§ 600.025 — Development standards
Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 600.025
Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/3360732f-daf7-4132-94ef-2be2f54397ac
Sec. 600.025. - Development standards.
Development within the Willamette Greenway Overlay Zone must comply with the development standards applicable in the underlying zone and the development standards set forth in this section. The development standards in this section are in addition to, and not in lieu of, all other applicable development standards in the underlying zone. Where the development standards in this section conflict with the development standards applicable in the underlying zone or any other overlay zone, the development standards in this section shall be the applicable development standard. (a) General standards. (1) Existing predominant topographical features of the bank and escarpment shall be preserved and maintained, with the exception of disturbance necessary for: (A) The construction or establishment of a water-related, water-dependent, or river-oriented use or activity; and (B) Measures necessary to reduce existing or potential bank and escarpment erosion, landslides, or flood hazard conditions. (2) The slope, soil characteristics, and other physiographic conditions existing within the land area between the ordinary low water line and the Willamette Greenway Boundary shall be considered to assure that the proposed intensification, development, or change of use will not adversely affect the stability of the land area. (3) The hydraulic effect of the Willamette River on the bank shall be considered in the design of any proposed intensification, development, or change of use. (4) The hydraulic and flood carrying capacity of the river shall be considered in the design of any proposed intensification, development, or change of use. (5) Impact on the riparian buffer resulting from the proposed intensification, development, or change in use shall be minimized. (b) Landscaping. (1) Landscaping shall conserve, or if disturbed by the development activity restore to the greatest extent possible, vegetative cover within the Willamette Greenway Boundary. Landscaping is not required where it would significantly interfere with a water-dependent or water-related use or activity. (2) Native vegetation removed from the riparian buffer shall be replaced with native vegetation which is compatible with and enhances the functions of the riparian buffer. (3) Trees and shrubs shall be provided as follows: (A) A minimum of one tree shall be provided for every 20 feet of river frontage. (B) A minimum of one shrub shall be provided for every two feet of river frontage. (C) All trees and shrubs shall be planted within and generally riverward of the Willamette Greenway Boundary. (D) The planting standards included under subsections (b)(3)(A) and (B) of this section are for calculation purposes only, and do not require linear planting. Groupings of trees, shrubs, or both are encouraged, particularly along the riverbank. (4) Areas which are not paved or revetted shall be planted with living ground cover. (c) Water quality. (1) Water quality development standards, generally. In order to protect and improve water quality within the Willamette Greenway Boundary, a riparian buffer, as set forth in subsection (c)(2) of this section, along with one or more of the mitigation measures, as set forth in subsection (c)(3) of this section, shall be established. (2) Riparian buffer. A riparian buffer shall be established as set forth in this subsection. (A) Boundary. The applicant shall establish the riparian buffer boundary by choosing one of the following two methods: (i) Method 1. Method 1 provides a relatively simple methodology for establishing a uniform riparian buffer boundary based on three bank slope measurements. The three bank slope measurements shall be taken along the Willamette River, one at each property line and one located at the center of the property, as determined by measuring the property line parallel to the Willamette River, and dividing it by two. Example: A 150-foot property line adjoining the Willamette River would result in bank slope measurements starting at the first property line, the 75-foot mark, and then the other property line. The riparian buffer boundary pursuant to Method 1 shall be established as set forth in Table 600-1. TABLE 600-1. RIPARIAN BUFFER METHOD 1 Bank Slope Measurement | Riparian Buffer(1), (2) | Limitations & Qualifications All three bank slope measurements less than 25% | 50 ft. | If the floodway is wider than the required 50-ft. riparian buffer, the riparian buffer shall extend to the floodway boundary. Any of the three bank slope measurements equal to or greater than 25% | 75 ft. | If the floodway is wider than the required 75-ft. riparian buffer, the riparian buffer shall extend to the floodway boundary. (1) See Figure 600-1 for riparian buffer where all three bank slope measurements are less than 25 percent. (2) See Figure 600-2 for riparian buffer where any of the three bank slope measurements is equal to or greater than 25 percent. (ii) Method 2. Method 2 enables properties with varying bank slopes to establish a varying riparian buffer boundary reflecting site conditions and maximizing the area available for development. Bank slope measurements shall be taken along the Willamette River spaced at intervals no greater than 20 feet along ordinary high water line. The riparian buffer boundary pursuant to Method 2 shall be established