§ 660-131 — Measurements
Code of the City of Allentown, Pennsylvania (code date 2026-10-07) · Allentown Code § 660-131
Corpus is an independent public-information project, not the official City of Allentown website. Stable reference: corpuslaw.us/code/259e924f-e423-4fe6-b97b-30de2b64f23a
§ 660-131: Measurements.
A. Fractions and rounding generally. When calculations required under this chapter result in fractions, any fractional result of less than one-half of the unit of the regulation is rounded down to the whole number and any fractional result of one-half or more of the regulation unit is rounded up to the whole number. For example, if the maximum regulation is two feet, a measurement of 1.5 feet (or one foot, six inches) is rounded up to two feet and a measurement of 1.25 feet (or one foot, three inches) is rounded down to one foot. If the maximum regulation is in inches, fractions are rounded to the nearest inch. B. Generally parallel and perpendicular. "Generally parallel," when stated related to lot lines or building facades, means less than 45° off the lot line or facade. "Generally perpendicular," when stated related to lot lines or building facades, means more than 45° off the lot line or facade in any direction. C. Lot width. Lot width is the horizontal distance measured along the minimum front setback line between the side lot lines of a lot. If no minimum front setback is required, lot width is measured along the front lot line. D. Lot area. Lot area is measured as the total ground-level surface area contained within the lot lines of a lot. E. Lot frontage. The front lot line of the subject lot must be located along one of the street types designated. See § 660-18J. F. Front streetwall. (1) Definition of "streetwall." The minimum or maximum amount of building facade required along and generally parallel to a front street frontage and built within the build-to zone. See § 660-18J for determining front and side streets (if any) on the lot. Each building type regulates the streetwall as either a minimum percentage or a maximum building width as follows: (a) Measurement: minimum percentage of streetwall. The percentage of front streetwall is calculated as the width of the principal structures, as measured within the front build-to zone, divided by the length of the lot line parallel to the front street, minus the minimum side setbacks or minimum side-street build-to zone setback. See Figure 660(34). (b) Measurement: maximum streetwall. The maximum streetwall is the measurement along all front facades that are generally parallel and facing the lot line, measured from the edge of the facade horizontally to the opposite edge of the facade, intended to limit the width of the building facade along the street. (2) Height. The streetwall or building facade being measured must meet the minimum height required for the building type. See § 660-131M(2). (3) Courtyard and other allowances. Courtyards and other allowances may be listed in the building type regulations as exceptions or allowances. (a) Minimum percentage of streetwall. The length of the courtyard opening or expanded build-to zone may be counted towards percentage of front streetwall where defined in the supplemental regulations for the building type. (b) Maximum streetwall. In cases related to a maximum building width, the courtyard is allowed and does not contribute to the maximum width as written. Figure 660(34) Measuring Front Streetwall [image] G. Setbacks and build-to zones. The following applies to required setbacks and build-to zones. See Article 4 for the building type regulations. (1) Measurement: buildings. Required setbacks and build- to zones are measured from the applicable lot line or specific location referred to in the regulation, to the exterior building walls generally parallel to the subject line. (a) Front and side-street build-to zones and setbacks. Street (front and side-street) setbacks build-to zones are measured from the lot line abutting the edge of the street right-of-way into the lot. Build-to zones include both a minimum setback and maximum setback that the facade of the building must be located within. [1] C street frontages are typically not considered street frontages when they are located at the rear of the parcel, parallel to the front lot line. See § 660-18J. for explanation of frontages. [2] See § 660-18L for regulations requiring a minimum streetscape area. Where the minimum area does not exist, the build-to zone is measured from the edge of the expanded streetscape area into the lot. (b) Interior-side setbacks. Side or interior-side setbacks are measured from the nearest side lot line that does not abut a street. (c) Rear setbacks. Rear setbacks are measured from the rear lot line. (d) Corner lots. On corner lots, the required front or side-street setback must be provided for each street frontage, depending on whether the abutting street is a front or side street. The lot line opposite of the front street is the rear lot line, requiring a rear setback. The lot line generally perpendicular to the front street is the side lot line, requiring a side setback. (e) Double-frontage lots. On double-frontage lots, the required front or side-street setback must be provided for each street frontage, depending on whether the abutting street is a front or side street. Generally applicable regulations apply per § 660-18J and supplemental building regulations for the building type may have additional