevention alternative, the Significant Industrial User must submit documentation required by the City or the Pretreatment Standard necessary to determine the compliance status of the User. B. The City may authorize the Industrial User subject to a categorical Pretreatment Standard to forego sampling of a pollutant regulated by a categorical Pretreatment Standard if the Industrial User has demonstrated through sampling and other technical factors that the pollutant is neither present nor expected to be present in the Discharge, or is present only at background levels from intake water and without any increase in the pollutant due to activities of the Industrial User. This authorization is subject to the following conditions: 1) The City may authorize a waiver where a pollutant is determined to be present solely due to sanitary wastewater discharged from the facility provided that the sanitary wastewater is not regulated by an applicable categorical Standard and otherwise includes no process wastewater. 2) The monitoring waiver is valid only for the duration of the effective period of the industrial wastewater discharge permit or other equivalent individual control mechanism, but in no case longer than 5 years. The User must submit a new request for the waiver before the waiver can be granted for each subsequent industrial wastewater discharge permit. 3) In making a demonstration that a pollutant is not present, the Industrial User must provide data from at least one sampling of the facility's process wastewater prior to any treatment present at the facility that is representative of all wastewater from all processes. 4) The request for a monitoring waiver must be signed in accordance with Section 4.03.030.085 and include the certification statement in 40 CFR 403.6(a)(2)(ii). 5) Non-detectable sample results may only be used as a demonstration that a pollutant is not present if the EPA approved method from 40 CFR part 136 with the lowest minimum detection level for that pollutant was used in the analysis. 6) Any grant of the monitoring waiver by the City must be included as a condition in the User's permit. The reasons supporting the waiver and any information submitted by the User in its request for the waiver must be maintained by the City for 3 years after expiration of the waiver. 7) Upon approval of the monitoring waiver and revision of the User's permit by the City, the Industrial User must certify on each report with the statement below, that there has been no increase in the pollutant in its waste stream due to activities of the Industrial User: Based on my inquiry of the person or persons directly responsible for managing compliance with the Pretreatment Standard for 40 CFR _______ [specify applicable National Pretreatment Standard part(s)], I certify that, to the best of my knowledge and belief, there has been no increase in the level of ______ [list pollutant(s)] in the wastewaters due to the activities at the facility since filing of the last periodic report under 40 CFR 403.12(e)(1). 8) In the event that a waived pollutant is found to be present or is expected to be present based on changes that occur in the User's operations, the User must immediately: Comply with the monitoring requirements of paragraph (A) of this section or other more frequent monitoring requirements imposed by the City; and notify the City. 9) This provision does not supersede certification processes and requirements established in categorical Pretreatment Standards, except as otherwise specified in the categorical Pretreatment Standard. C. If a Significant Industrial User subject to the reporting requirement in this section monitors any regulated pollutant at the appropriate sampling location more frequently than required by the City, using the procedures prescribed in Section 4.03.030.106, the results of this monitoring shall be included in the report. D. Industrial Users required to submit a compliance report may submit the report electronically for the sole purpose of meeting a compliance deadline. The electronic report must be followed by a wet signature, hard copy report, within seven (7) days of submitting the report electronically, in order to maintain compliance. Section 4.03.030.070 Reporting of accidental discharge or slug load. If, for any reason, an Industrial User does not comply with or will be unable to comply with any prohibition or limitations herein, the facility responsible for such discharge shall immediately notify the City so that the corrective action may be taken to protect the treatment system. In addition, a written report addressed to the City detailing the date, time, and cause of the accidental discharge or slug load, the quantity and characteristics of the discharge; and corrective action taken to prevent future discharges shall be filed by the responsible facility within five (5) days of the occurrence of the noncomplying discharge. Section 4.03.030.071 Protection from accidental discharge or slug discharge. 1) Each Industrial User shall provide protection from accidental discharge or slug load of prohibited materials or other wastes regulated hereby. Facilities to prevent accidental discharge or slug load of prohibited materials shall be provided and maintained at the owner or operator's own cost and expense. Detailed plans showing facilities and operating procedures to provide this protection shall be submitted to the Control Authority. 2) A notice shall be permanently posted by Industrial Users in a prominent place, advising employees when to call in the event of an accidental discharge or slug load. Employers shall advise employees, who may cause accidental discharges or slug loads, of the notification procedure. 3) Significant Industrial Users are required to notify the POTW immediately of any changes at its facility affecting potential for a Slug Discharge. 