§ 78.192 — Deferral of sidewalk construction

Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 78.192

Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/44d6d43c-1d8c-4752-82e5-792eef871eaf

Sec. 78.192. - Deferral of sidewalk construction.

(a) A property owner may apply to the Director to enter into a deferral agreement with the City to defer the obligation to construct sidewalks as required by SRC 78.180 or required as a condition of land use approval under the following circumstances: (1) In the case of all property other than industrial: (A) The location of the sidewalk is not on a designated collector or arterial street in the Salem Transportation Systems Plan; and (B) Less than one-half of the required sidewalks on that side of the block are already constructed. (2) In the case of industrial property: (A) The frontage considered for deferral is not on a major pedestrian route to a school, shopping center, park, church, or other pedestrian traffic generator; (B) The deferral of the sidewalk construction does not pose a threat to the welfare and safety of the public based upon a review of the pedestrian/vehicular traffic, the width and condition of the street, and of the on-street parking; and (C) There is an adequate combination of pedestrian, bike and transit facilities for employees to reach the property safely without using a vehicle, except that the Director may waive this condition if the property owner can show that imposing this condition would create a hardship. (b) Whenever a sidewalk construction has been deferred, the property owner shall, unless otherwise specified in the deferral agreement: (1) Grade and slope the area to the future sidewalk grade; (2) Avoid planting trees in the sidewalk area, or building fences, retaining walls, steps, or other impediments to the future sidewalk; (3) Note on the plans for the development that a deferment has been granted but that sidewalk construction may be ordered by the Council at any time; and (4) Record a copy of the deferral agreement in the deed records of the appropriate county. (c) Sidewalk construction, which has been deferred pursuant to subsection (a) or (b) of this section, may be initiated at any time by the Director or by resolution of the Council.

(Prior Code, § 78.192; Ord. No. 84-79; Ord. No. 127-84; Ord. No. 17-92; Ord. No. 51-96; Ord. No. 99-07)