§ 4.8.40 — Setback and Separation For The Facility Perimeter
Municipal Code of the City of Corvallis, Oregon (Codified through Ordinance No. 2026-31, enacted October 19, 2026. (Supp. No. 70, Update 2)) · Corvallis Land Development Code § 4.8.40
Corpus is an independent public-information project, not the official City of Corvallis website. Stable reference: corpuslaw.us/code/b7f835fc-5e11-44f1-931a-498e0269019c
Section 4.8.40 - Setback and Separation For The Facility Perimeter.
a. Setback between Facility Structures and Abutting Properties - Between the abutting property and any Dwelling or Accessory facility structure or facility road a minimum setback shall be required equal to the rear yard setback specified by the zone of the abutting property, but not less than five feet b. Setback between Facility Structures and a Public Street Right-of-Way - Between the public right-of-way and any Dwelling or Accessory facility structure, an average setback of 25 feet shall be required along the public street, with a minimum setback equal to the front yard setback of the zone.
Ask a question about Corvallis law
Corpus searches the Corvallis sections it holds and shows the ones that match, with their citations. Free, no sign-in.
