For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 480.02 — Comprehensive Playground Safety Program

Pittsburgh Code of Ordinances, Pennsylvania (Code 2026-11-04: eCode360 publication current through legislation 2026-11-04 (scraped 2026-11-19)) · Pittsburgh Code § 480.02

Corpus is an independent public-information project, not the official City of Pittsburgh website. Stable reference: corpuslaw.us/code/d72db023-8a38-41b9-a1a6-530952ff17e9

§ 480.02: Comprehensive Playground Safety Program.

(a) Comprehensive Playground Safety Program. Within one (1) year of the effective date of this section, the Department of Public Works, in consultation with the Department of Parks and Recreation, shall develop a Comprehensive Playground Safety Program which shall include, but not be limited to, the items below. This Comprehensive Playground Safety Program shall be submitted to the Mayor and Council within thirty (30) days of its completion. (b) Immediate Repair, Replacement or Removal of Major Hazards. The Department of Public Works, in consultation with the Department of Parks and Recreation, shall immediately repair, replace or remove any and all equipment presenting major hazards as identified by the Comprehensive Audit and Hazard Analysis. Equipment that presents major hazards includes, but is not limited to, entanglement hazards, entrapment hazards, hard-hitting swings, and unstable equipment. The Department shall submit to Council for its review a list of playground equipment it intends to remove prior to the time of removal. (c) Installation of Safety Surfacing in Existing Playgrounds. (1) Fall hazards created by inadequate surfaces on play areas shall be addressed expeditiously. Inadequate surfaces include, but are not limited to, surfaces consisting of asphalt, cement, grass and hard dirt. The Department of Public Works, in consultation with the Department of Parks and Recreation, shall establish a timetable for the installation of protective safety surfacing to be placed under and around each piece of playground equipment and each play structure in accordance with at least the national safety standards established in the United States Consumer Product Safety Commission "Handbook for Public Playground Safety" (CPSC, 1991). This timetable for the installation of protective safety surfacing shall be submitted to the Mayor and Council within one (1) year of the effective date of this section. (2) The Department of Public Works, in consultation with the Department of Parks and Recreation, shall conduct and complete within six (6) months of the effective date of this section, a study calculating the feasibility and cost effectiveness of installing and maintaining loose-fill surfacing materials, including, but not limited to, sand, uniform wood chips, wood mulch, and pea gravel as described in Appendix D of the United States Consumer Product Safety Commission's "Handbook for Public Playground Safety" (CPSC, 1991). While rubber matting is the preferable safety surface because it provides both protection from falls and accessibility to children and adults with disabilities, the study shall determine the feasibility of installing loose-fill safety surfacing until economic conditions permit installation of rubber matting surfacing in each and every public play area in the City. (d) Less Serious Hazards in Existing Playgrounds. The Department of Public Works, in consultation with the Department of Parks and Recreation, shall establish a timetable for the removal, repair or replacement of any and all equipment presenting hazards classified as less serious as identified by the Comprehensive Audit and Hazard Analysis. The timetable shall ensure that the less serious hazards are systematically addressed. (e) New or Renovated Playgrounds. Any new playground or play area designed, constructed, owned, operated or maintained by the City or its agents, or any single unit or play structure that undergoes renovation in an existing playground or play area shall conform to at least the safety and design specifications of the United States Consumer Product Safety Commission's "Handbook for Public Playground Safety" (CPSC, 1991) and the height specifications established in Section 4.1.5 of the Consumer Federation of America report entitled "Report and Model Law on Public Play Equipment and Areas" (Morrison and Fise, 1992). If the playground or play area will be used by more than one (1) age group the lower height requirement shall apply. Any new playground or play area designed, constructed, owned, operated or maintained by the City or its agents, or any existing playground or play area that undergoes renovation shall include the installation of safety surfacing under and around all the playground equipment, that at least conforms to the safety and design specifications of the United States Consumer Product Safety Commission's "Handbook for Public Playground Safety" (CPSC, 1991). (f) Inspection and Maintenance. The Department of Public Works, in consultation with the Department of Parks and Recreation, shall develop a plan and implement a regular schedule of inspection and maintenance conducted by trained personnel, including prompt repair or removal of hazards, for each play area and piece of play equipment owned, designed, constructed, operated or maintained by the City or its agents. The schedule shall be based at least upon the safety and design specifications found in the United States Consumer Product Safety Commission's "Handbook for Public Playground Safety" (CPSC, 1991), the recommendations of the playground equipment manufacturers/designers, and the level of use and type of equipment. This plan and schedule shall be submitted to the Mayor and Council within one (1) year of the effective date of this section, and every year thereafter.

[ Ord. 25-1993 , eff. 8-30-1993 ; Ord. 21-2004 , § 21, eff. 12-2-2004 ]

Ask a question about Pittsburgh law

Corpus searches the Pittsburgh sections it holds and shows the ones that match, with their citations. Free, no sign-in.