9.48.030. - Construction and Restoration.

A. Construction Permits. 1. No person shall perform any work within the rights-of-way without first obtaining all required permits. The City shall not issue a permit for the construction, installation, maintenance or repair of utility facilities unless the utility operator of the facilities has a current franchise or license from the City to place, repair or maintain utility facilities in the rights-of-way, and all applicable fees have been paid. Utility operators shall not be required to obtain a permit for service drops to customer premises or routine maintenance or repairs where such drops, repairs or maintenance do not require cutting, digging, or breaking of, or damage to, the right-of-way and do not result in closing or blocking any portion of the travel lane for vehicular traffic. Notwithstanding the foregoing, if work requires the closure of pathways or sidewalks that result in an impediment or blockage to pedestrian or bicycle traffic, reasonable accommodations shall be made to ensure safe passage through or around the work site. 2. In the event of an emergency, a utility operator may perform work on its utility facilities without first obtaining a permit from the City, provided that, to the extent reasonably feasible, it attempts to notify the City prior to commencing the emergency work and in any event applies for a permit from the City as soon as reasonably practicable, but not more than 48 hours after commencing the emergency work. As used in this section, "emergency" means a circumstance involving: (a) an unscheduled utility service outage affecting 1 or more of the utility operator's customers; or (b) danger to public safety. Emergency also includes situations where the failure of the utility operator to act would result in subsection (A)(2)(a) or (b) within 24 hours. 3. Applications for permits to construct utility facilities shall be submitted upon forms to be provided by the City and shall be accompanied by drawings, plans and specifications in sufficient detail to demonstrate: a. That the facilities will be constructed in accordance with all applicable codes, rules, regulations and design and construction standards. b. The location and route of all utility facilities to be installed above-ground or on existing utility poles or other facilities utilized for mounting. c. The location and route of all the applicant's utility facilities on or in the rights-of-way to be located under the surface of the ground, including the line and grade proposed for the burial at all points along the route that are within the rights-of-way. The utility operator's existing utility facilities shall be differentiated on the plans from new construction. A cross section shall be provided showing the applicant's new and any existing utility facilities in relation to the street, curb, sidewalk or right-of-way. All existing utility facilities of other utility operators and other physical features of the applicant's proposed route shall be shown in sufficient detail to ensure the proposed utility facility can be constructed as shown in the plans. d. The construction methods to be employed for protection of existing structures, fixtures, and facilities within or adjacent to the rights-of-way, and description of any improvements that applicant proposes to temporarily or permanently remove or relocate. 4. All permit applications shall be accompanied by a written construction schedule, which shall include an estimated start date and a deadline for completion of construction. The construction schedule is subject to approval by the Public Works Director. 5. Prior to issuance of a construction permit, the applicant shall pay a permit fee in an amount to be determined by resolution of the Council in an amount reasonably related to the City's costs for reviewing and issuing permits, inspection, supervision, and regulation in exercising its authorities and duties under this subsection A of this section. 6. If satisfied that the applications, plans and documents submitted comply with all requirements of this subchapter, the Public Works Director shall issue a permit authorizing construction of the utility facilities, subject to such further conditions, restrictions or regulations affecting the time, place and manner of performing the work as they may deem necessary or appropriate. The Public Works Director may deny any permit application that does not comply with the requirements of this subsection. 7. If the application for permit is denied or the utility operator objects to any conditions, restrictions or regulations included in the permit, the applicant may file a written appeal with the City within 5 days of notice of denial or of issuance of the permit with the conditions, restrictions or regulations to which the utility operator objects. The Council will then set, notice and conduct a hearing on the applicant's appeal. 8. Except in the case of an emergency, the utility operator shall notify the Public Works Director not less than 2 working days in advance of any excavation or construction in the rights-of-way. 9. All construction practices and activities shall be in accordance with the permit issued by the City and City-approved final plans and specifications for the utility facilities. The Public Works Director and other designated City representatives shall be provided access to the work site and such further information as they may require to ensure compliance with such requirements. Any material change to the final plans and specifications in the course of work requires a modification to the permit. 10. All work which does not comply with the permit, the approved or corrected plans and specifications for the work, or the requirements of this subchapter, shall be corrected, moved or removed at the sole expense of the utility operator within 30 days of the City's discovery of the failure to comply, unless further time is agreed to in writing by the City. This obligation to correct, move or remove shall survive the term of the permit and any franchise or license unless the utility facilities have been removed or the City has provided written authorization for abandonment in place. The City is authorized to stop work in order to assure compliance with the provisions of this subchapter. 