4) If the City decides that a slug control plan is needed, the plan shall contain, at a minimum, the following elements: a) Description of discharge practices, including non-routine batch discharges; b) Description of stored chemicals; c) Procedures for immediately notifying the POTW of slug discharges, including any discharge that would violate a prohibition under Section 4.03.020.040 (Prohibited discharges) of this Chapter with procedures for follow-up written notification within five days; and d) If necessary, procedures to prevent adverse impact from accidental spills, including inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site run-off, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants (including solvents), and/or measures and equipment for emergency response. Section 4.03.030.080 Reporting of changes in wastewater characteristics. All Industrial Users shall promptly notify the City in advance of any substantial change in the volume or character of pollutants in their discharge, including the listed or characteristic hazardous wastes for which the Industrial User has submitted initial notification under Section 4.03.020.082. Formal written notification shall be made at least 30 days prior to such introduction and the Industrial User shall obtain approval from the City to do so. Section 4.03.030.081 Notification of the discharge of hazardous wastes. 1) The Industrial User shall notify the City, the EPA Regional Waste Management Division Director, and the Oregon Department of Environmental Quality hazardous waste authorities in writing of any discharge into the POTW of a substance, which, if otherwise disposed of, would be a hazardous waste. Such notification shall include the name of the hazardous waste as set forth in 40 CFR part 261, the EPA hazardous waste number, and the type of discharge (continuous, batch, or other). The notification shall also contain the following information: identification of the hazardous constituents contained in the waste, an estimation of the mass and concentration of such constituents, and an estimation of the mass of constituents expected to be discharged during the next twelve months. All notifications shall take place within 180 days after the effective date of this Chapter. Industrial Users who begin discharging after the effective date of this Chapter shall provide the notification no later than 180 days after the discharge of the listed or characteristic hazardous waste. Any notification under this Section need be submitted only once for each hazardous waste discharged. (However, notifications of changed discharges must be submitted under Section 4.03.020.081.) The notification requirement in this Section does not apply to pollutants already reported under self-monitoring requirements of Sections 4.03.030.030, 4.03.030.070, and 4.03.030.080. 2) Industrial Users who discharge no more than 15 kilograms of non-acute hazardous wastes in a calendar month are not required to notify EPA or the Oregon Department of Environmental Quality. Industrial Users who discharge any amount of non-acute hazardous wastes are required to notify the City. Industrial Users who discharge any amount of acute hazardous wastes are required to notify the City, EPA, and the Oregon Department of Environmental Quality. 3) In the case of EPA listing any additional characteristics of hazardous waste or listing a new substance as a hazardous waste, the Industrial User shall notify the City, the EPA, and the Oregon Department of Environmental Quality of the discharge of such substance within 90 days of the effective date of such listing. 4) In the case of any notification made under this Section, the Industrial User shall certify that it has a program in place to reduce the volume and toxicity of hazardous waste generated to the degree it has determined to be economically practical. Section 4.03.030.082 Notification of violation and sampling requirement. If sampling performed by an Industrial User indicates a violation, the User must notify the City within twenty-four (24) hours of becoming aware of the violation. The User shall also repeat the sampling and analysis and submit the results of the repeat analysis to the City within thirty (30) days after becoming aware of the violation. Resampling by the Industrial User is not required if the City performs sampling at the User's facility at least once a month, or if the City performs sampling at the User's facility between the time when the initial sampling was conducted and the time when the User or the City receives the results of this sampling, or if the City has performed the sampling and analysis in lieu of the Industrial User. If the City performs the sampling and analysis in lieu of the Industrial User, the City will perform the repeat sampling and analysis unless the City notifies the User of the violation and requires the User to perform the repeat sampling and analysis. Section 4.03.030.083 Recordkeeping. Users subject to the reporting requirements shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required, any additional records of information obtained pursuant to monitoring activities undertaken by the User independent of such requirements, and documentation associated with Best Management Practices established under Section 4.03.030.122. Records shall include the date, exact place, method, and time of sampling, and the name of the person(s) taking the samples; the dates analyses were performed; the name of the person(s) performing the analyses; the analytical techniques or methods used; and the results of such analyses. These records shall remain available for a period of at least three (3) years. This period shall be automatically extended for the duration of any litigation concerning the User or the City, or where the User has been specifically notified of a longer retention period by the City. Section 4.03.030.084 Signatory requirements for industrial user reports. Reports required to be submitted by Significant Industrial Users (including Non-Significant Categorical Industrial Users) shall be signed as follows: 1) By a responsible corporate officer, if the industrial user submitting the reports is a corporation. A responsible corporate officer means: a) A president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy- or decision-making functions for the corporation; or b) The manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiate and direct other comprehensive measures to assure long-term environmental compliance with environmental laws and regulations; can ensure that the necessary systems are established or actions taken to gather complete and accurate information for control mechanism requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. 