§ 660-38 — Manufacturing and industry group
Code of the City of Allentown, Pennsylvania (code date 2026-10-07) · Allentown Code § 660-38
Corpus is an independent public-information project, not the official City of Allentown website. Stable reference: corpuslaw.us/code/2ef4a206-2e67-4e31-a86a-da961d82853f
§ 660-38: Manufacturing and industry group.
The manufacturing and industry use group includes establishments involved in manufacturing, processing, fabrication, packaging, or assembly of goods or the servicing of industrial or commercial machinery, equipment, products or by-products. Uses in this group may include offices and ancillary retail sales as accessory uses. (1) | Public notice. Prior to the establishment of any new principal use in any of the following categories: High-Impact Industry, Recycling Use, and Data Center Use (greater than 50,000 sq ft), the following public notice requirements must be met: (a) | The applicant shall hold a public meeting prior to the first Zoning Hearing Board meeting where a special exception and/or variance is discussed or prior to the first Allentown City Planning Commission meeting when the proposed land development is discussed. In cases where only a Zoning Permit is required (and no special exception or variance is required), the meeting must occur two weeks prior to submittal. The purpose of the meeting shall be to inform the public about the nature of the proposed development, including the location, scale, and general characteristics. A representative(s) of the applicant with knowledge of the project and the ability to answer general questions from the public about the project's general locations, scale, and parameters shall participate in the meeting. The public meeting shall be advertised consistent with "public notice" as defined by the Pennsylvania Municipalities Planning Code (PA Act 247).[1] (b) | The applicant shall create and maintain a project website for viewing by the general public. The site shall explain the project parameters, including maps, elevations/renderings, anticipated electrical use, and noise levels, beginning at least two weeks prior to the meeting(s) discussed above, and until the time of final land development approval. The site shall provide a description of the proposed use, construction timelines and phasing plans, dates of public meetings with municipal bodies, and status of permits. A. Artisan manufacturing. (1) Use category description. The artisan manufacturing use category includes indoor work spaces used by artists for creation of art or the practice of their artistic endeavors or by craftspeople that produce consumer goods by hand-manufacturing involving the use of only hand tools and small-scale, light mechanical equipment. Artisan manufacturing uses occur in completely enclosed buildings with no outdoor operations, storage or regular commercial truck parking/loading. Typical uses include woodworking; custom furniture shops; reupholstering; cabinet-making; ceramic studios; jewelry manufacturing; confections and custom-made food items; and artwork including painting, printmaking and sculpture. B. Low-impact manufacturing. (1) Use category description. The low-impact manufacturing use category includes indoor work spaces for uses that do not meet the definition of artisan manufacturing and that do not, as part of their normal operations, generate noticeable off-site impacts in terms of noise, smoke, particulate matter, odors, vibration or heavy truck traffic. Typical examples of low-impact manufacturing uses include: commercial laundries and linen supply services, apparel manufacturing, bakery products manufacturing, bottling plants, ice manufacturing, mattress manufacturing and assembly, microbreweries, micro distilleries, musical instrument and parts manufacturing, newspaper printing and binderies, and uses involved in growing, washing, packaging and storage of fruits, vegetables and other plant products in enclosed buildings. C. Moderate-impact manufacturing. (1) Use category description. The moderate-impact manufacturing use category includes establishments that manufacture products from extracted or raw materials or recycled or secondary materials or that, as part of their normal operations, generate noticeable off-site impacts in terms of noise, smoke, particulate matter, odors, or vibration. The moderate-impact manufacturing use category includes lumber and wood products manufacturing; crematoriums; metal and metal products manufacturing, including enameling and galvanizing; large breweries (i.e., those with an annual production of more than 15,000 barrels or 465,000 gallons); and large distilleries (i.e., those with an annual production of more than 40,000 proof gallons). (2) Supplemental use regulations. (a) Crematoriums. Crematoriums are prohibited within 250 feet of any MX-N, GX-N, or N-zoned lot, as measured from lot line to lot line. D. High-impact industry. (1) Use category description. The high-impact industry use category includes establishments that use