§ 24.85.060 — Required Seismic Evaluation
Portland City Code (non-zoning titles; Title 33 separately); partial · Portland City Code § 24.85.060
Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/4e700f8b-af8e-4fd6-8e12-7ba5f55fd34d
24.85.060 Required Seismic Evaluation.
(Amended by Ordinance 192095, effective October 24, 2025.)
The requirements of this section do not apply until January 1, 2029. On or after January 1, 2029, when an alteration for which a building permit is required has a value (not including costs of mechanical, electrical, plumbing, permanent equipment, painting, fire extinguishing systems, site improvements, eco-roofs and finish works) of more than $175,000, an ASCE 41 evaluation is required. This value of $175,000 will be modified each year after 2004 by the percent change in the R.S Means Construction Index for Portland on file with Portland Permitting & Development. A letter of intent to have an ASCE 41 evaluation performed may be submitted along with the permit application. The evaluation must be completed before any future permits will be issued. The following are exempt from this requirement:
A. Buildings constructed or renovated to seismic zone 2, 2b or 3 under a permit issued after January 1, 1974.
B. Detached One- and two-family dwellings, and their accessory structures.
C. Single story, light frame metal and light wood frame buildings, not more than 20 feet in height from the top surface of the lowest floor to the highest interior overhead finish and ground area of 4,000 square feet or less.
A previously prepared seismic study may be submitted for consideration by the City Administrator as equivalent to an ASCE 41 evaluation.
Ask a question about Portland law
Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.
