§ 3.19.090 — Project Criteria
Municipal Code of the City of Hillsboro, Oregon (Codified through Ordinance No. 6513, adopted March 3, 2026 (Supp. No. 2)) · Hillsboro Municipal Code § 3.19.090
Corpus is an independent public-information project, not the official City of Hillsboro website. Stable reference: corpuslaw.us/code/a38a7300-9da8-4298-abf4-b8cf08e5b93d
3.19.090. - Project Criteria.
A. The City will evaluate each accepted application to determine whether or not to certify the proposed project. A project, to qualify for City certification, must satisfy each of the following criteria: 1. The project must be entirely located within an approved VHDZ located within the City's jurisdiction; 2. The project must include 1 or more equalized floors, as calculated by the City's calculator; 3. Construction or rehabilitation must have been started on each building included in the project; and 4. A minimum of 50% of the project's ground floor that fronts on the primary public street must be constructed to building code standards for commercial use or planned for commercial use upon completion. If a project has access to only 1 public street, the square footage of driveways, loading docks, bike storage, garbage receptacles, and building entryways shall be excluded before applying the 50% test. B. Certified projects with at least 1 equalized floor of low-income residential housing may qualify for a partial property tax exemption with respect to the land contained within the tax lot upon which the certified project stands for a period not less than 10 years, but will not qualify for a partial property tax exemption under the program for land not necessary for the low-income residential housing units to be built.
(Ord. 6264, § 1, 2018)
Ask a question about Hillsboro law
Corpus searches the Hillsboro sections it holds and shows the ones that match, with their citations. Free, no sign-in.
