§ 7-331.10 — Grading and erosion control
Code of the City of Harrisburg, Pennsylvania · Harrisburg Code § 7-331.10
Corpus is an independent public-information project, not the official City of Harrisburg website. Stable reference: corpuslaw.us/code/d9bbf76e-bd2a-4af1-a09e-3d743f914c40
§ 7-331.10: Grading and erosion control.
A. Each City permit is granted on the condition that the permit is in full compliance with state erosion and sedimentation regulations. The Zoning Officer may require the submittal of an erosion and sedimentation control plan with review by the Dauphin County Conservation District wherever soil will be disturbed. Failure to comply with such regulations or plan shall be cause for suspension of City permits. B. Slopes that have the serious threat of instability, in the determination of the City Engineer, shall not be created. The Zoning Officer may require applicants to provide certification from a professional engineer that finished slopes greater than 4:1 will be stable. C. Grading, fill, dumping of clean fill, excavation, or movement of materials shall be completed to avoid an unsightly appearance and to prevent interference with drainage, streets, or utilities. Any fill placed on a site shall be leveled off and properly sloped within three months of placement, except for soil stockpile areas shown on an approved erosion and sedimentation control plan.
Ask a question about Harrisburg law
Corpus searches the Harrisburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.
