§ 71.095 — Flow control facilities
Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 71.095
Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/26bc2afe-aae5-4343-b00d-db6674a5a194
Sec. 71.095. - Flow control facilities.
(a) Applicability. (1) Except as provided in subsection (a)(2) of this section, all large projects not discharging directly into a flow control exemption area shall be provided with flow control facilities that comply with this section. (2) The following projects are exempt from the requirements of this section: (A) Maintenance, repair, or installation of underground or overhead utility facilities that includes replacing the ground surface with in-kind material or materials with similar runoff characteristics. By way of illustration, but not of limitation, this includes maintenance, repair, and installation of pipes, conduits, and vaults. (B) The following road maintenance practices: (i) Pothole and square cut patching; (ii) Overlaying existing asphalt or concrete or brick pavement with asphalt or concrete without expanding the area of coverage; (iii) Shoulder grading; (iv) Reshaping or re-grading drainage ditches; (v) Crack sealing; (vi) Replacing existing impervious surface down to earth material; and (vii) Vegetation maintenance. (C) Projects in the right-of-way under the control of another governmental body, if: (i) The governmental body uses best management practices consistent with that government body's own stormwater management program and NPDES permit; and (ii) The best management practices are at least as stringent as those required by this chapter and rules pursuant thereto. (b) Design. (1) Flow control facilities shall be designed and installed to receive all drainage water from that portion of the site being developed and for the drainage water discharging to the flow control facility from other areas, including existing impervious surfaces and off-site areas, when the other drainage water cannot be separated or bypassed. By way of illustration, but not of limitation, as used in this section, development includes all new impervious surfaces, all replaced impervious surfaces, all disturbed land areas, and any flows from dewatering. (2) Green stormwater infrastructure shall be used to the maximum extent feasible. (3) The Director may reduce the total area of the site requiring flow control upon a consideration of the following: (A) Areas retained in a natural, undisturbed state. (B) Disturbed land areas within the site that have had soils amended. (4) The Director may allow construction of a flow control facility at a location other than the site if: (A) The Director has determined that it is in the public interest to construct a flow control facility at a location other than the site. This determination shall consider the feasibility of constructing the flow control facility on the site; the costs associated with construction, operations, and maintenance of the flow control facility; and the benefits provided by the flow control facility in terms of accomplishing the purposes of this chapter; and (B) The flow control facility constructed at a location other than the site will mitigate similar impacts that have been identified as a consequence of the project. (c) Flow control facility performance standard. (1) The post-development peak runoff rate from one- half the two-year, 24-hour design storm event must be equal to or less than the predevelopment peak runoff rate for one-half the two-year, 24- hour design storm event; (2) The post-development peak runoff rate from the ten-year, 24-hour design storm event must be equal to or less than the predevelopment peak runoff rate from the ten-year, 24-hour design storm event; and (3) The post-development peak runoff rate from the 25-year, 24-hour design storm event must be equal to or less than the predevelopment peak runoff rate from the 25-year, 24-hour design storm event; and (4) The post-development peak runoff rate from the 100-year, 24-hour design storm event must be equal to or less than the predevelopment peak runoff rate from the 100-year, 24-hour design storm event.
(Prior Code, § 71.095; Ord. No. 28-13; Ord. No. 8-20, § 1(Exh. A), 9-28-2020; Ord. No. 9-24, § 1(Exh. A), 9-23-2024)
Ask a question about Salem law
Corpus searches the Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.
