§ 200.005 — Definitions
Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 200.005
Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/59bebcc6-74d9-44da-b377-a67e6c58bfcc
Sec. 200.005. - Definitions.
The following words, terms and phrases, when used in this chapter, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Adequate facilities means major and minor facilities that are in place and meet the master plan requirement for service. Area facility plan means a public facility plan establishing minor facilities for a defined geographic area that was not fully planned in the applicable master plan. Complex means a group of structures, or a single structure containing multiple businesses that is functionally or conceptually integrated, regardless of the ownership of the development or underlying land. Developer contributions means voluntary and non-reimbursable funding by a private developer of all or a portion of the costs of construction of a major or minor facility, intended to reduce the public costs of a potential new urban service area expansion area. Development means: (a) The subdivision of land; (b) The construction of a planned unit development; (c) The establishment of a mobile home park; (d) The construction or structural alteration of a building or structure which will result in increased usage of a public facility; provided, however, that any such construction or structural alteration undertaken in connection with one of the following shall not be considered development for purposes of this chapter: (1) Construction or alteration of any building or structure in the following land use classifications under SRC chapter 400: (A) Single family; (B) Two family; (C) Basic utilities; (D) Wireless communication facilities. (2) Any use established and conducted by the City. (3) Construction or structural alteration of a building or structure to comply with existing state or local health, sanitary, or safety code specifications that are solely necessary to assure safe living conditions. (4) Construction or structural alteration undertaken for purposes of adaptive reuse under SRC chapter 230, provided that such construction or structural alteration is for the purposes of adaptive reuse only. (5) Construction or structural alteration of any building or structure in a complex, provided there is no cumulative increase in total floor area of all buildings and structures within the complex that exceeds 60 percent of the total floor area within any period of three consecutive years. Example: Construction or alteration would not be exempt from this chapter if the total floor area of existing buildings and structures in the complex = 100,000 square feet and cumulative new floor area = 61,000 square feet in the years 2010, 2011, and 2012. For the purposes of this subsection, the percent increase shall be based on the building square footage before the construction or structural alteration is started, or if the building or structure has been damaged and is being restored, before the damage occurred. Fair market value means the appraised value, as of the date of the Urban Growth Preliminary Declaration, of land reserved for conveyance to the City for public park use. The appraisal shall be procured by the City at the developer's expense, and will be an allowable cost for reimbursement to the developer. Fully committed means all major and minor facilities required to adequately serve a defined geographic area are provided for in one or more of the following: (a) The City's capital construction budget or Capital Improvement Program, but including any major and minor facilities that will be funded by a general obligation bond or other mechanism that requires a vote of the electors of the City; (b) An improvement agreement secured by performance guarantees executed prior to approval of construction plans or the expenditure of any matching public funds, if any, by the City; (c) A project in an urban renewal plan; (d) Commitment to fund and build the major or minor facility within five years of the date of the development will commence has been made by some entity other than the City, including, but not limited to, the State. Improvement agreement means an agreement between a developer and the City that implements the conditions of a land use approval. In place means that a required facility has been constructed and is in service. Major facility means one or more of the following public facilities: an arterial or collector street as shown in the Salem Transportation System Plan; a sewer collection line or sewer pump station shown in the Salem Area Wastewater Management Master Plan; water distribution line, water pump station, or a water reservoir shown in the Water System Master Plan; a storm drainage facility shown in the Stormwater Master Plan; or a park shown in the Comprehensive Park System Master Plan. Master plans means, collectively, the following: (a) Comprehensive Park System Master Plan, adopted May 13, 2013. (b) Salem Area Wastewater Management Master Plan, adopted December 16, 1996, and amended September 23, 2002; February 7, 2005; and April 9, 2007. (c) Salem Transportation System Plan, adopted June 28, 1998, and amended February 14, 2000; May 14, 2001; January 24, 2005; March 28, 2005; April 23, 2007; April 26, 2010; and December 10, 2012 (d) Stormwater Master Plan, adopted September 25, 2000. (e) Water System Master Plan, adopted April 25, 1994, and amended September 23, 1996; October 25, 1999; February 7, 2005; and July 9, 2007. Minor facility means a public facility other than a major facility. Planned means the nature, capacity and location of the major or minor facility have been specifically designated in a master plan. Public facility means infrastructure to provide transportation, water, wastewater, stormwater or parks for the benefit of the general public. Required facilities means all major and minor facilities necessary to provide adequate water, sewer, storm drainage, transportation and parks for a development for which a Urban Growth Area Preliminary Declaration must be obtained, and including any major facility which falls within 260 feet of the boundaries of the development, measured at right angles to the length of the boundary of the development site. Secondary benefit value means the dollar value of a public facility that will provide a new or improved service to already developed areas either in or out of the existing urban service area. Urban growth area means that territory of the City lying between the urban service area and the urban growth boundary. Urban service area means that territory of the City where all required facilities are in place or fully committed, and designated as such pursuant to SRC 200.010.
(Prior Code, § 200.005; Ord. No. 31-13)
Ask a question about Salem law
Corpus searches the Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.
