For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 26.11.020 — Funding Requirements

Portland City Code (non-zoning titles; Title 33 separately); partial · Portland City Code § 26.11.020

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/cd432cbe-81c4-4c72-9094-e4fb8215b39e

26.11.020 Funding Requirements.

When the City funds, in whole or in part, the installation of an electric vehicle charging system to be located on the customer's side of the meter, it will require as a condition of the funding that:

A. The electric vehicle charging system be installed by a contractor or contractors who hold all licenses legally required to perform the electrical installation work;

B. The electric vehicle charging system be installed by a contractor or contractors who hold an Electric Vehicle Infrastructure Training Program or equivalent training program certification; and

C. One or more electricians who hold an Electric Vehicle Infrastructure Training Program or equivalent training program certification supervise or participate in the installation work for the periods during which electrical installation work is being performed.

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.