§ 545-25 — Cold weather concreting

Code of the City of Allentown, Pennsylvania (code date 2026-10-07) · Allentown Code § 545-25

Corpus is an independent public-information project, not the official City of Allentown website. Stable reference: corpuslaw.us/code/28644ffd-939b-494e-bde2-4fc600a37419

§ 545-25: Cold weather concreting.

A. Placing of concrete in the public right-of-way will be permitted during cold weather. Types of concrete, covering, insulation and protective coatings will be as specified in the standards and specifications maintained by the Bureau of Engineering. All work must be completed for the construction season as specified by the City Engineer. B. Winter concreting and emergency concrete work will be permitted on a restricted basis. The Bureau of Engineering must be contacted for a special work order and additional requirements. C. All street/gutter excavations for curing set or reset after November 1 will be the responsibility of the permittee to permanently restore. This restoration must be completed before the end of the construction season. D. Where the permittee performs the permanent restoration, the City will advise the contractor of the standards and specifications which are to be followed. City inspectors will be assigned to assure work is in accordance with these regulations and standards. E. Excavations not restored due to the unavailability of material shall be temporarily restored with cold patch material. This excavation shall be maintained by the permittee until material is available for the required permanent restoration.

Ask a question about Allentown law

Corpus searches the Allentown sections it holds and shows the ones that match, with their citations. Free, no sign-in.