2) By a general partner or proprietor if the industrial user submitting the reports is a partnership or sole proprietorship respectively. 3) By a duly authorized representative of the individual designated in paragraph (1) or (2) of this section if: a) The authorization is made in writing by the individual described in paragraph (1) or (2); b) The authorization specifies either an individual or a position having responsibility for the overall operation of the facility from which the industrial discharge originates, such as the position of plant manager, operator of a well, or well field superintendent, or a position of equivalent responsibility, or having overall responsibility for environmental matters for the company; and c) The written authorization is submitted to the City. 4) If an authorization under paragraph (3) of this section is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, or overall responsibility for environmental matters for the company, a new authorization satisfying the requirements of paragraph (3) of this section must be submitted to the City prior to or together with any reports to be signed by an authorized representative. Section 4.03.030.090 Monitoring facilities. Significant industrial users shall provide, operate, and maintain, at the user's expense, monitoring facilities to allow inspection, sampling, and flow measurement of the building sewer and/or internal drainage systems. The monitoring facilities shall be large enough to allow accurate sampling and preparation of samples for analysis. All monitoring facilities shall be maintained at all times in a safe and operating condition, at the expense of the user. Complete plans on all phases of the proposed installation, including all equipment proposed for use, shall be submitted to the City for approval prior to construction. Construction of monitoring facilities shall be completed within 90 days following written notice by the City. Section 4.03.030.100 Right of entry: Inspection and sampling. The City shall have the right to enter the premises of any User to determine whether the User is complying with all requirements of this ordinance and any individual wastewater discharge permit or order issued hereunder. Users shall allow the City ready access to all parts of the premises for the purposes of inspection, sampling, records examination and copying, and the performance of any additional duties. 1) Where a User has security measures in force which require proper identification and clearance before entry into its premises, the User shall make necessary arrangements with its security guards so that, upon presentation of suitable identification, the City shall be permitted to enter without delay for the purposes of performing specific responsibilities. 2) The City shall have the right to set up on the User's property, or require installation of, such devices as are necessary to conduct sampling and/or metering of the User's operations. 3) The City may require the User to install monitoring equipment as necessary. All devices used to measure wastewater flow and quality shall be calibrated at least annually to ensure their accuracy. 4) Whether constructed on public or private property, the monitoring facilities shall be provided in accordance with the City's requirements and all applicable local construction standards and specifications. If required by the City, such facilities shall be constructed and maintained in such a manner so as to enable the City to perform independent monitoring activities. 5) Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and/or sampled shall be promptly removed by the User at the written or verbal request of the City and shall not be replaced. The costs of clearing such access shall be born by the User. 6) Unreasonable delays in allowing the City access to the User's premises shall be a violation of this ordinance. Section 4.03.030.105 Analytical requirements. All pollutant analyses, including sampling techniques, to be submitted as part of a report or wastewater discharge permit application shall be performed in accordance with the techniques prescribed in 40 CFR Part 136 and amendments thereto, unless otherwise specified in an applicable categorical Pretreatment Standard. If 40 CFR Part 136 does not contain sampling or analytical techniques for the pollutant in question, or where the EPA determines that the Part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analyses shall be performed by using validated analytical methods or any other applicable sampling and analytical procedures, including procedures suggested by the City or other parties approved by EPA. Section 4.03.030.106 Sample collection procedures. 1) Samples collected by Industrial Users to satisfy reporting requirements must be based on data obtained through appropriate sampling and analysis performed during the period covered by the report, based on data that is representative of conditions occurring during the reporting period. 2) Grab samples must be used for temperature, pH, cyanide, total phenols, oil and grease, sulfides, and volatile organic compounds. For all other pollutants, 24-hour composite samples must be obtained through flow-proportional composite sampling techniques, unless time-proportional composite sampling or grab sampling is authorized by the City. 3) Where time-proportional composite sampling or grab sampling is authorized by the City, the samples must be representative of the discharge. 