hazardous chemicals or procedures; generate hazardous byproducts or explosive hazards; or otherwise have high potential for adverse land use impacts related to community appearance, public safety, environmental impacts, or nearby residents' quality of life. The high-impact industry use category includes junk and salvage yards; waste-related uses; outdoor tire storage, mining, quarrying, and resource extraction operations; tire retreading or recapping; mulching and wood-splitting; fuel storage yards; and processing, storage, or stockpiling of soil, rock, concrete, brick, block, gravel, sand, and similar raw or recycled material. (2) Supplemental use regulations. (a) Mining, quarrying, and extractive uses. Mining, quarrying, and similar extractive uses are subject to the following supplemental use regulations: [1] No new mining, quarrying, or similar extractive use excavation or mechanical loading or processing of extracted materials may be located within: [a] Seventy-five feet of the right-of-way of a public street; [b] Two hundred feet of the boundary of an N Zone; or [c] Fifty feet of any other lot line. [2] A landscaped area with a minimum width of 25 feet must be provided around the perimeter of the use, except for necessary perpendicular crossings. [3] The Zoning Hearing Board is expressly authorized to require berms, landscaping, fencing and additional setbacks as needed to protect the public safety and to avoid conflicts with neighboring uses. [4] A copy of mapping and all application materials submitted to the State Department of Environmental Protection must be provided to the Zoning Officer. (b) Junk yards and salvage yards. Junk yards, salvage yards, and scrap yards are subject to the following supplemental use regulations: [1] All new and expanded uses must be surrounded by a secure security fence or wall with a minimum height of eight feet. All perimeter security fences and walls must be placed on the inside of any required landscape buffers (see §§ 660-77 and 660-78). [2] Outdoor storage and processing of junk or scrap must be set back at least: [a] One hundred feet from the lot line of a dwelling or a N Zone; and [b] Fifty feet from the right-of-way of a public street or any other lot line. [3] Any bulk mechanical crushing of metals must be set back a minimum of 250 feet from any N Zone. [4] Cleared driveways must be provided around and throughout the junkyard to allow access by emergency vehicles. Off-street parking areas may not obstruct such emergency access. [5] Burning or incineration of junk or vehicles is prohibited. All gasoline and oil must be drained from vehicles and be properly disposed of. All batteries must be removed from vehicles and stored on an impervious surface that is drained to collect any acids for proper disposal. [6] No junk, salvage, or other material may be stored at a total height of more than 25 feet above the ground. [7] See also the outdoor tire storage regulations, below. (c) Outdoor tire storage. Outdoor storage areas for used tires are subject to the following supplemental use regulations: [1] Any area used for the bulk overnight outdoor storage or processing of used tires must be set back at least 50 feet from any lot line and be separated by at least 50 feet from any other area containing 100 or more used tires. Required setback and separation areas may not contain combustible material. [2] Any area used for the outdoor storage of 200 or more used tires must comply with the supplemental use regulations for junk and salvage yards. [3] No outdoor used tire storage area may contain more than 500 used tires. [4] Outdoor used tire storage areas may not exceed 25 feet in height. (d) Waste-related use. Lands and facilities used for waste disposal, processing, incineration, or transfer operations are subject to the following supplemental use regulations: [1] All solid waste processing and storage areas must be set back at least 150 feet from public street rights-of-way, exterior lot lines, and perennial rivers or streams. [2] All solid waste processing and storage areas must be set back at least 300 feet from any lot occupied by a dwelling unit. [3] Open outdoor burning is prohibited. [4] All solid waste processing, storage, loading and unloading must occur within an enclosed building or enclosed containers. All processes must occur on an impervious surface that prevents polluted runoff from flowing from the site or into the groundwater. [5] The use must be surrounded by secure fencing and gates. [6] A minimum lot area of eight acres is required. [7] The use must be operated in a manner that prevents the attraction, harborage or breeding of insects, rodents or other vectors. [8] An attendant must be on duty during all hours of loading and unloading. [9] Radioactive, chemotherapeutic, toxic or infectious materials are prohibited. E. Industrial service. (1) Use category description. The industrial service use category includes businesses engaged in the sale, repair, or servicing of industrial or commercial