§ 9-919.1: Schedule of inspections.
A. PADEP or its designees normally ensure compliance with any permits issued, including those for stormwater management. In addition to PADEP compliance programs, the City of Harrisburg or its designee may inspect all phases of the installation of temporary or permanent stormwater management facilities. B. During any stage of earth disturbance activities, if the City of Harrisburg determines that the temporary or permanent stormwater management facilities are not being installed in accordance with the approved SWM site plan, City of Harrisburg shall revoke any existing permits or approvals until a revised SWM site plan is submitted and approved as specified in this Part 9. C. Stormwater BMPs shall be inspected by the landowner, or the landowner's designee, according to the inspection schedule described on the SWM site plan for each BMP. (1) The City of Harrisburg may require copies of the inspection reports, in a form as stipulated by the City of Harrisburg. (2) If such inspections are not conducted or inspection reports not submitted as scheduled, the City of Harrisburg, or its designee, may conduct such inspections and charge the owner appropriate fees. Nonpayment of fees may result in a lien against the property. (a) Prior to conducting such inspections, the City of Harrisburg shall inform the owner of its intent to conduct such inspections. The owner shall be given 30 days to conduct required inspections and submit the required inspection reports to the City of Harrisburg.
Ask a question about Harrisburg law
Corpus searches the Harrisburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.