For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 597-3 — Permits

Code of the City of Allentown, Pennsylvania (code date 2026-10-07) · Allentown Code § 597-3

Corpus is an independent public-information project, not the official City of Allentown website. Stable reference: corpuslaw.us/code/83982a18-1678-4981-98ee-d11fd7cdac89

§ 597-3: Permits.

A. No person, without first obtaining a permit from the Construction Operations Manager, shall: (1) Prune, spray, plant, remove or cut any shade tree in public lands or a public right-of-way. (2) Attach a guy rope, cable, electric wire or other fixture to any tree, tree guard or support thereof in public lands or a public right-of-way. Temporary attachments shall be allowed if a permit is issued. The temporary attachments shall cause no harm to the tree and there shall be a prescribed timetable for removal of the temporary attachments. (3) Excavate, trench, tunnel, or bore, within the dripline of any tree. Permit applications for such work will contain at a minimum an excavation plan indicating the tree protection zone and maintenance precautions to be used during construction. (4) Install lighting within tree crown. Any permit issued for tree crown lighting shall include a specified time of installation and time of removal, not to exceed one calendar year. B. The Commission shall by regulation set the application procedure, technical requirements and recommend fee schedules for all permits issued under this article and the regulations issued under said article. C. Permit time requirements. (1) A permit shall be secured not less than five days in advance of the time the work is to be done. (2) All work done under any permit issued under this article shall be completed within the time period specified on the permit, not to exceed 60 days from the date issued. (3) The Construction Operations Manager may extend the duration of the permit for good cause shown. (4) The Construction Operations Manager or his designee shall be notified within five days after completion of the work to allow for inspection. D. A person who is refused a permit may make an appeal to the Commission, in writing, within 20 days following the denial. Following a notice and hearing before the Commission, the Commission shall issue a written decision within 20 days. Further appeals of Commission decision shall be taken under the provisions of the Local Agency Law, 2 Pa.C.S.A. § 751 et seq. to the Court of Common Pleas of Lehigh County.

Ask a question about Allentown law

Corpus searches the Allentown sections it holds and shows the ones that match, with their citations. Free, no sign-in.