machinery, equipment, products or by-products. Typical uses include welding shops; machine shops; heavy truck servicing and repair; towing and vehicle storage yards; bus and taxi storage yards, and fleet fueling facilities. (2) Supplemental use regulations. Tractor-trailer combinations, buses, and similar large/heavy vehicles associated with an industrial service use may not be parked within 20 feet of an N Zone. F. Recycling use. (1) Use category description. Uses that collect, store or process recyclable material for the purpose of marketing or reusing the material in the manufacturing of new, reused or reconstituted products. (2) Subcategories. The recycling use category includes the following subcategories: (a) Recyclable material collection. An establishment that (1) accepts consumer recyclable commodities directly from the consuming party; (2) is staffed by personnel on site during hours of operation; and (3) stores materials temporarily before transferring them to recyclable material processing facilities. (b) Recyclable material processing. Establishments that receive and process recyclable commodities for subsequent use in the secondary market. G. Warehousing and distribution. (1) Use category description. The warehousing and distribution use category includes uses that sell, lease, provide, or distribute goods in large quantities, principally to other commercial, manufacturing, or industrial businesses. Examples include warehouses, food depositories, package delivery services, and household and commercial moving companies. Warehousing and distribution uses may include wholesale sales showrooms. This category does not include uses more specifically identified in the self-service storage use category. (2) Subcategories. The warehousing and distribution use category includes the following subcategories: (a) Indoor. Warehousing and distribution uses conducted primarily within completely enclosed buildings. (b) Outdoor. Warehousing and distribution uses with a substantial portion of their stock in-trade displayed or stored outdoors. This use subcategory expressly includes truck terminals (i.e., parking and storage of trucks), truck stops, and warehousing and distribution uses with more than three loading bays or docks, and uses engaged in the dispatching and long-term or short-term storage of trucks, buses and similar vehicles. (3) Supplemental use regulations. (a) Warehouse and distribution uses with more than 50,000 square feet of indoor gross floor area require a minimum lot area of five acres in the IG Zone and eight acres in the IM Zone. (b) Tractor-trailer combinations, buses, and similar large/heavy vehicles associated with warehousing and distribution use may not be parked within 20 feet of an N Zone. Refrigerated trailers may not be parked within 100 feet of MX-N-, GX-N-, or N-zoned lots. (c) Outdoor warehousing and distribution uses must comply with all applicable regulations related to truck idling, and signs must be posted to warn violators of penalties for violations. (d) Warehousing and distribution uses are subject to the noise regulations of Chapter 400. H. Data center use. (1) Use category description. The data center use category includes a building, buildings, or structures which are occupied primarily by computers and/or telecommunications and related equipment where digital information is processed, transferred and/or stored, primarily to and from offsite locations. This use does not include computers or telecommunications related equipment that is secondary and customarily incidental to an otherwise permitted use on the property, such as servers associated with an office building. This use shall also include cryptocurrency mining, blockchain transaction processing, and server farms. The Data Center Use shall include data center as a principal or accessory use and data center accessory uses (see § 660-135). (2) Supplemental use regulations. Data center uses are subject to the following supplemental use regulations: (a) No new data center use or accessory data center use may be located within: [1] 75 feet of the right-of-way of a public street; [2] 500 feet of the lot line of any: [a] Use within the Residential use group; [b] Use within the Civic and Institutional use group (except Cemetery, Governmental Use, Transportation Facilities or Infrastructure and Utilities); [c] Child Care use category; or [d] Any MX-N-, GX-N-, or N-zoned lot. [3] 50 feet of any other lot line. (b) Data center uses with more than 50,000 square feet of indoor gross floor area require a minimum lot area of eight acres. (c) A landscaped buffer, including shade trees, evergreen trees, and planting beds, with a minimum width of 25 feet must be provided around the perimeter of the use, except for necessary perpendicular crossings. Rows of shade trees and evergreen trees are to be staggered to create a dense buffer with planting beds at the exterior rows. See § 600-78F for distance and size requirements for plantings in each row. Native plants are encouraged to the