requirements. (2) Exceptions to build-to zones. Upper-story recessed balcony facades are not required to be located within the build-to zone. (3) Allowed encroachments. Allowed encroachments into setbacks or beyond build-to zones are as follows, unless otherwise established in the building type regulations: (a) Minor building projections in all yards for all building types. Roof overhangs, eaves, chimneys, bays, and other architectural features, such as cornices, may encroach up to 1.5 feet into any yard no closer than one foot from the lot line. (b) Porches in front yards. Porches, stoops, decks, awnings encroaching into setbacks or beyond build-to zones into street yards are regulated in the building siting and supplemental regulations section for each building type. See Article 4. (c) Steps and ramps in front yards. Steps and ramps in front yards may encroach fully into any street yard up to within one foot of any lot line. (d) Porches, stoops, decks in rear and side yards. Open (unenclosed) or screened porches, stoops, awnings, decks, ramps, and steps may encroach into the side or rear yard up to within one foot of any lot line. (4) Setbacks on irregular lots. Setbacks are measured from lot lines towards the center of the lot as follows: (a) When lot lines are curvilinear, setbacks must be measured parallel to the curvilinear lot line. (b) When there are multiple rear lot lines, the rear setback must be measured from each of the rear lot lines. (5) Front-yard averaging. The average yard depth of buildings on adjacent lots is used to determine the applicable contextual setback for the subject lot, as follows: (a) The build-to zone or averaged front yard depth is determined by calculating the mean yard depth that exists on the nearest two lots on either side of the subject lot. (b) The required setback using the front-yard averaging shall not be greater or less than five feet of the average. (c) If one or more of the lots required to be included in the front-yard averaging calculation are vacant, the vacant lot will be deemed to have a street yard depth equal to the minimum street setback requirement of the subject zoning district. (d) Lots with frontage on a different street than the subject lot or that are separated from the subject lot by a street or improved alley are not used in computing the front-yard average. (e) When the subject lot is a corner lot, the mean street yard depth will be computed on the basis of the nearest two lots with frontage on the same street as the subject lot, unless those two lots are in a different zone. If the two abutting lots are in a different zone, front-yard averaging does not apply and the setback or build-to zone required in the regulation applies. (f) When the subject lot abuts a corner lot with frontage on the same street, the mean yard depth will be computed on the basis of the abutting corner lot and the nearest two lots with frontage on the same street as the subject lot. (g) If the surrounding parcels are vacant, the required minimum setback or build-to line/zone in the ordinance applies. (6) Waterway frontage. A river or trail frontage build-to-zone or setback is measured from any required waterfront buffer into the lot perpendicular to the easement or lot line. See § 350-14 for waterway buffer. (7) Measurement: elements other than buildings. Minimum setbacks that apply to elements other than buildings (e.g., parking areas, fences, storage areas) are measured from the lot line, right-of-way line, or specific location referred to in the applicable regulations, to the nearest point of the feature. Figure 660(35) Build-to Zones [image] H. Separation distance. Required minimum separation distances are measured in a straight line from lot line to lot line unless otherwise expressly stated. I. Building coverage. Building coverage is measured as the percentage of a lot covered by all buildings. (1) Green roofs. Green, or vegetated, roofs reduce the building's building coverage, by calculating the surface of the building's green roof at a factor of 0.75% or 75% of the area. For example, if the surface of the green roof measures 13,000 sq. ft., then 9,750 sq. ft. (75% of 13,000) contributes to the lot's maximum building coverage. (2) Outdoor storage. Outdoor storage areas must be included in the building coverage calculation per § 660-51. Figure 660(36) Building Coverage [image] J. Attached garage and door location. (1) Garage setback measurement. Garage setbacks are defined in the building types (see Article 4) per one of the following: (a) Dimensional setback. When the building type regulation includes a dimensional setback for an attached garage, the attached garage setback is measured from the front facade of the building, located generally parallel and facing the lot front line. The setback is intended to promote the use of the area directly behind the front facade of any building for people and not the parking of vehicles. (b) No closer to lot line than front facade. When no dimensional setback for an attached garage is included in the building type regulation, the garage facade facing a front lot line must be located farther from the lot line than the front facade. (2) Garage door location. Any garage door must be located on one of the designated facades of the building. K. Limited side-yard parking. Where allowed, limited side-yard parking is located in the interior side yard and must be configured as one double- or single-loaded aisle of parking