For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9-917.2 — Operation and maintenance responsibilities

Code of the City of Harrisburg, Pennsylvania · Harrisburg Code § 9-917.2

Corpus is an independent public-information project, not the official City of Harrisburg website. Stable reference: corpuslaw.us/code/e0a72930-1083-45e8-a7bf-da42dd06c513

§ 9-917.2: Operation and maintenance responsibilities.

A. The SWM site plan and report for the project site shall describe the future operation and maintenance responsibilities. The operation and maintenance description shall outline required routine maintenance actions and schedules necessary to ensure proper operation of the stormwater control facilities. B. The SWM site plan and report for the project site shall establish responsibilities for the continuing operation and maintenance of all proposed stormwater control facilities, consistent with the following principles: (1) If a development consists of structures or lots that are to be separately owned and in which streets, sewers, and other public improvements are to be dedicated to the City of Harrisburg, stormwater control facilities/BMPs may also be dedicated to and maintained by the City of Harrisburg. (2) If a development site is to be maintained in a single ownership or if sewers and other public improvements are to be privately owned and maintained, then the ownership and maintenance of stormwater control facilities/BMPs shall be the responsibility of the owner or private management entity. (3) Facilities, areas, or structures used as stormwater BMPs shall be enumerated as permanent real estate appurtenances and recorded as deed restrictions or easements that run with the land. (4) The SWM site plan and the operation and maintenance (O&M) agreement shall be recorded as a restrictive deed covenant that runs with the land. (5) The city of Harrisburg may take enforcement actions against an applicant for failure to satisfy any provision of this Part 9. C. The city of Harrisburg, upon recommendation of the City Engineer, shall make the final determination on the continuing maintenance responsibilities prior to final approval of the SWM site plan and report. The city of Harrisburg may require a dedication of such facilities as part of the requirements for approval of the SWM site plan. Such a requirement is not an indication that the City of Harrisburg will accept the facilities. The City of Harrisburg reserves the right to accept or reject the ownership and operating responsibility for any portion of the stormwater management controls. D. If the City of Harrisburg accepts ownership of stormwater BMPs, the City of Harrisburg may, at its discretion, require a fee from the applicant to the City of Harrisburg to offset the future cost of inspections, operations, and maintenance. E. It shall be unlawful to alter or remove any permanent stormwater BMP required by an approved SWM site plan, or to allow the property to remain in a condition, which does not conform to an approved SWM site plan, unless the City of Harrisburg grants an exception in writing.

Ask a question about Harrisburg law

Corpus searches the Harrisburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.