§ 270-9: Restoration.

A. Bond. Pavement Structure | Amount of BondPer Square Yard Concrete foundation(10 inches or more in depth) with any asphalt surface | $170 Concrete foundation(10 inches or less in depth) with any asphalt surface | $165 Cement concrete surface streets7 inches to 9 inches full depth | $155 Bituminous concrete surface with bituminous or stone base | $145 Unimproved surface (graded stone) | $50 (1) The number of square yards of excavation shall be computed to the nearest whole square yard, rounded upward. This will include any pavement that must be removed to enable an overlap of the surface course and base course on the existing subgrade. (2) Minimum fee shall be equal to fee for two square yards. (3) Additional square yards, if required during construction, shall be added to the original square yard computation to obtain an adjusted total. Additional fee shall be based on the adjusted total. (4) The Director of Finance or designee will place collected restoration fees into the General Fund. B. Degradation fees. A rate of fee in dollars per square yard charged for streets constructed, reconstructed or resurfaced within the following number of years prior to issue date of permit. Rates associated with emergency situation or approved exceptions. Pavement Structure | Less Than 1 Year | Less Than 2 Years | Less Than 3 Years | Less Than 4 Years | Less Than 5 Years | 5 to 10 Years Concrete foundation (greater than 10 inches in depth) with any asphalt surface | $170 | $170 | $160 | $150 | $140 | $115 Concrete foundation (less than 10 inches in depth) with any asphalt surface | $165 | $155 | $145 | $130 | $120 | $110 Cement concrete surface streets | $160 | $150 | $140 | $125 | $115 | $105 Bituminous concrete surface with bituminous or stone base | $145 | $130 | $120 | $115 | $105 | $90 Example: Degradation fee for street with bituminous concrete surface and stone base four years old, 10 square yards — 10 square yards at $115 per square yards = $1,150. The number of square yards used in the computation of fees will be based on the nearest whole square yard figure. Minimum fee to be equal to the rate for one square yard. (1) The degradation fee will be waived for openings made on streets maintained by the Pennsylvania Department of Transportation. (2) The number of square yards computed for the degradation fee will be based on the actual size of excavation disregarding any pavement that must be removed to enable an overlap of the surface course on the existing base course. C. Warrants of survey. (1) Any owner of lots or real estate shall make application for a warrant or survey to fix the line and grade for the setting or resetting of curbing, the laying or relaying of sidewalks, crossovers or handicap ramps prior to commencing such work. Where such warrant has been granted, the following fee schedule shall apply: (a) Ten feet or less: no warrant necessary. (b) Eleven feet to 45 feet: $105. (c) Forty-six feet to 120 feet: $205. (d) Each additional foot: $0.55 per foot. (e) Replacement points: $55 per point. (2) If construction has not been completed within the calendar year, a new request of survey shall be obtained. D. Work orders. Prior to commencing the work to construct or reconstruct curbing, sidewalks, crossovers or handicap ramps, a work order authorizing the job shall be obtained for a fee as listed below. If work has not begun within 60 days of issue, a new work order shall be obtained. (1) Curbing only. (a) Zero feet to 45 feet: $50. (b) Forty-six feet to 120 feet: $60. (c) Over 120 feet: $75. (2) Sidewalk only. (a) Zero feet to 225 square feet: $50. (b) Two hundred twenty-six feet to 600 square feet: $60. (c) Over 600 square feet: $75. E. Crossover permits. Prior to construction of any crossover, the owner of the lots or real estate shall make application for a crossover permit. If the application is approved and the permit is issued, all other required permits may be obtained by the owner. (1) Residential crossover: $55. (2) Commercial crossover: $75.

[Amended 3-18-2004 by Ord. No. 14160 ]