4) Using protocols (including appropriate preservation) specified in 40 CFR Part 136 and appropriate EPA guidance, multiple grab samples collected during a 24-hour period may be composited prior to the analysis as follows: for cyanide, total phenols, and sulfides the samples may be composited in the laboratory or in the field; for volatile organics and oil & grease the samples may be composited in the laboratory. Composite samples for other parameters unaffected by the compositing procedures as documented in approved EPA methodologies may be authorized by the City, as appropriate. 5) For sampling required in support of baseline monitoring and 90-day compliance reports, a minimum of four (4) grab samples must be used for pH, cyanide, total phenols, oil & grease, sulfide and volatile organic compounds for facilities for which historical sampling data do not exist; for facilities for which historical sampling data are available, the City may authorize a lower minimum. For Industrial User self-monitoring reports, the City shall require the number of grab samples necessary to assess and assure compliance by Industrial Users with applicable Pretreatment Standards and Requirements. Section 4.03.030.110 Pretreatment. 1) Users shall provide necessary wastewater treatment as required to comply with this chapter. Any treatment facilities required shall be provided, operated, and maintained at the user's expense. Complete detailed plans and specifications for treatment facilities shall be submitted to the City for review and acceptance prior to construction. Acceptance of the facility by the City does not relieve the user's responsibility to modify the facilities in order to achieve compliance with provisions herein. Modifications to facility or method of operation shall be reported to, and be acceptable to, the City prior to the user making the change. Users may be required by the City to maintain records of production and related factors, effluent flows, and pollutant amounts or concentrations. 2) All records relating to compliance with this Chapter shall be made available to the City upon request. Section 4.03.030.120 Local limits. The City has calculated local limits for various pollutants which may be discharged to the POTW. The limits have been calculated based on total mass loads which can be accepted by the POTW from all sources. The document specifying the local limits and methodology entitled, City of Corvallis Local Limits and Methodology, will be used by the City to establish specific discharge limits from each significant industrial user. Section 4.03.030.121 Industry specific limits. The City may establish industry specific limits for pollutants for which the City has not developed local limits. Section 4.03.030.122 BMPS and local limits. At the sole discretion of the City, best management practices (BMPs) can be used in conjunction with or in lieu of local limits. BMPs can be used to implement general prohibitions, specific prohibitions, and become pretreatment standards. Section 4.03.030.130 Confidential information. 1) Information and data concerning a user obtained from reports, questionnaires, permit applications, permits, monitoring programs, and inspections shall be available to the public without restriction unless the user specifically requests and is able to demonstrate to the satisfaction of the City that the release of such information would divulge information, processes or methods of production entitled to protection as trade secrets of the user. 2) When requested by the person furnishing a report, the portions of a report which might disclose trade secrets or secret processes shall not be made available for inspection by the public. However, such portions of a report shall be available for use by any Federal, State or local governmental agency in judicial review or enforcement proceedings involving the person furnishing the report. Wastewater constituents and characteristics will not be recognized as confidential information. Section 4.03.030.131 Public notification of industrial users in significant noncompliance. The City shall provide at least annual public notification in a newspaper(s) of general circulation that provides meaningful public notice within the jurisdiction(s) served by the POTW of Industrial Users which, at any time during the previous 12 months, were in significant noncompliance with applicable Pretreatment requirements. Section 4.03.030.140 Harmful discharges enforcement. 1) The City may suspend the wastewater treatment service and/or an industrial wastewater discharge permit when such suspension is necessary, in the opinion of the City, in order to stop an actual or threatened discharge which presents or may present an imminent or substantial endangerment to the health or welfare of persons or to the environment, causes or may cause interference to the POTW, or causes or may cause the City to violate any condition of its NPDES Permit. 2) Any person notified of a suspension of wastewater treatment service and/or the industrial wastewater discharge permit shall immediately stop or eliminate the discharge. In the event of a failure of the person to comply voluntarily with the suspension order, the City shall take such steps as deemed necessary including severance of the wastewater connection. The City will usually allow a minimum of 48 hours before a severance or restriction is effective; however, the City may immediately effect a severance or restriction to prevent or minimize damage to the POTW system or endangerment to any individuals. The City shall reinstate the industrial wastewater discharge permit and/or the wastewater treatment service upon proof of the elimination of the noncomplying discharge. The users shall submit a detailed written statement describing the causes of the harmful contribution and the measures taken to prevent any future occurrence within 15 days of the date of occurrence. Section 