17.27.260 Removal of Structural Driveways.
Upon revocation of the permit, the permittee or any successor permittee must, at permittee’s own cost, remove such structure within 30 days after written notice to the permittee by the City of such revocation, unless the City Council specifies a shorter period, and must return the street area in which the structure was located to the condition of the street area immediately surrounding it, to the satisfaction of the City Administrator. If the permittee does not remove the structure and/or return the street area to a condition satisfactory to the City Administrator, the City Administrator may do so, and the permittee will be personally liable to the City for any and all costs of dismantling the structure and reconstructing the street area. The costs of removal and reconstruction will become a lien upon the abutting property until paid by the permittee.
Ask a question about Portland law
Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.