§ 4.13.90 — MAP Refinements
Municipal Code of the City of Corvallis, Oregon (Codified through Ordinance No. 2026-31, enacted October 19, 2026. (Supp. No. 70, Update 2)) · Corvallis Land Development Code § 4.13.90
Corpus is an independent public-information project, not the official City of Corvallis website. Stable reference: corpuslaw.us/code/2f7ddff6-9b56-4715-bbe2-9c35de2004f0
Section 4.13.90 - MAP Refinements.
4.13.90.01 Map Refinements Defined. Map Refinements are adjustments made through professional analyses to refine the actual boundaries of some Natural Resources and Natural Hazards. Map Refinements must be made in accordance with the provisions in Chapter 4.5 - Floodplain Provisions, Chapter 4.13 - Riparian Corridor and Wetland Provisions, and Chapter 4.14 - Landslide Hazard and Hillside Development Provisions. The Map Refinements governed by this chapter are specifically allowed to determine the location and extent of the: a. Top-of-bank of Streams and rivers; b. Riparian Corridors, once Top-of-bank is accurately determined; and c. Wetlands, through delineations approved by the Oregon Department of State Lands. 4.13.90.02 Map Refinements Provisions. Map Refinement provisions for Top-of-bank, and Riparian Corridor and wetland boundaries are outlined below. Map Refinement provisions for the 0.2-foot Floodway, the 1.0-feet Floodway, and the 100-year Floodplain are outlined in Chapter 4.5 - Floodplain Provisions. Map Refinement provisions for Landslide Hazard areas and slopes are outlined in Chapter 4.14 - Landslide Hazard and Hillside Development Provisions. Map Refinements are also adjustments to resolve registration issues that may occur between different GIS layers or maps. a. Top-of-bank and Riparian Corridor Boundaries - Riparian Corridor Boundaries and widths are as noted on the Riparian Corridors and Wetlands Map. They are measured with respect to Top-of-bank. The precise Top-of-bank is determined in the field by a licensed civil engineer. The civil engineer determines the location of Top-of-bank using two-feet contour intervals and using the methodology cited in the definition for Top-of-bank in Chapter 1.6 - Definitions. The two-feet contour intervals must be surveyed by a licensed surveyor or civil engineer. The outer bounds of the Riparian Corridors is determined by measuring from the precise location of Top-of-bank, using the widths specified on the Riparian Corridors and Wetlands Map. The boundaries must then be surveyed by a licensed surveyor or civil engineer and mapped using two-feet contours. b. Wetland Boundaries - Wetland boundaries must be determined by one of the following two methods: 1. Using the Corvallis Local Wetland Inventory Map, in which case a 25-feet setback/buffer must be added to the upland edge of the wetland; or 2. Using an established and unexpired wetland delineation accepted and approved by the Department of State Lands (DSL), in which case, no setback/buffer is required from the upland edge of the wetland. 4.13.90.03 Map Refinement Procedures. Adjustments to maps consistent with the provisions of Section 4.13.90.01 and Section 4.13.90.02, above, are considered to be Map Refinements and may be Ministerially adjusted on the relevant maps, with no land use process required other than a demonstrated adherence to the provisions of Section 4.13.90.01 and Section 4.13.90.02.
Ask a question about Corvallis law
Corpus searches the Corvallis sections it holds and shows the ones that match, with their citations. Free, no sign-in.
