For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 270-31 — Building fees

Code of the City of Allentown, Pennsylvania (code date 2026-10-07) · Allentown Code § 270-31

Corpus is an independent public-information project, not the official City of Allentown website. Stable reference: corpuslaw.us/code/54f29111-af77-48db-8c22-33a76c8f89d1

§ 270-31: Building fees.

Building fees shall apply to the construction, alteration, movement, enlargement, replacement, repair, equipment, use and occupancy, location, maintenance, removal and demolition of every building or structure, and any electrical, mechanical, plumbing, fire suppression and alarm systems, signs, or tanks connected or attached to, or detached from, such buildings, structures, or parcels. The Building Code Official shall have the right to verify or correct the estimated value of any proposed permit valuations. A. Building permit fees. The fees that will be applied to all residential and commercial permit applications. (1) Application fee. A nonrefundable application fee shall be payable upon submission of all permits as follows: (a) Residential: $50. (b) Commercial: $100. (2) State-mandated Uniform Construction Code (UCC) permit fee. A fee of $4.50, or as determined by, the State of Pennsylvania, will be included on all permit applications. (3) Commercial. For the plan review and inspection of all commercial construction projects including new construction, additions, alterations, repairs, demolition, pools, fences, retaining walls, signs, solar panels, tanks, electrical, mechanical, plumbing, fire systems and accessory structures. The fee shall be the greater of $75 or 1.5% of the total cost of work including materials and labor of all trades. (4) Residential. For the plan review and inspection of all residential construction projects including new construction, additions, alterations, repairs, demolition, pools, fences, retaining walls, signs, solar panels, tanks, electrical, mechanical, plumbing, fire systems and accessory structures. The fee shall be the greater of $50 or 1% of the total cost of work including materials and labor of all trades. (5) Expedited plan review fee (10 working days): an additional $0.05 per square foot. *The Bureau of Building Standards and Safety reserves the right to verify or correct the estimated value of any proposed project costs based on the International Code Council's Building Data Valuation or other means. **The Building Code Official reserves the right to reject any plans that do not show in detail that the work will conform to the Uniform Construction Code. ***Applications approved for issuance are not valid permits until the required permit fee has been remitted. A permit becomes invalid unless the authorized construction work begins within 180 days after the permit's issuance. A permit shall also become invalid if the authorized construction work permit is suspended or abandoned for 180 days after the work has commenced. A permit holder may submit a written request for an extension of time to commence construction for just cause. The Building Code Official may grant extensions of time to commence construction in writing. A permit may be valid for no more than five years from its issue date. B. Certificate of occupancy (CO). (1) Commercial. A building, structure or facility may not be used or occupied without a certificate of occupancy issued by a building code official. The fees for commercial certificate of occupancy are calculated within the cost of the building permit. (2) Residential. A residential building may not be used or occupied without a certificate of occupancy issued by a building code official. The fees for residential certificate of occupancy are calculated within the cost of the building permit. (3) Change of use/occupancy (ONLY). Changes in use or occupancy including a change of ownership or address wherein no alterations are required to meet code compliance will be charged the minimum standard building permit fees. (4) Temporary certificate of occupancy (TCO). A TCO may only be issued by the Building Code Official (BCO) when all fire alarm, suppression systems, fire-rated assemblies and other life and safety components have been completed and approved. (a) Commercial TCO: $350. (b) Residential TCO: $200. C. Modular buildings and construction trailers. A building permit shall be secured for the placement of a prefabricated structure at the new location in accordance with the permit fee schedule established in this article. D. Appeals. (1) Housing Appeals Board Fees shall be $100 per application for one- and two-family residential, and $200 for all others. (2) Building Appeals Board fees shall be $250 for one- and two-family residential, and $500 for all others. (3) Disruptive Conduct Board of Appeals shall be $100 per application. (4) Nuisance Abatement Board of Appeals shall be $250 per application.

[Amended 12-20-2007 by Ord. No. 14558 ; 12-18-2008 by Ord. No. 14678 ; 4-1-2009 by Ord. No. 14714 ; 12-1-2010 by Ord. No. 14844 ; 8-3-2016 by Ord. No. 15304 ; 12-5-2018 by Ord. No. 15502 ; 6-5-2024 by Ord. No. 16020 ; 4-16-2025 by Ord. No. 16124 ]

Ask a question about Allentown law

Corpus searches the Allentown sections it holds and shows the ones that match, with their citations. Free, no sign-in.