§ 4.7.50 — Sign permit procedure

Municipal Code of the City of Corvallis, Oregon (Codified through Ordinance No. 2026-31, enacted October 19, 2026. (Supp. No. 70, Update 2)) · Corvallis Land Development Code § 4.7.50

Corpus is an independent public-information project, not the official City of Corvallis website. Stable reference: corpuslaw.us/code/5e297ce0-5952-4e6d-aabe-ace45ab531d7

Section 4.7.50 - Sign permit procedure

Unless exempt under Section 4.7.40, a Sign Permit must be obtained prior to the installation of each sign. A Sign Permit is also required for structural and/or electrical modifications to existing signs, including changes of sign size, shape, and/or location. A Sign Permit is not required for normal maintenance and repair of a sign or sign structure, such as painting, repainting and/or cleaning. a. A completed Sign Permit ("Permit") application accompanied by the appropriate fee must be submitted for review to the Development Services Division. b. The Director will review the Permit application to ensure it is complete and accompanied by the appropriate fee, and that the proposed sign complies with the requirements of this Code and other City ordinances. A Permit shall be issued only when all of these criteria have been met. Additionally, unless exempt per Section 2.11.40.e, Detached Signs in Special Flood Hazard Areas require a Flood Development Permit per Chapter 2.11 - Floodplain Development Permit. c. An approved Permit does not replace, supersede, or waive structural or electrical standards and permits required by the Corvallis Building Code. These other permits must also be obtained prior to work on the installation of a sign. d. The applicable Permit review fee will be doubled if sign installation is begun before the Permit is obtained. Payment of the double fee shall not relieve any person from full compliance with these regulations. e. The Permit will expire if a sign is not installed within 180 days from the date of Permit issuance. Re-application must include a new, fully completed application form and a new Permit review fee. The application must comply with the criteria in "b," above, including any amendments to these regulations adopted since the previous Permit approval. f. An approved Permit may be revoked by the Director if the Sign is not constructed and installed as approved, if incorrect information was provided on the application, or if the City approved the Permit in error. A decision of the Director may be appealed in accordance with Chapter 2.19 - Appeals. g. All signs are subject to inspection and reinspection by the Director. Footing inspections may be required for all signs having footings.

(Ord. No. 2025-28, § 2, eff. 6-26-2025)

Ask a question about Corvallis law

Corpus searches the Corvallis sections it holds and shows the ones that match, with their citations. Free, no sign-in.