For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 7-503.5 — Plans exempted from standard procedures

Code of the City of Harrisburg, Pennsylvania · Harrisburg Code § 7-503.5

Corpus is an independent public-information project, not the official City of Harrisburg website. Stable reference: corpuslaw.us/code/1f2de0b7-9272-4aff-b565-e35aee97857f

§ 7-503.5: Plans exempted from standard procedures.

A. Any replatting or resubdivision of a recorded plan, or revision of approved final plans which have not yet been recorded, excluding lot grading plan in subdivisions, shall be considered as a new application and shall comply with all requirements of this chapter, except that plans may be changed, provided that in making such changes: (1) No lot or tract of land shall be created that does not meet the minimum design standards required by this code and other existing City regulations. (2) No structure shall be relocated which does not meet the minimum design standards required by this chapter and other existing City regulations. (3) No increase is made to the overall density. (4) The stormwater management facilities are not altered in a manner which significantly affects the discharge of stormwater onto an adjacent property or significantly relocates a major stormwater management facility within the project. The staff has the right to submit to the Commission for review any alteration of a stormwater management facility. (5) Street locations and block sizes shall not be changed. (6) The character and land use of the original application shall be maintained. B. In every case where a plan alteration conforms to the above: (1) The applicant shall submit to the Commission five black on white or blue on white paper copies of the revised final plan and one application form. The application form is available from the Bureau of Planning. (2) The Commission staff shall distribute one copy of the revised final plan to each of the following for review: (a) Dauphin County Planning Commission. (b) City Engineer. (c) Fire Chief. (d) Police Chief. (3) Upon review of the revision, the staff will, in writing, advise the applicant whether or not the revision complies with the above. (4) If the revision complies, the applicant shall prepare four paper copies of the plan for recording, one copy for the City Engineer, two copies for the Commission's files and one copy for the Dauphin County Recorder of Deeds. These copies will be certified by the Commission as specified in § 7-503.4S of this chapter. (5) The plans shall then be recorded as specified in § 7-503.4T of this chapter. C. In the case of any proposed subdivision or land development plan of no more than 10 lots or units which does not require provision for a new street, the applicant may concurrently submit combined preliminary and final plans for review and approval by the Commission and City Council. In such instances, the applicant shall submit a plan which shall be designated "preliminary/final." All other plans shall be submitted in accordance with § 7-503.3 of this chapter. D. The lease, conveyance, sale, or transfer of land for the sole purpose of increasing the lot size of an adjacent contiguous lot shall comply with the following lot add-on procedure, provided that the proposal does not alter a subdivision plan of record, create additional lots, or result in a nonconformity with the design standards found in this Subdivision and Land Development Code or with other existing City regulations: (1) In every case where a proposal conforms to the above, the applicant shall comply with the following procedures: (a) Submit to the Commission staff five black on white or blue on white paper copies of a lot add-on plan, prepared to the standards specified in § 7-505.11 of this code, and one application form, available from the Bureau of Planning. (b) The Commission staff shall distribute one copy of the lot add-on plan to each of the following: [1] Dauphin County Planning Commission. [2] City Engineer. [3] Fire Chief. [4] Police Chief. (2) Upon review of the revision, the staff will, in writing, advise the applicant whether or not the proposal qualifies as a lot add-on plan. (3) If the plan qualifies, the applicant shall prepare four paper copies of the plan for recording; one copy for the City Engineer, two copies for the Commission's files and one copy for the Dauphin County Recorder of Deeds. These copies will be certified by the Commission as specified in § 7-503.4S of this chapter. (4) The plan shall then be recorded as specified in § 7-503.4T of this chapter. (5) The plan shall be filed with the Dauphin County Recorder of Deeds prior to the execution of a deed for the land.

Ask a question about Harrisburg law

Corpus searches the Harrisburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.