4.03.030.150 Revocation of permit. The permit of any user who commits any of the following actions is subject to permit revocation in accordance with the procedures herein: 1) Failure of a user to factually report the wastewater constituents and characteristics of user's discharge; 2) Failure of the user to report significant changes in operations, or wastewater constituents and characteristics; 3) Refusal of reasonable access to the user's premises for the purpose of inspection or monitoring; or 4) Violation of any condition of the permit. Section 4.03.030.160 Notification of violation. Whenever the City finds that any user has violated or is violating this Chapter, industrial wastewater discharge permit, or any prohibition or limitation of requirements contained herein, the City may, by mail, serve upon such person a written notice stating the nature of the violation. Within 30 days of the date of the notice, a plan for the satisfactory correction thereof shall be submitted to the City by the user. Section 4.03.030.170 Show cause hearing. 1) Whenever the City finds that any user fails to reply to a notification of violation, or fails to implement a plan as provided in Section 4.03.030.160 above, the City may serve, upon such a person, a written notice specifying the time and place of a hearing to be held by the City regarding the violation, the reasons why the action is to be taken, the proposed enforcement action, and directing the user to show cause why the proposed enforcement action should not be taken. The notice of the hearing shall be served personally or by registered or certified mail (return receipt requested) at least ten (10) days before the hearing. Service may be made on any agent or officer of a corporation. 2) Further orders and directives as are necessary and appropriate may be issued. Section 4.03.030.171 Compliance order. The City may issue a compliance order to direct any user to achieve or restore compliance by a date specified in the order. A compliance order is issued unilaterally and the terms of the order need not be discussed with the user in advance. Section 4.03.030.172 Consent order. The City may issue a consent order when any user assumes responsibility for their noncompliance and is willing (in good faith) to correct the cause(s) of the noncompliance. A consent order is a negotiated settlement between the City and the user. Section 4.03.030.173 Verbal warning. The City may issue a verbal warning in response to isolated or infrequent occurrences of noncompliance by any user. Verbal warnings of noncompliance may be issued in person, by telephone, by email, or any combination thereof. Section 4.03.030.174 Cease and desist orders When the City finds that a User has violated, or continues to violate, any provision of this ordinance, an individual wastewater discharge permit, or order issued hereunder, or any other Pretreatment Standard or Requirement, or that the User's past violations are likely to recur, the City may issue an order to the User directing it to cease and desist all such violations and directing the User to: A. Immediately comply with all requirements; and B. Take such appropriate remedial or preventive action as may be needed to properly address a continuing or threatened violation, including halting operations and/or terminating the discharge. Issuance of a cease and desist order shall not be a bar against, or a prerequisite for, taking any other action against the User. Section 4.03.030.175 Termination of discharge. In addition to the provisions in Section 4.03.030.150, any User who violates the following conditions is subject to discharge termination: A. Violation of individual wastewater discharge permit conditions; B. Failure to accurately report the wastewater constituents and characteristics of its discharge; C. Failure to report significant changes in operations or wastewater volume, constituents, and characteristics prior to discharge; D. Refusal of reasonable access to the User's premises for the purpose of inspection, monitoring, or sampling; or E. Violation of the Pretreatment Standards in Section 4.03.020. Such User will be notified of the proposed termination of its discharge and be offered an opportunity to show cause under Section 4.03.030.170 why the proposed action should not be taken. Exercise of this option shall not be a bar to, or a prerequisite for, taking any other action against the User. Section 4.03.030.180 Legal action. If any user discharges sewage, industrial wastes or other wastes into the City's wastewater treatment system contrary to the provisions of this chapter, Federal or State of Oregon Pretreatment Requirements, or any order of the City, the City may commence court action for appropriate legal and/or equitable relief, including the recovery of costs and expenses incurred by the City arising from the user's violation. Section 4.03.030.181 Injunctive relief. When the City finds that a User has violated, or continues to violate, any provision of this ordinance, an individual wastewater discharge permit, or order issued hereunder, or any other Pretreatment Standard or Requirement, the City may petition the Benton County Circuit Court through the City's Attorney for the issuance of a temporary or permanent injunction, as appropriate, which restrains or compels the specific performance of the individual wastewater discharge permit, order, or other requirement imposed on activities of the User. The City may also seek such other action as is appropriate for legal and/or equitable relief, including a requirement for the User to conduct environmental remediation. A petition for injunctive relief shall not be a bar against, or a prerequisite for, taking any other action against a User.
(Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019) (Ord. No. 2019-20, § 1(Exh. A), 07-15-2019)
Ask a question about Corvallis law
Corpus searches the Corvallis sections it holds and shows the ones that match, with their citations. Free, no sign-in.