17.93.030 Application Procedure and Fees.
(Amended by Ordinance 192140, effective March 6, 2026.)
The applicant must conform to the following procedure in applying to rename a City street:
A. The applicant must submit evidence to the City Traffic Engineer that the street renaming proposal complies with Subsections 17.93.010 A.2. and A.3. and Subsections 17.93.020 B. and C. If the City Traffic Engineer determines the submittal does not comply with these sections, the applicant will be so advised and the City will take no further action. If the submittal complies with the above-referenced sections, the City Traffic Engineer will issue the application materials described in Subsection B.
B. The applicant must obtain from the City Traffic Engineer:
1. official petition forms;
2. instructions as to fees and required procedures; and
3. the application form.
C. The applicant must, after filing a completed City Traffic Engineer’s application form and paying any applicable fees:
1. Obtain a minimum of 2,500 signatures in support of the proposal from legal residents of the City at large or signatures of at least 75 percent of the abutting property owners along the street proposed for renaming on the petition forms supplied by the City Traffic Engineer.
2. Make a good faith effort to obtain a letter of concurrence to the proposed street renaming from the honoree’s surviving spouse, children, or parents, in that order. The City Traffic Engineer may accept registered mail receipts and copies of all letters as evidence of compliance with this provision.
3. Provide to the City Traffic Engineer supporting information including a complete biography of the proposed honoree with references of substantiation, honors received, contributions to the national and/or local community, et cetera, which will be reviewed by a historian panel appointed pursuant to Subsection 17.93.040 A. This submission must contain sufficient information to allow the historian panel to accurately assess the appropriateness of renaming a street after the proposed honoree.
D. The applicant will have 180 calendar days to complete and submit the information required by Subsection C. to the City Traffic Engineer’s office. If the completed application has not been submitted to the City Traffic Engineer within 180 calendar days after the application has been received by the applicant, the application will be invalid. No time extension may be granted. At the time of submission, the City Traffic Engineer may check the applicant’s application and accept it only if it is complete and appears to comply with the requirements of Sections 17.93.010 through 17.93.030.
1. If the City Traffic Engineer accepts the submission, the applicant must make a fee deposit to cover the full cost of printing and mailing postcards and public notices as determined by the City Administrator. The minimum fee deposit will be as established in the Transportation Fee Schedule if the street proposed for renaming is ten city blocks (one-half mile) or less in length. If the street proposed for renaming is more than ten city blocks (one-half mile), the minimum deposit will be as established in the Transportation Fee Schedule. The City Administrator will refund any unused portion of the deposit to the applicant or the applicant may be required to pay for any cost of printing, mailings, and public notices in excess of the fee deposit.
Ask a question about Portland law
Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.