Section 9.03.100 - Erosion prevention and sediment control plan requirements.
The applicant shall submit an Erosion Prevention & Sediment Control Plan (EPSCP) for projects requiring an EPSC permit prior to commencing any ground disturbing activity. All plans shall comply with the minimum standards set forth in the City of Corvallis Erosion Prevention & Sediment Control Manual. 1) Erosion Prevention and Sediment Control Plans. a) Erosion prevention and sediment control plans shall be prepared in conformance with and shall demonstrate compliance with these Standards and the City of Corvallis Erosion Prevention & Sediment Control Manual in effect at the time of application. b) The EPSCP shall be reviewed and approved by the City Manager prior to commencing any ground disturbing activity including installation of erosion and sediment control BMPs. c) The EPSCP shall be implemented only after approval and prior to commencing any ground disturbing activity. d) Subsequent development permits (Grading, Public Improvement, or Building) will not be issued prior to implementation of the EPSCP unless authorized by the City Manager or a designee of that office. 2) Approval of Erosion Prevention and Sediment Control Plan. a) The City Manager or a designee of that office shall approve the EPSCP if it demonstrates compliance with these Standards and the adopted City of Corvallis Erosion Prevention & Sediment Control Manual. An EPSC permit shall be issued following approval of the plan and verification from the applicant that all other rules and laws governing this aspect of development have been addressed and are in compliance. b) The responsible party shall be accountable for obtaining re-authorization for implementing any EPSCP modifications needed due to conflicts, omissions, changed conditions, damage or other factor jeopardizing compliance with these Standards. c) In cases where erosion is occurring, the responsible party must immediately install interim control measures to stabilize the condition and minimize sediment leaving the site. The responsible party will be required to provide new plans, or revisions to existing plans, for review that provide for long term erosion and sediment control. Upon approval of the plans, the new measures described must be implemented in a timely manner.
(Ord. 2020-17, § 58(Exh. A), 09/21/2020; Ord. 2004-17 § 1, 09/20/2004)