maximum extent possible. The Allentown Shade Tree Commission (ASTC) may provide comments on specific plantings. (d) The zoning hearing board is expressly authorized to require berms, landscaping, fencing and additional setbacks as needed to protect the public health and safety and to avoid conflicts with neighboring uses. (e) The applicant shall submit a narrative description of the nature of the proposed onsite activities and operations, anticipated hours of operation, anticipated frequencies and types of vehicle trips generated, and anticipated types of materials/equipment stored on site. Information obtained from any required Transportation Impact Statements/Analyses may be summarized here. (f) Environmental impact. [1] The applicant shall submit an evaluation of possible environmental impacts, and where necessary, propose mitigation strategies. The assessment must be prepared by a qualified professional, and consider both normal/typical conditions and adverse conditions (i.e., drought, extended power outages, extreme heat, etc.) relevant to the following: [a] Air quality; [b] Surrounding soil quality; [c] Surrounding water quality; [d] Groundwater sources; [e] Wildlife and wildlife habitat; and [f] Greenhouse gas emissions. (g) Noise and vibration. [1] A full spectrum (dBA + dBC) pre and post-construction (or pre and post-conversion, as applicable) sound study shall be produced by a qualified third-party acoustical consultant to demonstrate that the data center and data center accessory uses will conform with the requirements of Chapter 400, Noise, and other requirements found in this chapter. The sound study must: [a] Document pre-existing baseline ambient noise level at the time of an initial data center plan submittal, using full spectrum modeling to address low frequency sounds. [b] The study must measure daytime and nighttime noise, as well as worst-case scenario operation, which shall include full build-out operation of all mechanical equipment, including but not limited to generators, cooling systems, transformers and electrical infrastructure. [c] The sound study must also assess any persistent tonal sounds (hums) or other consistent low-frequency or ambient noise including but not limited to generators, cooling systems, transformers and electrical infrastructure, and vehicular operations. [d] The sound study must include a vibration study prepared by a qualified professional shall be provided that demonstrates that no vibration from the data center and data center accessory uses will be perceptible to the human sense of feeling beyond the property line. [e] The sound study must indicate sound levels of any generator use during emergency and/or testing periods. [2] The third-party acoustical consultant must state whether noise mitigation measures are recommended by noise study and, if so, identify the applicable mitigation measures. [3] The third-party acoustical consultant shall meet the following: [a] The acoustical consultant shall have no financial interest in the project other than payment for the preparation of the sound study. [b] The acoustical consultant shall demonstrate: [i] Relevant experience in environmental noise analysis. [ii] Appropriate education or professional credentials such as professional licensed engineer specializing in acoustics or an engineer Board Certified by the Institute of Noise Control Engineers. [iii] Prior completion of comparable sound studies. [c] The City reserves the right to review and approve the qualifications of the acoustical consultant and may require the selection of an alternative consultant if independence or qualifications are deemed insufficient. [4] Prior to the issuance of a Certificate of Occupancy, the applicant shall submit an as-built sound study prepared by a qualified third-party acoustical consultant demonstrating compliance with all applicable sound standards, including both A-weighted (dBA) and C-weighted (dBC) limits, where applicable. An as-built sound study shall also be conducted six months after issuance of the Certificate of Occupancy for any data center and data center accessory uses and upon request by the City thereafter to ensure continuous compliance with the requirements of Chapter 400, Noise, and consistent with the representations and/or mitigation strategies described in the sound study. [5] If it is determined by the as-built sound study that there is a violation of Chapter 400, Noise, and/or if the conditions are not consistent with the representations and/or mitigation strategies described in the sound study, it shall be considered a violation of this chapter and the conditions of approval, and the zoning officer is authorized to cancel, revoke, withhold or suspend a permit issued under the provisions of this zoning ordinance, as described in § 660-123C, Revocation of permits. (h) Water and sewer. [1] A Water Utilization Report shall be submitted detailing, at a minimum, the total daily intake volume and source(s) of that water, discharge volumes and destinations, cooling