§ 9-501.9 — Wastewater discharge permits
Code of the City of Harrisburg, Pennsylvania · Harrisburg Code § 9-501.9
Corpus is an independent public-information project, not the official City of Harrisburg website. Stable reference: corpuslaw.us/code/b81d3b62-2904-46ee-80d7-f910a7f40175
§ 9-501.9: Wastewater discharge permits.
A. Any industrial establishment desiring to discharge or currently discharging, directly or indirectly, wastes into the sewer system, or planning to change operations so as to materially alter the characteristics and/or volumes of wastewaters discharged into the sewer system, shall notify the Department and any affected suburban municipality in writing at least 30 days before making such connection or changing its operations and shall obtain a permit from the Department to do so. Applications for such permit shall be on the form supplied by the superintendent and shall be accompanied by all information requested by the Department for the determination of waste volumes, characteristics and constituents. The cost for obtaining such information shall be borne by the applicant. Any significant industrial user shall make application for a new permit within 30 days of the effective date of this section. B. This application shall include, but shall not be limited to, the following information, in units and terms appropriate for evaluation: (1) Name, address and location of applicant; (2) NAICS number(s) according to the North American Industrial Classification System Manual, Office of Management and Budget, 1998, as amended; (3) Volume of wastewaters to be discharged; (4) Wastewater constituents and characteristics, including, but not limited to, those set forth in § 9-501.7B, as determined by a reliable analytical laboratory. Sampling and analysis shall be performed in accordance with the procedures established by the United States EPA pursuant to Section 304(g) of the Federal Act, 33 U.S.C. § 1314(g), and the regulations promulgated thereunder, 40 CFR Part 136, as amended; (5) Time and duration of discharge; (6) Average and maximum wastewater flow rates, including daily, monthly and seasonal variations, if any; (7) A schematic flow representation which shall include floor plans, mechanical and plumbing plans and details of all sewers, sewer connections and appurtenances, sizes, locations and elevations; (8) A schematic flow representation which shall include all pretreatment or treatment plans and details, including appurtenances, sizes, locations, elevations; (9) Pretreatment, treatment and flow meter standard operating procedures manual; (10) Number of employees and hours worked; (11) Description of activities, facilities and plan processes on the premises, including all materials which are or could be discharged; (12) Each product produced, listed by type, amount and rate of production; (13) Type and amount of raw materials processed, average and maximum per day; (14) Each substance considered toxic, hazardous, noxious or malodorous, including a description of the hazards associated with each substance; (15) Certification of accuracy by the applicant; (16) Any other information required by 40 CFR 403.12(b) or any other information as may be deemed necessary by the Department to evaluate that permit application. C. The Department shall evaluate the data furnished by the applicant and may require additional information. After evaluation and acceptance of the date furnished, the superintendent shall issue a permit subject to terms and conditions provided therein, as set forth in Subsection D hereof. D. Wastewater discharge permits shall be subject to all provisions of this chapter and all other applicable federal, state and local laws, rules, regulations, charges, and fees. The conditions of such permits shall be uniformly enforced by the City in accordance with this chapter and applicable federal, state and local laws, rules and regulations. Permits may contain, but shall not be limited to, the following conditions: (1) The unit charge or schedule of special charges and fees or wastewater surcharges to be paid the City for the wastewater to be discharged into the sewer system pursuant to such permit; (2) The average and maximum allowable wastewater constituent and characteristics; (3) Equalization, neutralization or other requirements to control high pH or highly variable pH discharge; (4) Limits on rate and time of discharge or requirements for flow regulations and equalization; (5) Requirements for installation, maintenance and/or operation of monitoring, inspection and sampling facilities; (6) Pretreatment requirements; (7) Requirements for submission of technical reports or discharge reports; (8) Signatory requirements for certification of technical reports or discharge reports; (9) Requirements for maintaining and retaining plant records relating to wastewater discharge for a minimum of three years or longer, as specified by the Department, and affording the Department access thereto; (10) Compliance schedules; (11) Specifications for monitoring programs, including self-monitoring, sampling location, frequency and method of sampling, number, types and standards for tests and reporting schedules; (12) Requirements for notification of pretreatment standard exceedance and repeat sampling and testing; (13) Requirements for notification of slug or accidental discharge; (14) Requirements for a spill prevention and control plan; (15) Requirements for a spill or slug discharge prevention and control plan in accordance with 40 CFR 403.8(f)(2)(vi)(A)(B)(C) and (D); (16) Requirements for best management practices; (17) Other conditions as deemed appropriate by the City to insure compliance with these regulations. E. Wastewater discharge permits shall be issued for a specified time period, not to exceed five years, subject to compliance with all of the provisions of this chapter and the regulations promulgated thereunder. Any applicant who does not meet the standards of this chapter shall not be entitled to a five-year permit. All holders of a wastewater discharge permit must also comply with any National Categorical Pretreatment Standards within 90 days of their promulgation or any revisions thereto. F. A wastewater discharge permit is not assignable or transferable to a new user, owner or new use.
[ Ord. No. 43-1990 ]
Ask a question about Harrisburg law
Corpus searches the Harrisburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.
