§ 9-909.2 — SWM site plan and report contents
Code of the City of Harrisburg, Pennsylvania · Harrisburg Code § 9-909.2
Corpus is an independent public-information project, not the official City of Harrisburg website. Stable reference: corpuslaw.us/code/f9be323a-b4bc-4481-b63e-d474f4c31a95
§ 9-909.2: SWM site plan and report contents.
The SWM site plan and SWM site report shall consist of all applicable calculations, maps, and plans. All SWM site plan materials shall be submitted to the City of Harrisburg in a format that is clear, concise, legible, neat and well organized; otherwise, the SWM site plan shall be rejected. Appropriate sections from the Municipal Subdivision and Land Development Ordinance,[1] and other applicable local ordinances, shall be followed in preparing the SWM site plan. A. SWM site plans shall include (but not be limited to): (1) Plans on sheets no larger than 24 inches by 36 inches and in a form that meets the requirements for recording in the office of the Recorder of Deeds of Dauphin County. (2) The name of the development; name and location address of the property site; name, address, and telephone number of the applicant/owner of the property; and name, address, telephone number, e-mail address, and engineering seal of the individual preparing the SWM site plan. (3) The date of submission and dates of all revisions. (4) A graphical and written scale on all drawings and maps. (5) A North arrow on all drawings and maps. (6) A location map at a minimum scale of one inch equals 1,000 feet. (7) Metes and bounds description of the entire tract perimeter. (8) Existing and final contours at intervals of two feet. (9) Existing water bodies within the project area, including streams, lakes, ponds, field-delineated wetlands or other bodies of water, sinkholes, flood hazard boundaries (FEMA-delineated floodplains and floodways), areas of natural vegetation to be preserved, the total extent of the upstream area draining through the site, and overland drainage paths. (10) The location of all existing and proposed utilities, on-lot wastewater facilities, water supply wells, sanitary sewers, and water lines on and within 50 feet of property lines. (11) A key map showing all existing man-made features beyond the property boundary that may be affected by the project. (12) Soil names and boundaries with identification of the Hydraulic Soil Group classification. (13) The proposed limit of disturbance line and associated proposed disturbed acres. (14) Proposed structures, roads, paved areas, and buildings, including plans and profiles of roads and paved areas and floor elevations of buildings. (15) Horizontal alignment, vertical profiles, and cross-sections of all open channels, pipes, swales and other BMPs. (16) The location and clear identification of the nature of permanent stormwater BMPs. (17) The location of all erosion and sedimentation control facilities. (18) A minimum twenty-foot-wide access easement around all stormwater management facilities that would provide ingress to and egress from a public right-of-way. In lieu of providing an easement to the public right-of-way, a note may be added to the plan granting the City of Harrisburg or its designees access to all easements via the nearest public right-of-way. (19) Construction details for all drainage and stormwater BMPs. (20) Construction details of any improvements made to sinkholes. (21) Identification of short-term and long-term ownership, operations, and maintenance responsibilities. (22) Notes and statements: (a) A statement, signed by the landowner, acknowledging that the stormwater BMPs are fixtures that cannot be altered or removed without prior approval by the City of Harrisburg. (b) A statement referencing the operation and maintenance (O&M) agreement and stating that the O&M agreement is part of the SWM site plan. (c) A note indicating that record drawings will be provided for all stormwater management facilities prior to occupancy or the release of financial security. (d) The following signature block for the qualified professional preparing the SWM site plan: "I,__________, hereby certify that the stormwater management plan meets all design standards and criteria of the City of Harrisburg's Stormwater Management Ordinance." (e) The following signature block for the qualified professional preparing the SWM site plan as applicable: "I,__________, hereby certify that there (are/are not) wetlands on the subject property, the proposed project (will/will not) impact off-site wetlands, and permits (are/are not) required from the state or federal government." B. SWM site reports shall include (but not be limited to): (1) The name of the development; name and location address of the property site; name, address, and telephone number of the applicant/owner of the property; and name, address, telephone number, e-mail address, and engineering seal of the individual preparing the SWM site report. (2) Project description narrative, including expected project time schedule. (3) Location map showing the project site and its location relative to release rate districts. (4) Drainage area maps for all watersheds and inlets depicting the time of concentration paths. (5) A detailed description of the existing site conditions. A detailed site evaluation shall be completed for projects proposed in areas of carbonate geology or karst topography, and other environmentally sensitive areas such as brownfields. (6) Complete hydrologic, hydraulic and structural computations, calculations, assumptions, and criteria for the design of all stormwater BMPs. (7) Description of and justification and actual field results for infiltration testing with respect to the type of test and test location for the design of infiltration BMPs. (8) Calculations showing the total drainage area and impervious area loading rates to each BMP. (9) The effect of the project (in terms of runoff volumes, water quality, and peak flows) on surrounding properties and aquatic features and on any existing municipal stormwater collection system that may receive runoff from the project site. (10) Description of the proposed changes to the land surface and vegetative cover, including the type and amount of impervious area to be added. (11) All applicable worksheets from Chapter 8 of the BMP Manual when establishing volume controls. (12) Identification of short-term and long-term ownership, operation, and maintenance responsibilities as well as schedules and costs for inspection and maintenance activities for each permanent stormwater or drainage BMP, including provisions for permanent access or maintenance easements. C. Supplemental information to be provided prior to recording of a SWM site plan, as applicable: (1) Signed and executed operations and maintenance agreement (Appendix A).[2] (2) Signed and executed easements, as required for all on-site and off-site work. (3) An erosion and sedimentation control plan and approval letter from the Dauphin County Conservation District. (4) An NPDES permit. (5) Permits from PADEP and ACOE. (6) A geologic assessment. (7) A wetland delineation report. (8) A highway occupancy permit from PennDOT when utilization of a PennDOT storm drainage system is proposed or when proposed facilities would encroach onto a PennDOT right-of-way.
Ask a question about Harrisburg law
Corpus searches the Harrisburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.
