For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 416.04 — Temporary Traffic Obstruction

Pittsburgh Code of Ordinances, Pennsylvania (Code 2026-11-04: eCode360 publication current through legislation 2026-11-04 (scraped 2026-11-19)) · Pittsburgh Code § 416.04

Corpus is an independent public-information project, not the official City of Pittsburgh website. Stable reference: corpuslaw.us/code/cfc9dee5-a1ce-4a81-895b-aaf9579cb2c2

§ 416.04: Temporary Traffic Obstruction.

(a) For purposes of this Chapter, a temporary traffic obstruction includes any activity that interferes with the normal operations of the public right-of-way, including but not limited to, construction or maintenance of private property requiring the use or occupancy of the public right-of-way, construction or maintenance of utilities, art installations, or other activities in the right-of-way. (b) When an application for any activity causing a temporary traffic obstruction is submitted, it shall be accompanied by: (1) A description of the impact to the public's use of the right-of-way including but not limited to restriction or closures of travel lanes, bike lanes, transit stops, street parking, and sidewalks; (2) A traffic control plan for the safe and efficient movement of vehicles, cyclists and pedestrians around the work site. (c) Traffic Control Plan. To establish the uniform, consistent, and appropriate work zone set up, the Director may require the deployment of a traffic control plan consistent with PennDOT regulations and guidance on temporary traffic control and/or require the development of a site-specific Maintenance and Protection of Traffic (MPT) Plan. (d) Maintenance and Protection of Traffic (MPT) Plan. A MPT shall include, if applicable, but not be limited to: (1) A site plan and complementary drawings which identify: the location of all proposed and existing structures; the location of proposed and existing improvements; existing site conditions such as topography and trees; (2) Screening or fencing of the construction site; (3) Temporary or permanent fences or walls; (4) Implementation of noise-reduction methods; (5) Off-site parking areas for construction personnel; (6) Use of buses or vans to transport construction personnel to/from off-site parking; (7) Location for staging vehicles, loading/off-loading equipment, and receiving deliveries; (8) Implementation of air pollution reduction methods, such as dust control, use of clean fuels, retrofitting equipment to provide additional emissions control as required by City, State or Federal laws; (9) Restricted work hours for unusually disruptive activities; (10) Soil export and regulation of truck and equipment traffic routes and hours of transport; (11) Requirements for meetings, notices and/or other methods of communicating with neighboring property owners; (12) Restoration of City streets and rights-of-way to include cleaning and repair of structural damage; (13) Use of specific equipment or construction methods and practices to reduce impacts to people, property, trees, and/or environmental critical areas; and (14) Location of towers or other types of cranes which illustrates swing radius.

[ Ord. No. 10-2016 , eff. 4-22-2016 ; Ord. No. 46-2021 , § 1, eff. 11-30-2021 ]

Ask a question about Pittsburgh law

Corpus searches the Pittsburgh sections it holds and shows the ones that match, with their citations. Free, no sign-in.