12.27.230 - General Development Standards.

A. The following standards apply to all regulated development within verified SNR Sites or Impact Areas. The standards in this section are in addition to all construction requirements imposed as conditions of approval by the City of Hillsboro or any other permit agency. 1. Boundaries Verified and Marked. Prior to any construction, demolition, grading or clearing on the site, the outer boundary of the impact area shall be established in accordance with Section 12.27.250 and shall be located, staked and demarcated with standard orange construction fencing or equivalent. 2. Stockpiling and Equipment Storage. During construction, there shall be no stockpiling of fill material, no parking, and/or no storage of construction equipment within a Significant Natural Resource Site or its Impact Area except within approved development areas. An exception to this standard may be approved by the Director during the Type II or Type III application process for staging activities for approved construction projects that occur within the permitted work window, based on demonstration by the applicant that no other practicable alternatives to the storage or stockpiling is available, and that measures to mitigate the effects of the storage or stockpiling on the SNR Site will be taken when the activities cease. A construction management site plan must show the locations of proposed equipment and material staging and stockpile areas. 3. Lighting. If a lighting plan for the development application is required pursuant to Section 12.50.240, it shall ensure that lighting fixtures do not directly, or indirectly from reflection, cause illumination within SNR Sites and Impact Areas in excess of a measurement of 0.5 foot candles of light. City approved street lights and safety lighting for parks are exempt from this standard. 4. Except for those uses and activities which are identified as exempt from providing compensatory mitigation, all regulated development or activities in an SNR Site or Impact Area are subject to Compensatory Mitigation Standards in Section 12.27.240. 5. Temporary development areas from construction activities must be fully restored by following on-site mitigation requirements in Section 12.27.240. 6. Landscaping plans for development applications submitted under Section 12.50.220 shall limit plantings within the SNR Sites to only species on the CWS Native Plant List. SNRO area improved and maintained in compliance with Section 12.27.240 may be used to satisfy the landscaping requirements in Section 12.50.220. 7. Proposed fences in an SNR Site must be designed to allow wildlife passage through sites and toward crossings under, over, or around streets. Alternatively, fences must be a maximum of 42 inches high with at least 12 inches of clearance between the ground and the lowest beam or wire. B. Residential Land Divisions. The following requirements apply to residential land divisions. 1. Areas to be protected as "undevelopable land" shall be determined through the SNRP review and identified on the plat. 2. The final plat of any land division on property containing SNR Sites shall designate that portion of the SNR Site defined as "undevelopable land" (under Section 12.01.500 under Acreage, Net) in a separate permanent open space tract. 3. Responsibility for maintenance and preservation of the permanent open space tract(s) consistent with this section shall be specified in covenants, conditions and restrictions or other legal instrument subject to approval by the Director and recorded with the final plat. C. Environmental Report. 1. An Environmental Report is required for the following uses and activities. a. Proposed activities subject to a SNRP II which will disturb more than 500 square feet within a SNR Level 3 Site. b. Proposed activities subject to a SNRP III. 2. Compliance with the recommendations of the Environmental Report is required. In addition to the required compensatory mitigation, the applicant must comply with the recommendations on the nature and extent to which the alterations and improvements to be made could be modified in order to reduce negative impacts on the SNR to the maximum feasible extent as outlined in the Environmental Report. 3. The Environmental Report shall be prepared by 1 or more Qualified Natural Resources Professionals and shall include the additional information listed in Subsections 1 through 7. To evaluate the Environmental Report, the Director may consult with a third-party professional with appropriate expertise to evaluate either an Abbreviated or a Full Environmental Report, or may rely on appropriate staff expertise. If the Director finds that the Environmental Report is inadequate and deficient in addressing the applicable requirements, the Director shall reject the Environmental Report. Such rejection shall be grounds to deny a development or permit application associated with the SNRP, involving an SNR Site or its Impact Area. At a minimum, the Environmental Report shall include the following: a. The delineated location of Significant Natural Resource Sites and Impact Areas and the boundaries of the Significant Natural Resources Overlay designation; b. A delineation of each of the resources present on the site (Wetland, Riparian Corridor, Upland Wildlife Habitat) and the conditions of topography, soils and vegetation found on the site, including: site topography at 2-foot contour intervals; the type, species and diameter (4.5 feet above grade) of all trees over 4.5-inch dbh; and the types and species of native and non-native vegetation) c. If requested by the Director, a cross-section view of the site showing the proposed use, topographic alterations, slopes and other pertinent information. d. If mitigation is required, a mitigation plan which includes the following information: i. The location of the impact to the Significant Natural Resource or Impact Area; ii. Existing conditions in the SNR or Impact Area prior to development; iii. The location of the proposed mitigation area; iv. A detailed planting plan of the proposed mitigation area with species and densities; and v. A narrative describing how the adverse impacts will be mitigated. e. A narrative assessment addressing impacts of the proposed development on the Significant Natural Resources (SNR) Site, its Impact Area, and the features and characteristics of the site as identified in the Local Wetlands Inventory; the adopted List of Significant Goal 5 Natural Resources Sites in Hillsboro; and the City of Hillsboro Goal 5 Natural Resources Inventory and Assessment Report. f. Recommendations on the nature and extent to which the proposed alterations and improvements could be modified in order to reduce negative impacts on the SNR to the maximum feasible extent.

(Ord. No. 6473, §§ 1, 2(Exh. A), 6-18-2024; Ord. No. 6508, § 1 (Exh. A), 11-4-2025)