with the centerline of the aisle located perpendicular to the street. Limited side-yard parking may not extend into the front yard. L. Number of dwelling units. The number of dwelling units allowed must be consistent with the subject building type standards. (1) Number of dwelling units allowed per facade width. For certain building types, the requirement may be stated as X dwelling units allowed per every X feet of front facade width. The "every" means if increments of X feet are measured on the facade, and there is an increment left over that is less than X feet, that increment is not allowed to be utilized to determine the number of the dwelling units. For example, if the requirement is three units per every 18 feet of front facade width, a building with a front facade between 36 and 53 feet wide would allow up to six dwelling units. A building width of at least 54 feet wide would allow nine dwelling units. (2) Less than the facade width increment. A building with less than the minimum facade width increment is allowed only a single unit. For example, if the requirement is three units per every 18 feet of front facade width and the facade width is less than 18 feet, only one unit is allowed. (3) Maximum number of dwelling units. The maximum of number of dwelling units may not be exceeded, except as explicitly allowed per this chapter. M. Building height. See Figure 660(37). (1) Ground-story elevation. The ground-story elevation, located in the facade regulations for each building type, is measured from the average finished grade at the base of the building along any street lot line. A range is allowed per building type. See Figure 660(39) for basements and visible basements ranges above grade. (2) Minimum height. Each building type requires a minimum number of stories. The building must meet the minimum required height along all front street facades for a depth of at least 30 feet into the building. All building facades located within the build-to zone must meet the required minimum building height. (3) Maximum height. Maximum heights are specified in number of stories and/or feet. This requirement applies to the entire building. The maximum number of stories and/or feet may not be exceeded due to sloped sites. Heights must step with the grade in order to not exceed the maximum allowable height. See Figure 660(38). (4) Towers. When expressly allowed in the building type tables, towers may exceed the overall maximum height of the subject building type (see § 660-62). (5) Floor area ratio (FAR). FAR is the measurement of a building's floor area in relation to the size of the lot that the building is located on. FAR is measured by dividing the total gross building area (all stories) by the total area of the lot [building area (all stories) ÷ lot area]. (6) Height to eaves. Eave height is measured from the floor elevation of the first floor to the eave. (7) Roof type. Roof types per § 660-61 allowed by building type regulations (see Article 4) add additional height to the building. (8) Half stories. Half stories are stories either located fully within the roof type or in a visible basement. (a) Roof. Where occupied building space is allowed within the roof type (see § 660-61), any space within the roof and within the floor to floor height counts as a half story towards the overall allowable height. (b) Visible basement. See Figure 660(39) for diagram and explanation of a visible basement and § 660-133 for definitions of basements and visible basements. (c) Two half stories. If a building has both a half story within the roof and a half story that is a visible basement, the combined height of the two half stories is considered one full story in terms of measuring overall height. (9) Basements. See Figure 660(39) for illustration of basements and § 660-133 for definitions of basements and visible basements. (a) A basement that is not a visible basement does not count towards the minimum or maximum height of a building. (b) Any building may have a basement, unless expressly prohibited in this chapter. (c) A basement may contain any use allowed within the building, including those allowed only in upper stories. (10) Story height. Each story is measured with a range of permitted floor-to-floor heights per the subject building type. See Figure 660(37). (a) Measurement. All story heights are measured in feet between the floor of a story to the floor of the story above it, not including stairwells and other vertical circulation. (b) Ground story. When noted as a separate story height, the ground-story height must extend from the front street facade into the building a minimum of 30 feet. The remainder of the ground story may meet either the defined ground-story heights or the height range permitted for all stories. (c) Single-story buildings and top-story measurement. For single-story buildings and the uppermost story of a multi-story building, the floor-to-floor height is measured from the floor of the story to the ceiling, unless a specific height is provided for a single-story building. (d) Taller spaces. Where building heights are regulated in stories, taller spaces including mezzanines, atriums, and multi-story lobbies, are allowed within the interior of any building as follows: [1] Front facade. Taller spaces may be located along up to 35% of the front facade, measured along the horizontal length of each story. [2] Other facades. Taller spaces are allowed on all other facades. [3] Measurement. Taller