as set forth in Table 600-2. TABLE 600-2. RIPARIAN BUFFER METHOD 2 Bank Slope Measurement | Riparian Buffer(1), (2) | Limitations & Qualifications Bank slope measurement less than 25% | 50 ft. | If the floodway is wider than the required 50-ft. riparian buffer, the riparian buffer shall extend to the floodway boundary. Bank slope measurement equal to or greater than 25% | 75 ft. | If the floodway is wider than the required 75-ft. riparian buffer, the riparian buffer shall extend to the floodway boundary. (1) See Figure 600-1 for riparian buffer where a bank slope measurement is less than 25 percent. (2) See Figure 600-2 for riparian buffer where a bank slope measurement is equal to or greater than 25 percent. (B) When the riparian buffer measures more than 100 feet or 125 feet, depending on the bank slope, from the ordinary high water line, the property shall receive credit for meeting the wider riparian buffer mitigation measure under SRC 600.025(c)(3)(A). FIGURE 600-1. RIPARIAN BUFFER: BANK SLOPES LESS THAN 25 PERCENT [image omitted; see the official code] FIGURE 600-2. RIPARIAN BUFFER: BANK SLOPES EQUAL TO OR GREATER THAN 25 PERCENT [image omitted; see the official code] (3) Mitigation measures. A mitigation plan, to mitigate the effects of any intensification, development, or change of use, shall be provided based on one of the following mitigation measures: (A) Wider riparian buffer. A riparian buffer wider than riparian buffer required under subsection (c)(2) of this section may be provided as a mitigation measure. (i) Boundary. The boundary of the wider riparian buffer is based upon the width of the riparian buffer required under subsection (c)(2) of this section, and shall be provided as set forth in Table 600-3. TABLE 600-3. WIDER RIPARIAN BUFFER Riparian Buffer (Required under SRC 600.025(c)(2)) | Wider Riparian Buffer | Limitations & Qualifications 50 ft. | 100 ft. | If the floodway is wider than the 100-ft. wider riparian buffer, the wider riparian buffer shall extend to the floodway boundary. 75 ft. | 125 ft. | If the floodway is wider than the 125-ft. wider riparian buffer, the wider riparian buffer shall extend to the floodway boundary. (B) Riparian buffer enhancement. Enhancement in the riparian buffer may be provided as a mitigation measure. Enhancement shall comply with the following standards: (i) Enhancement shall be provided at a ratio of 0.25:1, where 0.25 represents enhancement area and 1 represents development area. (ii) Enhancement shall comply with the Willamette Greenway Riparian Buffer Enhancement Guide. (iii) All plants shall be selected from the City of Salem Native Plant List and shall be of a species designated appropriate for each riparian section. (iv) Where enhancement includes removal of impervious surfaces or previous fill, exposed soils shall be replanted with a mixture of ground cover, shrubs, and trees. (v) All plantings shall occur within one year of the permit date unless another date is approved in the greenway development permit. (C) Off-street parking stormwater quantity and quality. Parking lot construction which gives consideration to the quantity and quality of stormwater generated by any new or expanded impervious surface area may be provided as a mitigation measure when such parking lot construction complies with the following standards: (i) On-site stormwater detention shall be provided in accordance with the City's Stormwater Management Design Standards. On-site retention facilities, with no direct discharge into the Willamette River, shall be used to the maximum extent practicable. (ii) Any new parking lot that creates more than 500 square feet of impervious surface, or any parking lot that redevelops more than 500 square feet of impervious surface, may use parking area landscaping required under SRC chapter 806 to manage stormwater from the new or redeveloped area. If such landscaped area does not allow for adequate sizing of the stormwater facilities, the applicant may choose one of following options: (aa) Increase the landscape area within the parking lot to accommodate the required stormwater facility size; or (bb) Use additional stormwater management facilities, which may include non-landscaped approaches, to obtain the required level of treatment. (iii) Stormwater treatment facilities shall be designed in accordance with the City's Stormwater Management Design Standards, or in the absence of specific design criteria therein, in accordance with generally accepted standards in the industry. All treatment facilities shall be designed to remove pollutants, including, but not limited to, principally settleable solids, total suspended solids, oil, and grease, to the maximum extent practicable. Any of the following approaches may be used to remove pollutants: (aa) Landscape planters; (bb) Trees; (cc) Landscape vegetated or grassy swales; (dd) Vegetative filters; (ee) Landscape filters; (ff) Sand filters; (gg) Permeable or porous pavement; (hh) Soakage trenches; (ii) Infiltration trenches; (jj) Proprietary engineered devices approved by the Director, when supporting technical information from the manufacturer is provided including hydraulic design criteria, particulate removal efficiency, and operations and maintenance requirements and schedule; or (kk) Other site-specific measures sufficient to remove pollutants to the maximum extent practicable, as approved by the Director. (iv) All approved stormwater quantity and quality facilities shall be carefully and properly designed and subsequently operated and