For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 21.30.250 — Location of Meters Inside City

Portland City Code (non-zoning titles; Title 33 separately); partial · Portland City Code § 21.30.250

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/c35ca1d9-6bc4-4dd0-a8be-0191763cbf36

21.30.250 Location of Meters Inside City.

A. Within the City, the water meter must be located in or adjacent to the street except where a City main is already located in an easement upon private property. For service within easements, the Water Bureau may allow a water meter to be located on or adjacent to an existing line if the necessary easements for the meter installation are approved by the City Administrator. If a service from an easement requires a premises isolation backflow assembly, such protection must be installed immediately adjacent to the service connection on the private property side of the easement, at the easement line, and on the centerline of the City’s water service as it exits the easement.

B. Unless this requirement is waived in a particular circumstance at the discretion of the City Administrator, and except as provided in Section 21.30.260, all water meters must be outside any buildings on the premises and must be safely accessible by Water Bureau staff 24 hours a day for reading, testing, servicing or replacement.

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.