spaces are calculated as multiple stories where each story is equal to the story height used on the majority of stories of the building or the average of the allowed floor-to-floor height of the building type. [4] Facade treatment. Taller spaces on any street facade must be articulated as multiple separate stories per the measurement required in this Subsection M(10)(d), building type requirements for horizontal shadow lines and transparency, and building articulation standards per § 660-65C. (e) Height exceptions. The height limitations of this chapter do not apply to chimneys, ventilators, skylights, water tanks, and necessary mechanical appurtenances located on or extending above the roof. Such features shall not conflict with the special height limitations of Chapter 148 regarding airport approaches. Mechanical appurtenances on the roof are also regulated in § 660-66. See the tower regulations for accommodating other rooftop structures, such as elevator shafts and rooftop access. (f) Commercial communications. The height of commercial communications towers and antennas are exempt from any building or roof type height regulations and are instead regulated in § 660-40B. Figure 660(37) Measuring Building Height [image] Figure 660(38) Measuring Height along Sloped Street [image] Figure 660(39) Basements and Visible Basements [image] N. Transparency. Governed by the building type regulations, the transparency of a facade is measured for each story separately using two regulations: (1) an overall minimum transparency percentage per story, and (2) where applicable per building type, maximum blank wall segments [per § 660-131N(3), below]. See Article 4. (1) Definition of "transparency." For the purposes of this chapter, transparency is the measurement of the percentage of a facade that contains highly transparent (generally clear with approximately 50% light transmittance), low-reflectance glass (a reflectance factor of no greater than 0.25, no mirrored glass). (a) False windows. The use of false or faux windows, where the window is visible from the exterior with no opening from the interior, to meet the transparency requirement is not allowed. (2) Measurement. Minimum facade transparency is measured from floor-to-floor of each story separately, except for required minimum ground-story transparency as defined below. See Article 4 for required transparency by building type. (a) Transparency requirements must be met with windows or glass in doors that comply with applicable transmittance and reflectance factors. (b) The measurement may include the frame, mullions, and muntins, but may not include trim or casing. (3) Blank wall segments. Where applicable per the building type regulations (see Article 4), no horizontal segments of a story's facade greater than the dimension established in the building type regulations may be blank wall, without transparency. See Figure 660(42). (4) Minimum ground-story transparency. When a separate minimum ground-story transparency is required per the building types requirements of Article 4, the ground-story transparency is measured between two feet and 10 feet from the average grade at the base of the facade. (5) Taller spaces. Stories that are 18 feet or taller in height must include additional transparency on the facades consistent with the following standards. See Figure 660(41). (a) Separate ground story transparency required. When a separate minimum ground story transparency is required per building type (see Article 4), the facade design must fulfil that requirement in addition to the minimum transparency for the remainder of the facade. (b) No separate ground story transparency required. Where no separate ground story transparency is required per building type (see Article 4), the facade of taller spaces must be treated as multiple separate stories, divided between nine and 14 feet apart, with the minimum transparency applied to each horizontal division. (6) Half stories. All half story facades located within the roof structure and within visible basements must meet the minimum required transparency. Figure 660(40) Measuring Transparency Floor-to-Floor [image] Figure 660(41) Measuring Transparency at Taller Spaces [image] Figure 660(42) Blank Wall Segments (2) [image] O. Building entrances. Entrances must be provided consistent with the entrance location and number of entrances, if regulated, established for the subject building type and consistent with Figure 660(43). (1) Number of entrances required per building increments. For longer buildings, the requirement is often stated as one entrance required per every X feet of front facade. The "every" means if increments of X feet are measured on the facade, and there is an increment left over that is less than X feet, that increment is not required to have an entrance. For example, if the requirement is one entrance per every 100 feet of facade, for a building that has a front facade 250 feet long, two entrances are required, but for a building 300 feet long, three entrances would be required. (2) Location per building increments. Once the number of entrances is determined, the location of those entrances must occur within the increments in order to space out the entrances along the facade. Figure 660(43) Entrances per Facade Increment [image]
Ask a question about Allentown law
Corpus searches the Allentown sections it holds and shows the ones that match, with their citations. Free, no sign-in.
