§ 489.08 — Construction Documents
Pittsburgh Code of Ordinances, Pennsylvania (Code 2026-11-04: eCode360 publication current through legislation 2026-11-04 (scraped 2026-11-19)) · Pittsburgh Code § 489.08
Corpus is an independent public-information project, not the official City of Pittsburgh website. Stable reference: corpuslaw.us/code/c340da09-290a-4c89-a68e-7d308b96a713
§ 489.08: Construction Documents.
(a) Construction plans and specifications shall detail the location of designated EVSE spaces, EV-ready spaces, and EV-capable spaces in parking facilities. EV parking spots should be located in close proximity to electrical panels to reduce the cost of EVSE installation. (b) Documents must also include: (1) Raceway(s) that originate at an electrical panel or subpanel and terminate near the proposed EVSE location, and into the appropriate pull-box or enclosure. (2) An electrical plan based on 40-ampere minimum branch circuits. (3) Electrical calculations that ensure that the electrical system, equipment rating, distribution transformers have sufficient capacity to serve all planned future charging stations operating at the same instance and charging EVs are their full rated amperage. (4) Assurance that the service panel or subpanel in the area can accommodate the number of individual branch circuits required to serve the future planned EVSE. (c) Any conduit pathway or other electrical infrastructure needed to install future EVSE at EV capable spaces, that would be costly to install after construction (e.g. conduit from basement electrical panels to an upper floor of a parking garage, that requires drilling) should be installed during construction at the time that EV ready conduit is installed.
[ Ord. No. 51-2021 , § 1, eff. 12-6-2021 ]
Ask a question about Pittsburgh law
Corpus searches the Pittsburgh sections it holds and shows the ones that match, with their citations. Free, no sign-in.