§ 43.225 — Street occupancy
Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 43.225
Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/e0421829-f80c-44f7-add4-9e5171c0068b
Sec. 43.225. - Street occupancy.
(a) Grantee shall utilize existing telephone and power poles, conduits and other facilities with written permission by these franchisees, and shall not construct or install any new, different, or additional poles, conduits, or other facilities on public property until written approval of the grantor is obtained. Publicly owned poles such as traffic signals or street light poles, may not be used. However, no location of any pole or wire holding structure of the grantee shall be a vested interest and such poles or structure shall be removed or modified by the grantee at its own expense whenever the grantor determines that the public convenience would be enhanced thereby. (b) Grantee shall notify the grantor at least ten days prior to the intention of the grantee to commence any construction in any streets. The grantor shall cooperate with the grantee in granting any permits required, providing such grant and subsequent construction by the grantee shall not unduly interfere with the use of such streets and that proposed construction shall be done in accordance with the pertinent provisions of the ordinances of the grantor. (c) All transmission lines, equipment and structures shall be so installed and located as to cause minimum interference with the rights and reasonable convenience of property owners and, at all times, shall be kept and maintained in a safe, adequate and substantial condition, and in good order and repair. The grantee shall, at all times, employ ordinary care and shall install and maintain in use commonly accepted methods and devices for preventing failures and accidents which are likely to cause damage, injuries, or nuisances to the public. Suitable barricades, flags, lights, flares or other devices shall be used at such times and places as are reasonably required for the safety of all members of the public. Any poles or other fixtures placed in any public way by the grantee shall be placed in such a manner as not to interfere with the usual travel on such public way. (d) Grantee shall, at its own expense, and in a manner approved by the grantor, restore to pre-existing conditions any damage or disturbance caused to the public way as a result of its operations or construction on its behalf. (e) Whenever, in case of fire or other disaster, it becomes necessary in the judgment of the grantor to remove any of the grantee's facilities, no charge shall be made by the grantee against the grantor for restoration and repair. (f) Grantee shall have the authority to trim trees on public property at its own expense as may be necessary to protect its wires and facilities, including its microwave path, subject to approval of the grantor. Trimming of trees on private property shall require written consent of the property owner in non-emergencies. (g) The grantee, at its expenses, shall protect, support, temporarily disconnect, relocate, or remove any property of grantee when, in the opinion of the grantor, the same is required by reason of traffic conditions, public safety, street vacation, freeway or street grade, separation or realignment, installation of sewers, drains, water pipes, power line, signal line, transportation facilities, tracks or any other types of structure or improvements by governmental agencies whether acting in a governmental capacity, or any other structure or public improvement, including, but not limited to, movement of buildings, redevelopment, or any general program under which the grantor shall undertake to cause any such properties to be located beneath the surface of the ground. Nothing hereunder shall be deemed a taking of the property of grantee and grantee shall be entitled to no surcharge by reason of anything hereunder. (h) Upon failure of grantee to commence, pursue or complete any work required by law or by the provisions of this chapter to be done in any street, within the time prescribed and to the satisfaction of the grantor, the grantor may, at its option, cause such work to be done and the grantee shall pay to the grantor the cost thereof in the itemized amounts reported by the grantor to grantee within 30 days after receipt of such itemized report. (i) The grantee shall make no paving cuts or curb cuts unless absolutely necessary, and only after written permission has been given by the grantor and all necessary permits have been obtained. (j) The grantor reserves the right to require conduit under special conditions as required by the Director.
(Prior Code, § 43.225; Ord. No. 38-87)
Ask a question about Salem law
Corpus searches the Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.