maintained so as to avoid groundwater contamination, erosion and off-site sediment transport, landslide hazards, and other similar concerns identified in the City's Stormwater Management Design Standards. (D) Tree planting for stormwater management. Tree planting for stormwater management to intercept rainfall, detain flows, dissipate the energy of runoff, provide shade over large areas of impervious surface, reduce heat pavement gain, and minimize heat absorbed by stormwater may be provided as a mitigation measure. Tree planting for stormwater management shall comply with the following standards: (i) Trees shall be planted and maintained within or adjacent to impervious surface areas to ensure that, within 15 years after issuance of the greenway development permit, at least 50 percent of the impervious surface area will be covered by tree canopy. Canopy cover shall be calculated by using 75 percent of the species' expected mature spread, based on HORTUS III or another horticulture reference approved by the Director. (ii) Trees shall be selected from a list of species, established by the Director, that provide adequate shade over impervious surfaces. (iii) Existing trees may be used as part of this mitigation measure when such trees have their canopy within 20 feet of the impervious surface. (iv) Newly planted trees shall have a minimum caliper of 1.5 inches, and shall be planted within 30 feet of impervious surfaces. (v) As used in this subsection (D), the term "impervious surface" does not include: (aa) Truck loading areas in front of overhead doors; (bb) Truck maneuvering and parking areas unconnected to and exclusive of vehicle parking; (cc) Impervious surfaces not used for vehicle parking, driving, or maneuvering, provided such areas are inaccessible to vehicles by use of barriers such as bollards, curbs, or fencing; (dd) Display, sales, service, and vehicle storage areas for automobile dealerships; and (ee) Existing impervious surface areas. (E) Alternative paving techniques. Unless precluded by site-specific conditions as determined by the Director, off-street parking areas of less than 500 square feet may use alternative paving techniques to reduce the total amount of effective impervious surface area present on the site as a mitigation measure. Alternative paving techniques shall comply with the following standards: (i) Alternative paving techniques shall consist of a semi-pervious surface, such as permeable or porous pavement, which reduces stormwater surface runoff to the maximum extent practicable. (ii) The design and construction of parking areas utilizing alternative paving techniques shall be in accordance with the City's Stormwater Management Design Standards, or in the absence of specific design criteria therein, in accordance with generally accepted standards in the industry. (iii) Semi-pervious materials shall be structurally adequate for the proposed use or activity. (d) Structures. All buildings, structures, and exterior mechanical equipment shall be screened, colored, or surfaced so as to blend with the riparian area. Colors shall be natural earth or leaf tones. Surfaces shall be non-reflective. Screening shall be sight-obscuring. (e) Lighting. (1) Lighting shall not flash, if visible from the Willamette River, and shall not be focused or oriented onto the surface of the Willamette River. (2) The maximum aggregate intensity of all lighting falling on the surface of the Willamette River shall not exceed one-tenth foot-candle per square foot. (3) No red or green lights shall be visible from the Willamette River. (4) Notwithstanding any other provision of this section, lighting necessary for safety of pedestrians may be provided for public or private walkways. (f) Screening of parking and unenclosed storage areas. Parking, loading, and unenclosed storage areas shall be screened from the Willamette River and from adjacent properties by: (1) A sight-obscuring berm; or (2) A sight-obscuring hedge, a minimum of six feet in height at maturity. Hedges shall, when planted, be no less than three feet in height and shall be of a species capable of attaining a minimum height of six feet within three years after planting. (g) View corridors. (1) Whenever right-of-way located wholly or partially within the Willamette Greenway Overlay Zone is vacated, the City shall retain a scenic easement or other equivalent interest in the area vacated to provide visual access to the Willamette River across the entire width of the vacated right-of-way, or for a width of 30 feet, whichever is less, and along the entire length of the vacated right-of-way. Subject to approval by the Council, the abutting property owner, or owners, may substitute an area with equivalent size and dimensions under like restriction, if the substitute area provides comparable or better visual access to the Willamette River. (2) The area covered by the scenic easement or other equivalent interest shall be limited to use for walkways, bicycle paths, and berms or landscaped areas; provided, however, that within an area of 7.5 feet on either side of the centerline of the scenic easement or other equivalent interest, landscaping and berms shall not exceed three feet in height. (h) Public access. Where practical, public access to and along the Willamette River should be provided by easement, dedicated right-of-way, or other appropriate legal means.
(Prior Code, § 600.025; Ord. No. 31-13)
Ask a question about Salem law
Corpus searches the Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.
