For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 490-5 — Connection permits

Code of the City of Allentown, Pennsylvania (code date 2026-10-07) · Allentown Code § 490-5

Corpus is an independent public-information project, not the official City of Allentown website. Stable reference: corpuslaw.us/code/de96a52a-6128-48cf-b543-580232a3294e

§ 490-5: Connection permits.

A. Prior to installing a private sewage disposal facility, or prior to making a residential or commercial connection to the sewerage system, or prior to making a new connection to the sewerage or to a storm sewer system for discharge of industrial waste, the owner of the improved property where such installation or connection is proposed to be made shall apply to the City, in writing, for a permit for such installation or connection. B. Such applications for such installations or connections shall be made on connection permit application forms furnished by the City. Industrial waste connection permit applications shall contain all pertinent data, including but not limited to estimated quantity of flow, character of waste, maximum rate of discharge and proposed pretreatment facilities. C. Permit required. (1) There shall be three classes of building sewer connection permits: (a) For residential services; (b) For commercial services; (c) For service to establishments generating industrial wastes. (2) Fees for sidewalk and street cuts, if applicable, shall be paid in addition to the building sewer connection permit. D. All costs and expenses incident to the installation and connection of the building drain and the building sewer shall be borne by the owner. The owner shall indemnify the City from any loss or damage that may directly or indirectly be occasioned by the installation of the building sewer. E. The applicant for the building sewer connection permit shall notify the City Plumbing Inspector when the building sewer is ready for inspection and connection to the public sewer or the building drain is ready for inspection and connection to the building sewer. The connection shall be made under the supervision of the City Plumbing Inspector or his representative, who shall be notified 24 hours before time for backfilling.

[Amended 2-5-1986 by Ord. No. 12694 ; 6-5-1997 by Ord. No. 13581 ]

Ask a question about Allentown law

Corpus searches the Allentown sections it holds and shows the ones that match, with their citations. Free, no sign-in.