system type and efficiency, and shall demonstrate compliance with the City's stormwater ordinances and regulations. The Report shall be prepared and certified by a professional engineer. The Report shall be subject to review and comment by the City. The City shall have the right to require supplemental or amended reports based upon comments by the City prior to any zoning approval. [2] The applicant shall submit documentation from the Lehigh County Authority (LCA) certifying that the Authority will supply the water needed for the use. If the LCA or the City identify a detrimental impact or threshold where utility capacity is not sufficient, the applicant shall provide, at their own expense, the infrastructure upgrades and/or system improvements necessary to supply the facility. [3] If the use uses nonpublic water sources, the applicant shall provide a water feasibility study to determine if there is an adequate supply of water for the use and to estimate the impact on existing wells, groundwater, and surface water in the vicinity. The study shall be reviewed and approved by the Delaware River Basin Commission, LCA and PA Department of Environmental Protection (PA DEP) for water withdrawals from groundwater or streams, where applicable. [4] The applicant shall demonstrate adequate means of wastewater disposal have been provided and approved by the PA DEP. Discharge of water used as a direct or indirect cooling medium for equipment is not an authorized non-stormwater discharge into the Municipal Separate Storm Sewer System (MS4) per the City's MS4 NPDES permit. (i) Power supply. [1] The applicant shall identify the portion of its energy use that will be met through on-site renewable energy generation. Data centers are encouraged to make good faith efforts to maximize use of renewable and/or clean energy for electrical and cooling needs, either through on-site generation or verifiable power purchase agreements (PPAs). [2] An Energy Management Plan shall be submitted detailing at a minimum, annual electricity demand, the supply sources to be utilized, energy storage capacity (if applicable) and efforts made to maximize energy efficiency and use of renewable or clean energy. The plan shall be prepared and certified by a professional engineer. [3] If the applicant proposes to connect the use to the electric grid, the applicant shall provide documentation from the applicable electric service provider certifying the necessary capacity is available and the provider will serve the use. An assessment identifying any impacts on electric rates or availability for other uses directly attributable to the use shall be provided to the City. [4] If the assessment identifies a detrimental impact or threshold where utility capacity is not sufficient, the applicant shall provide, at their own expense, the system improvements necessary to mitigate any limits or system improvements necessary. [5] If the necessary system improvements are determined by the City Engineer and the respective public utility provider to be infeasible, then on-site utility methods may be considered in compliance with all City ordinances. (j) Electronic waste and decommissioning: [1] An Electronic Waste Plan shall be submitted outlining procedures for safe removal and recycling or disposal of server infrastructure, hazardous materials, batteries, electronic waste, and related products, which will apply in cases when the data center is updated or decommissioned. [2] A Decommissioning and Site Restoration Plan shall be submitted. Upon cessation of operation of the data center use and/or data center accessory use for a period of at least 12 months, except where the City agrees to allow the owner or operator additional time due to their intent to re-continue such use in the near future, the owner or operator of the use shall ensure the following standards are met: [a] All generators, tanks, battery systems, electrical infrastructure, accessory structures, and related improvements associated with such use shall be removed from the subject property. [b] Hazardous materials, including batteries, fuel or refrigerants shall be disposed of in compliance with state and federal law. [c] Disturbed soils shall be stabilized and re-vegetated. [d] Any utility connections shall be safely disconnected and capped. [e] The site shall be restored to a condition compatible with surrounding land uses or consistent with the most restrictive adjacent zoning district. [3] Said removal activities shall commence within one year of the conclusion of the 12-month period referenced above and shall be completed no later than three years following the commencement of the removal activities. [4] To ensure removal as described, the applicant shall provide a decommissioning and site restoration bond or letter of credit in the form acceptable to the City and naming the City as a beneficiary sufficient to remove all generators, fuel tanks, battery systems, electrical infrastructures, and related improvements and to restore the