For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25.10.030 — Construction, Use, and Limitations

Portland City Code (non-zoning titles; Title 33 separately); partial · Portland City Code § 25.10.030

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/67ba4176-4b44-4f78-8574-fc65525bb2ca

25.10.030 Construction, Use, and Limitations.

Where authorized by the City Administrator, dry wells or other underground injection controls may be used in compliance with the provisions outlined in this Title and in accordance with the specifications set forth in corresponding code guides developed by Portland Permitting & Development. In cases where deemed necessary by the City Administrator, soil percolation tests may be required to assess the suitability of the site. The installation of pre-manufactured dry wells or other underground injection controls composed of concrete, High-Density Polyethylene (HDPE), or similar materials must adhere strictly to the manufacturer's instructions. Stormwater infiltration systems may be utilized if installed in strict accordance with the manufacturer's specified installation instructions. Alternative stormwater facility options when designed and stamped by a registered design professional may be considered and approved by the City Administrator. The City Administrator will conduct a thorough examination of, or cause to be examined, the plans and specifications submitted, ensuring compliance with the provisions set forth in this Title and all applicable laws and regulations of the City.

Installation of dry wells and other underground injection controls must meet the requirements of Oregon DEQ.

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.