11. The utility operator shall promptly complete all construction activities so as to minimize disruption of the City rights-of-way and other public and private property. All construction work within the rights-of-way, including restoration, must be completed within 120 days of the date of issuance of the construction permit unless an extension or an alternate schedule has been approved by the appropriate City official. B. Construction Codes. Utility facilities shall be constructed, installed, operated and maintained in accordance with all applicable federal, state and local laws, including the NEC and the NESC, and in accordance with the construction documents submitted by or on behalf of the utility operator and approved by the City. C. Safety and Workmanship. A utility operator shall preserve and protect from injury or damage other utility operators' facilities and City facilities in the rights-of-way, the public using the rights-of-way and any adjoining property, and take other necessary measures to protect life and property, including, but not limited to, buildings, walls, fences, trees or facilities that may be subject to damage from the permitted work. A utility operator shall adhere to the Manual on Uniform Traffic Control Devices (MUTCD) and use suitable barricades, signs, flags, flagging attendants, lights, flares and other approved measures as required for the safety of all members of the general public and to prevent injury or damage to any person, vehicle or property by reason of such work in or affecting the rights-of-way or property. A utility operator shall be responsible for all injury to persons or damage to public or private property resulting from its failure to properly protect people and property and to carry out the work. D. Restoration. 1. When a utility operator does any work in or affecting any rights-of-way, it shall, at its own expense, promptly restore such ways or property to at least the same condition that it was in prior to excavation in accordance with applicable federal, state and local laws, and the permit issued by the City, unless otherwise directed by the Public Works Director. The utility operator shall notify the City in writing within 15 days of completing any restoration that the restoration is complete and in conformance with this subsection. 2. If weather or other conditions beyond the utility operator's control do not permit the complete restoration required by the City, the utility operator shall temporarily restore and maintain the affected rights-of-way or property as directed by the Public Works Director until a permanent restoration can be made. Such temporary restoration shall be at the utility operator's sole responsibility and expense and the utility operator shall promptly undertake and complete the required permanent restoration when the weather or other conditions no longer prevent such permanent restoration. Any corresponding modification to the construction schedule shall be subject to approval by the City. 3. If the utility operator fails to restore rights-of-way or property as required in the permit, the City shall give the utility operator written notice and provide the utility operator a reasonable period of time not less than 10 days, unless a threat to public safety is deemed to exist, and not exceeding 30 days to restore the rights-of-way or property. If, after said notice, the utility operator fails to restore the rights-of-way or property as required in the permit, the City shall cause such restoration to be made at the expense of the utility operator. E. Inspection. Every utility operator's facilities shall be subject to the right of periodic inspection by the City to determine compliance with the provisions of this subchapter and the permit issued by the City. Every utility operator shall cooperate with the City in permitting the inspection of utility facilities upon request of the City. The utility operator shall perform all testing, or permit the City to perform any testing at the utility operator's expense, required by the City to determine that the installation of the utility operator's facilities and the restoration of the right-of-way comply with the terms of this subchapter and the permit issued by the City. F. Coordination of Construction. All utility operators are required to make a good faith effort to both cooperate with and coordinate their construction schedules with those of the City and other users of the rights-of-way. 1. Prior to April 15 of each year, utility operators shall provide the City with a schedule of known proposed construction activities for that year in, around or that may affect the rights-of-way. 2. Prior to April 15 of each year, the City shall provide all franchised and licensed utility operators with a schedule of known proposed construction activities that may affect the rights-of-way or utility facilities in the rights-of-way. 3. Utility operators shall meet with the City annually, or as determined by the City, to schedule and coordinate construction in the rights-of-way. 4. All construction locations, activities and schedules within the rights-of-way shall be coordinated as ordered by the Public Works Director to minimize public inconvenience, disruption, or damages. G. Contractors. A utility operator may authorize a qualified contractor to perform any of the work required in this subchapter on the utility operator's behalf. Any contractor performing work on behalf of a utility operator shall be subject to the provisions of this subchapter. In the event a utility operator authorizes a contractor to perform work on its behalf, the utility operator shall remain responsible and liable for compliance with the provisions of this subchapter. Notwithstanding the foregoing and the requirements of HMC 9.48.090(A), all contractors shall comply with the insurance requirements set forth in the permit issued by the City.

(Ord. 6000, § 1, 2011; Ord. 6185, § 1, 2016)