§ 4.05.090 — Post-construction stormwater quality plan required
Municipal Code of the City of Corvallis, Oregon (Codified through Ordinance No. 2026-31, enacted October 19, 2026. (Supp. No. 70, Update 2)) · Corvallis Municipal Code § 4.05.090
Corpus is an independent public-information project, not the official City of Corvallis website. Stable reference: corpuslaw.us/code/ae76f930-5fe8-4927-a982-2244c0b94572
Section 4.05.090 - Post-construction stormwater quality plan required.
Applicants for a post-construction stormwater quality permit must submit a post-construction stormwater quality plan as a part of their permit application. The plan must comply with the minimum requirements outlined in the Engineering Standards and Construction Specifications and the provisions of this Chapter. Each post-construction stormwater quality plan must be stamped by a professional licensed in Oregon as a civil or environmental engineer or landscape architect.
(Ord. No. 2023-28, § 2(Exh. B), 11/06/2023)
Ask a question about Corvallis law
Corpus searches the Corvallis sections it holds and shows the ones that match, with their citations. Free, no sign-in.