site for future reuse. [5] If the owner or operator fails to comply with this section, the City may utilize such financial security to perform or cause the performance of the removal of all generators, fuel tanks, battery systems, electrical infrastructure and related improvements associated with the abandoned use. Such financial security shall be maintained until the completion of the removal activities described herein, and may be reviewed periodically by the City to ensure that the amount of security remains adequate to secure removal. The financial security must be in the amount equal to 100% of the total estimated cost of decommission and restoration. The financial security must be posted prior to commencement of any land development activities, earth disturbance, and/or issuance of building permits. (k) Heat mitigation. [1] A Thermal Impact Mitigation Plan shall be submitted, including, at a minimum, strategies for waste heat reuse or dissipation. Passive cooling strategies such as cool roofs, natural vegetation (green roofs/shade trees) and light-colored exterior walls are encouraged to mitigate urban heat islands and reduce energy consumption. The Plan will be prepared and certified by a professional engineer. (l) Emergency management. [1] The applicant shall submit an Emergency Response Plan (ERP) prepared by a qualified professional. The ERP shall: [a] Be reviewed and accepted by the City Fire Department and Lehigh County Office of Emergency Management as part of the special exception and/or land development process; [b] Include detailed procedures for fire suppression, containment, ventilation, and evacuation; [c] Include an evaluation of the access roads and hydrant locations within the site to ensure suitable access for emergency equipment within the site; [d] Ensure that all first responders receive adequate training specific to the installed system; [e] Include provisions for annual fire safety inspections demonstrating compliance with fire safety standards to be performed by a qualified professional on behalf of the data center. [2] Any data center use proposing battery storage or any other device or group of devices capable of storing energy in order to supply electrical energy at a later time, whether the energy is stored for use on-site or off-site, shall demonstrate compliance with National Fire Protection Association (NFPA) Standard 855, Installation of Stationary Energy Storage Systems, or similar standards and must include fire suppression systems designed specifically for battery storage. [3] No data center shall be approved unless the applicant demonstrates that procedures for fire suppression, containment, ventilation, and evacuation are sufficiently protective of public health, safety and welfare. (m) Aesthetics. [1] Any data center use building facade that faces a public street, MX-N-, GX-N-, or N-zoned lot, existing residential use, or other frontages per § 660-18J(9) must incorporate at least two of the following design elements every 150 horizontal feet: [a] A change in building material, pattern, texture, or color; [b] A change in building height; [c] Building step-backs or recesses having a minimum depth of five feet. (n) At least one off-street loading space shall be provided for a data center. (o) Maximum building height of 50 feet. [1] On lots 15 acres or larger in area, the building height may be increased to a maximum of 70 feet through a special exception approval and in accordance with the supplemental workshop building regulations of § 660-32H(1)(a). (p) All required plans, studies, evaluations, assessments, and strategies shall be submitted together with the zoning permit application. If a land development application is submitted prior to the zoning permit application, such documents shall be submitted together with the land development application. Such documents shall be subject to review and comment by the City. The City shall have the right to require supplements and/or amendments to such documents based upon comments by the City prior to any zoning approval. (q) Applications for approval of data center use projects shall be referred to the Allentown City Planning Commission (ACPC) and Allentown Environmental Advisory Council (AEAC), for review and comment. Feedback from the ACPC, AEAC, and (when requested) Allentown Shade Tree Commission, shall be reviewed by the applicant and incorporated into any necessary mitigation strategies. (r) All documents required by this § 660-38H must be reviewed and accepted by the City Engineer or third-party consultant. When the City determines that competent and expeditious review of the documents detailed in this section require review by a third-party consultant, the applicant is responsible for reasonable fees associated with such third-party consultants.
[Amended 6-17-2026 by Ord. No. 16223 ; 8-5-2026 by Ord. No. 16232 ]
Ask a question about Allentown law
Corpus searches the Allentown sections it holds and shows the ones that match, with their citations. Free, no sign-in.